From Surf Wiki (app.surf) — the open knowledge base
125th Street station (IRT Lexington Avenue Line)
New York City Subway station in Manhattan
New York City Subway station in Manhattan
| Field | Value | |||||
|---|---|---|---|---|---|---|
| name | 125 Street | |||||
| image | 125th Street IRT 001.JPG | |||||
| image_caption | Station platform | |||||
| accessible | yes | |||||
| address | East 125th Street & Lexington Avenue | |||||
| New York, New York | ||||||
| borough | Manhattan | |||||
| locale | East Harlem | |||||
| coordinates | ||||||
| division | IRT | |||||
| line | IRT Lexington Avenue Line | |||||
| service | Lexington | |||||
| platforms | 2 island platforms (1 on each level) | |||||
| cross-platform interchange | ||||||
| tracks | 4 (2 on each level) | |||||
| levels | 2 | |||||
| structure | Underground | |||||
| other | NYCT Bus: , [[Image:20 airtransportation.svg | 12px | alt=Airport transportation]] | |||
| Short Line Bus: | ||||||
| [[File:BSicon BAHN.svg | 12px | alt=Railway transportation]] Metro-North: Harlem, Hudson, and New Haven Lines (at Harlem–125th Street) | ||||
| opened | ||||||
| services | {{Adjacent stations | system=New York City Subway | ||||
| line1 | Lexington express via Jerome | left1=149th Street–Grand Concourse | right1=86th Street | note-left1= | note-right1= | |
| line2 | Lexington express | left2=138th Street–Grand Concourse | right2=86th Street | note-left2= | note-right2= | to-left2=services split |
| line3 | Lexington local | left3=Third Avenue–138th Street | right3=116th Street | note-left3= | note-right3=}} | |
| footnotes | ||||||
| route_map | {{Routemap | inline=y | ||||
| legend | track | |||||
| map-title | Upper level | |||||
| map2-title | Lower level |
New York, New York cross-platform interchange Short Line Bus: |map-title = Upper level fvSTR!~MFADEg\numN330 ~~ ~~ ~~ to 138rd St–GC fvSTR!~vNULfg\uvSTR!~MFADEg ~~ ~~ ~~ to Third Ave–138th St vÜST grey!~fvSTR\uvSTRfg fvSTR!~dMFADEf\uvSTR!~dMFADEf ~~ ~~ ~~ to lower level d\fvSHI2l-\udSTR d\fSTR!~lMKRZ3+1u~F!~STR~L grey!~uSTR3~L\STR~R grey!~uSTR3~R uSTR+1~L\d!~fSTR!~lMKRZ3+1u~G!~uSTR+1~R\STR grey d\d!~v-SHI2r grey!~udSTR\v-STR grey!~fvSHI2l- uv-STRg\dPLT\fdSTRg uv-STR\dPLT\fdSTR uv-STR\dPLT\fdSTR uv-STR\dPLT\fdSTR uv-STR\dENDEa grey\fdSTR d\d!~uvSHI2l-\vSHI2g+l- grey!~fv-STR d\uvSTR!~dMFADEg\fdSTR!~dMFADEf ~~ ~~ ~~ from lower level uvSTRfg uvSTR!~MFADEf ~~ ~~ ~~ to |map2-title = Lower level \ftSTR!~MFADEg\utSTR!~MFADEg ~~ ~~ ~~ from upper level \ftSTRf\utSTRf numN330\ftv-STR\dPLT\utvSTR- \ftdSTR\dPLT\utdSTR \ftdSTR\dPLT\utdSTR \ftdSTR\dPLT\utdSTR \tdSTR2- grey!~ftdSTR\tv-STR grey!~td-STR+4 grey!~utv-SHI2r d\ftdSTR\utdSTR!~dMFADEf\tdSTR grey\ftdSTR!~dMFADEg ~~ ~~ ~~ to upper level c\ftSTR2\ftcSTRc3\tdSTR grey\ftdSTR d\ftSTRc1\d!~tSTR grey!~ftSTR+4\ftSTR d\\ftvSTRfg d\\ftvSTR!~MFADEf ~~ ~~ ~~ to fSTRq ~~ ~~ ~~ Tracks used by the uSTRq ~~ ~~ ~~ Tracks used by the STRq grey ~~ ~~ ~~ Non-revenue tracks
The 125th Street station is an express station on the IRT Lexington Avenue Line of the New York City Subway. Located at Lexington Avenue and East 125th Street (also known as Dr. Martin Luther King Jr. Boulevard) in the East Harlem neighborhood of Manhattan, it is served by the 4 and 6 trains at all times, the 5 train at all times except late nights, and the train during weekdays in peak direction. The station contains four tracks and two island platforms split across two levels. The upper level is used by northbound trains to the Bronx, while the lower level is used by southbound trains to Lower Manhattan and Brooklyn.
This station was constructed as part of the Dual Contracts by the Interborough Rapid Transit Company and opened in 1918. A planned northern extension of the Second Avenue Subway, once built, will connect with this station and with the Metro-North Railroad's Harlem–125th Street station, located one block west.
History
Construction and opening
Following the completion of the original subway, there were plans to construct a line along Manhattan's east side north of 42nd Street. The original plan for what became the extension north of 42nd Street was to continue it south through Irving Place and into what is now the BMT Broadway Line at Ninth Street and Broadway. In July 1911, the IRT had withdrawn from the talks, and the Brooklyn Rapid Transit Company (BRT) was to operate on Lexington Avenue. The IRT submitted an offer for what became its portion of the Dual Contracts on February 27, 1912.
In May 1912, it was decided to modify the planned layout of the station from three tracks and two island platforms on each level, to two tracks and one island platform per level, saving $1.25 million.
In 1913, as part of the Dual Contracts, which were signed on March 19, 1913, the Public Service Commission planned to split the original Interborough Rapid Transit Company (IRT) system from looking like a "Z" system (as seen on a map) to an H-shaped system. The original system would be split into three segments: two north–south lines, carrying through trains over the Lexington Avenue and Broadway–Seventh Avenue Lines, and a west–east shuttle under 42nd Street. This would form a roughly H-shaped system. It was predicted that the subway extension would lead to the growth of the Upper East Side and the Bronx.
The 125th Street station opened on July 17, 1918, as part of the extension of the original subway up Lexington Avenue to 125th Street and into the Bronx. Initially, service was provided only as a shuttle on the local tracks of the Lexington Avenue Line starting at Grand Central, continuing past this station and under the Harlem River to 167th Street on the IRT Jerome Avenue Line. On August 1, the "H system" was put into place, with through service beginning on the new east and west side trunk lines, and the institution of the 42nd Street Shuttle along the old connection between the sides. Express service began on this date. The cost of the extension from Grand Central was $58 million.
The opening of this station resulted in development of the surrounding neighborhood of East Harlem.
Later years
The city government took over the IRT's operations on June 12, 1940. In 1952 or 1953, a public address system was installed at this station, providing information to passengers and train crews.
In late 1959, contracts were awarded to extend the platforms at Bowling Green, Wall Street, Fulton Street, Canal Street, Spring Street, Bleecker Street, Astor Place, Grand Central, 86th Street and 125th Street to 525 feet to accommodate ten-car trains.
In 1981, the Metropolitan Transportation Authority listed the station among the 69 most deteriorated stations in the subway system. The station's elevators were installed in November 1989, making the station one of the earliest to comply with the Americans with Disabilities Act of 1990. This station was renovated in 2005.
In July 2023, as part of a pilot program to deter assaults on New York City Transit staff, the MTA painted "no standing zones" on the 125th Street station's platforms near the centers of each train.
Station layout
| **Southbound express** | toward ( late nights) (116th Street late nights, other times) → |
|---|---|
| toward weekdays, evenings/weekends (86th Street) → |
The station is unusual in design for an IRT station, being a bi-level station with island platforms. The 4 and 6 trains stop here at all times; the 5 train stops here at all times except late nights; and the train stops here during weekdays in the peak direction. The 5 train always makes express stops, and the 6 and trains always make local stops; the 4 train makes express stops during the day and local stops at night.
Unlike at other bilevel express stations on an IRT line, the tracks are not grouped so that express and local trains are on different levels. Instead, the upper platform serves northbound (uptown) trains and the lower level serves southbound (downtown) trains. Adding to the unusual design is the local track on each level having train doors open to the right; the express tracks likewise have doors opening to the left. North of the station, just after crossing the Harlem River, the line splits into the IRT Jerome Avenue Line (heading north) and the IRT Pelham Line (heading east). On the lower platform, each track comes from one line, and a flying junction south of the station allows trains to be diverted to the local or express track. The next station to the north is for trains on the Pelham Line, for afternoon trains, and for trains on the Jerome Avenue Line. The next station to the south is for local trains and for express trains. Fixed platform barriers, which are intended to prevent commuters falling to the tracks, are positioned near the platform edges.
Throughout the station's history, this station has been one of the more important on the line as it is the northernmost transfer point between express trains to the IRT Jerome Avenue and White Plains Road Lines, and local trains to the IRT Pelham Line. There is an active tower at the north end of the upper platform; it is a satellite to the tower at Grand Central–42nd Street, which controls the entire length of the Lexington Avenue Line.
Exits
This station has a mezzanine with two separate turnstile banks. The northern turnstile bank leads to two staircases going to both northern corners of Lexington Avenue and 125th Street, and an elevator going to the northeastern corner of Lexington Avenue and 125th Street. The southern turnstile bank has two exits leading to both southern corners of Lexington Avenue and 125th Street.
A fifth entrance will be built as part of the proposed Second Avenue Subway station here. It would be located on the southern side of 125th Street in the median of Park Avenue, and an ancillary facility would be located one block south. The proposed fifth exit is right underneath Metro-North Railroad's Harlem–125th Street station on Park Avenue, which is one block west of the Lexington Avenue exits. An ancillary facility would also be built at the southeast corner of 125th Street and Third Avenue.
Planned Second Avenue Subway station
Harlem–125th Street is the planned northern terminal for Phase 2 of the Second Avenue Subway. It would be built underneath 125th Street, below and perpendicular to the existing Lexington Avenue Line station. Phase 2 would stretch from 96th Street to 125th Street, with the next stations south being 116th Street and 106th Street. When opened, it will initially be served by the Q train, with the T providing service when phase 3 of the line is built.
Introduction of the station to plans
A station at Lexington Avenue and 125th Street was not on the original Second Avenue Subway proposed as part of the New York City Transit Authority's 1968 Program for Action; instead, a Second Avenue Subway station would be built at 126th Street and Second Avenue. The line was to be built in two phases—the first phase from 126th to 34th Streets, the second phase from 34th to Whitehall Streets.
In March 2007, plans for the construction of the Second Avenue Subway were revived. The line's first phase, the "first major expansion" to the New York City Subway in more than a half-century, included three stations in total and cost $4.45 to $4.5 billion,*
- spanning from 105th Street and Second Avenue to 63rd Street and Third Avenue. Phase 1 opened on January 1, 2017, with the line's northern terminal at 96th Street.
The second phase, between 125th and 96th Streets, was allocated $525 million in the MTA's 2015–2019 Capital Plan for planning, design, environmental studies, and utility relocation. This phase will complete the project's East Harlem section. The alignment will run under Second Avenue to 124th Street, before turning west on 125th Street. On October 18, 2016, the de Blasio administration announced a rezoning plan for East Harlem. One of the three Special Transit Land Use (TA) districts is for the area of the 125th Street station.
On November 21, 2016, the MTA requested that the Phase 2 project be entered into the Project Development phase under the Federal Transit Administration's New Starts program. On December 15, several elected officials for the area announced that they were seeking $6 billion of funding for Phase 2 of the line, including $2 billion from the federal government. These officials wished to secure funding from the presidential administration of Barack Obama before Obama's term ended on January 20, 2017. In their request for funding, they cited that they wanted to avoid an uncertain response from the first administration of Donald Trump and start construction on Phase 2 as soon as possible. The FTA granted this request in late December 2016. Under the approved plan, the MTA would complete an environmental reevaluation by 2018, receive funding by 2020, and open Phase 2 between 2027 and 2029. In January 2017, it was announced that Phases 2 and 3, which are expected to cost up to a combined $14.2 billion, were on the Trump administration's priority list of 50 most important transportation projects nationwide.
Current plans
In July 2018, the MTA released a supplemental environmental assessment for Phase 2 of the Second Avenue Subway. The updated report indicated that the 125th Street station would be relocated about 118 ft west and 20 ft below what had been proposed in the 2004 FEIS, to reduce impacts on nearby buildings. The proposed three-track station was reduced to two tracks. The modification would reduce flexibility, but would allow the section under 125th Street to be mined, rather than being constructed as cut-and-cover, thereby reducing impacts on nearby buildings. Simulations showed that a two-track layout could support the same level of service that the three-track layout could have provided: 28 trains per hour. To make up for the loss of the track, the tail tracks west of the station would be lengthened.
When built, this platform will be the northern terminal of the Second Avenue Subway. It will be five levels below street level, or two levels below the lower-level IRT Lexington Avenue Line platform. The station was originally proposed to have a three-track, two-island platform layout with a mezzanine above it and switches to the east of the platforms. The July 2018 plans call for two tracks and one island platform, with switches both to the west and the east. The tail tracks would extend to Lenox Avenue to allow for six trains to be stored, three per track. This would also provide a provision for a future expansion of the line along 125th Street.
Extra transfer capacity to the existing Lexington Avenue Line station would be provided as part of the construction of the Harlem–125th Street terminal. In its July 2018 supplemental report, the MTA indicated that it wanted to build new escalator entrances to the subway station complex on two of the corners at Lexington Avenue and 125th Street, replacing the existing entrances there. Entrance 1 would be located on the southeast corner, while entrance 2 would tentatively be located on the northwest corner, although this has yet to be confirmed. The original 2004 plans had called for entrance 2 to be located on the southwest corner, but the MTA stated that the location was comparatively small. The Second Avenue Subway station will include a new exit leading directly from the Second Avenue Line platform to the median of Park Avenue at the south side of 125th Street, allowing for a quick connection to the Metro-North Railroad's Harlem–125th Street station. In the 2018 report, the MTA stated that it also wanted to include a property on the intersection's southeast corner within the construction site. The ancillaries were also shifted from the locations proposed in the 2004 FEIS. Ancillary 1 and Ancillary 2, which were respectively supposed to be located at Third and Park Avenues on 125th Street, were both moved south to 124th Street. The ancillary buildings were also shifted west because the station cavern had been relocated west. Although local residents advocated for an additional entrance leading to an unused cavern under the elevated Metro-North station, the MTA ruled out this idea. The cavern contains the original routing of the Park Avenue main line, which was abandoned in 1897 when the current elevated station was completed.
Construction progress
The construction of the Second Avenue Subway was expected to improve quality of life around the existing subway station at Lexington Avenue, which was notorious for crime and drug use. In August 2025, the MTA board awarded a $1.97 billion contract to Connect Plus Partners, a joint venture between Halmar International and FCC Construction. The contract includes the construction of the 125th Street station shell, reconstruction of the existing tunnel near the 116th Street station, and new tunnels between Second Avenue–120th Street and Lenox Avenue–125th Street. Also in 2025, the MTA requested that the site of the Second Avenue Subway's 125th Street station be rezoned to allow the construction of 684 apartments above the station entrance.
Second Avenue Subway Community Information Center
A Second Avenue Subway Community Information Center for Phase 2, along 125th Street between Park and Madison Avenues, was originally planned to open in May 2017. The center's opening was delayed to September 18, 2017.
Media
The station is mentioned by Lou Reed in his 1967 song "I'm Waiting for the Man", performed with The Velvet Underground, in which he describes traveling to Harlem to purchase heroin: "Up to Lexington / One-two-five / Feeling sick and dirty / More dead than alive."
Gallery
File:125th Street IRT 003.JPG|Mosaic with depiction of bridge File:4 train leaving Harlem on August night.jpg| train leaving the station File:125polyrhythmics.jpg|Polyrhythmics of Consciousness and Light mosaic
Notes
--
References
References
- {{cite NYC bus map. M
- (1918). "Fifty Years of Rapid Transit — 1864 to 1917". Law Printing.
- (May 22, 1912). "Petition for Subway in Lexington Ave.". The New York Times.
- (January 13, 1913). "Report of the Public Service Commission For The First District of The State of New York For The Year Ending December 31, 1912 Vol. I.". New York State Public Service Commission.
- (March 20, 1913). "Subway Contracts Solemnly Signed; Cheers at the Ceremonial Function When McCall Gets Willcox to Attest.". The New York Times.
- (March 19, 1913). "Money Set Aside For New Subways; Board of Estimate Approves City Contracts to be Signed To-day with Interboro and B.R.T.". The New York Times.
- (1916). "Engineering News-record". McGraw-Hill Publishing Company.
- (March 10, 1918). "The Seventh and Lexington Avenue Subways Will Revive Dormant Sections — Change in Operation That Will Transform Original Four-Tracked Subway Into Two Four-Tracked Systems and Double Present Capacity of the Interborough". The New York Times.
- (May 19, 1918). "Public Service Commission Fixes July 15 For Opening of The New Seventh and Lexington Avenue Subway Lines — Will Afford Better Service and Less Crowding — Shuttle Service for Forty-Second Street — How the Various Lines of the Dual System Are Grouped for Operation and List of Stations on All Lines". The New York Times.
- (July 17, 1918). "Lexington Av. Line to be Opened Today". The New York Times.
- (1918-07-17). "Lexington Subway to Operate To-day". New York Herald.
- (August 2, 1918). "Open New Subway Lines to Traffic; Called a Triumph — Great H System Put in Operation Marks an Era in Railroad Construction — No Hitch in the Plans — But Public Gropes Blindly to Find the Way in Maze of New Stations — Thousands Go Astray — Leaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor". The New York Times.
- (1918-08-02). "New "H" System Brings Worst Subway Jam". New-York Tribune.
- (July 11, 1918). "Finish a New Link of the Dual Subway; Lexington Avenue Line North of Forty-second Street to Begin Local Service Wednesday. Branch Extends to Bronx Through service, with Times SquareGrand Central Shuttle Connections, to Open Soon. Changes in the Bronx.". The New York Times.
- (August 11, 1918). "Business Growth in East Harlem; New Subway Will Benefit the Hitherto Quieter Section of 125th Street. Improving Old Holdings Good Rental Season Even at Slightly Advanced Rates--Private Houses Remodeled.". The New York Times.
- (1940-06-13). "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times.
- (June 13, 1940). "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune.
- (February 7, 1953). "More Subway Loudspeakers". The New York Times.
- (1959). "Annual Report For The Year Ending June 30, 1959". New York City Transit Authority.
- (June 11, 1981). "Agency Lists Its 69 Most Deteriorated Subway Stations". [[The New York Times]].
- Simko-Bednarski, Evan. (July 12, 2023). "MTA hopes 'no standing' area cuts assaults on subway conductors".
- {{NYCS const. timetable. 4
- {{NYCS const. timetable. 6
- {{NYCS const. timetable. 5
- {{NYCS const. trackref. trackbook3
- {{NYCS const. map
- Wassef, Mira. (July 18, 2025). "Platform barriers installed at 56 subway stations in NYC".
- Russo-Lennon, Barbara. (July 20, 2025). "These are the NYC subway stations that now have protective platform barriers".
- (April 2018). "125th Street Neighborhood Map". Metropolitan Transportation Authority.
- (April 5, 2016). "Second Avenue Subway Update to Community Board 11". Metropolitan Transportation Authority.
- (June 18, 2018). "Capital Program Oversight Committee Meeting 6/18/2018". Metropolitan Transportation Authority.
- (April 2018). "Second Avenue Subway Phase 2". Metropolitan Transportation Authority.
- (June 3, 2003). "Second Avenue Subway Station Entrances Community Board 11". Metropolitan Transportation Authority.
- "The New York Transit Authority in the 1970s".
- (August 1971). "Draft Environmental Statement, Second Avenue Subway, Route 132-A". nycsubway.org.
- Neuman, William. (April 9, 2007). "Is That Finally the Sound of a 2nd Ave. Subway?". The New York Times.
- (December 18, 2015). "The Second Avenue subway explained". am New York.
- (September 16, 2015). "Drone takes tour of NYC's 2nd Avenue subway line".
- Nonko, Emily. (January 30, 2014). "Updates on NYC's Biggest Subway Projects: Second Avenue and East Side Access". NewYork.com.
- McCowan, Candace. (December 31, 2016). "Decades in the making, Second Avenue Subway set to open to the public".
- (January 1, 2017). "Highlights From the Opening of the Second Avenue Subway". The New York Times.
- Fitzsimmons, Emma G.. (October 29, 2015). "Anger in East Harlem Over New Delays in 2nd Ave. Subway Plans". The New York Times.
- (October 28, 2015). "MTA Capital Program 2015-2019". Metropolitan Transit Authority.
- (2004). "Second Avenue Subway 2004 FEIS Figure F-1 125th Street Station Study Area for Potential Easements or Acquisitions". Metropolitan Transportation Authority.
- (May 2016). "MTA Capital Program 2015 – 2019 Capital Plan Renew. Enhance. Expand. As Approved by MTA Board April 20, 2016. As Approved by the CPRB May 23, 2016.". Metropolitan Transportation Authority.
- Baird-Remba, Rebecca. (October 18, 2016). "Initial East Harlem Rezoning Plan Promises 30-Story Towers and Less Parking - New York YIMBY". New York YIMBY.
- (October 18, 2016). "East Harlem Neighborhood Study - Draft Planning Framework". NYC Planning - DCP Manhattan Office.
- Garliauskas, Lucy. (December 23, 2016). "Re: Project Development Initiation – Second Avenue Subway Phase 2". Federal Transit Administration.
- Barone, Vincent. (December 15, 2016). "Officials look to secure federal funds for 2nd Ave. subway". amNY.
- Krisel, Brendan. (December 23, 2016). "Phase 2 of 2nd Avenue Subway Clears Preliminary Funding Hurdle". Harlem, NY Patch.
- (December 27, 2016). "New York City 2nd Ave Subway Phase 2 Profile". FTA.
- Mocker, Greg. (January 27, 2017). "Second Avenue Subway expansion to be added to Trump's infrastructure priorities, congresswoman says". New York's PIX11 / WPIX-TV.
- Fox, Alison. (January 26, 2017). "Second Avenue subway a priority for Trump, Rep. Maloney says". am New York.
- (July 2018). "Supplemental Environmental Assessment to the Second Avenue Subway Final Environmental Impact Statement: Phase 2 - Chapter 2". Metropolitan Transportation Authority.
- (September 25, 2017). "Capital Program Oversight Committee Meeting – September 25, 2017". [[Metropolitan Transportation Authority]].
- (September 25, 2017). "MTA Board - CPOC Committee Meeting - 09/25/2017". Metropolitan Transportation Authority.
- (May 2004). "Second Avenue Subway Final Environmental Impact Statement (FEIS), May 2004 Figure 2-4 Track Diagram, North of 55th Street". Metropolitan Transportation Authority.
- (April 2003). "Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS), Figure 2-8 Conceptual Drawing of the 125th Street Station". Metropolitan Transportation Authority.
- (May 2004). "Second Avenue Subway Final Environmental Impact Statement (FEIS): Chapter 3: Description of Construction Methods and Activities". [[Metropolitan Transportation Authority]].
- Khalifeh, Ramsey. (September 11, 2025). "East Harlem leaders want MTA to repurpose train station abandoned in 1800s".
- Khalifeh, Ramsey. (July 15, 2025). "As MTA moves ahead with 2nd Avenue subway extension, East Harlem locals brace for change".
- Russo-Lennon, Barbara. (August 18, 2025). "MTA board approves $2 billion contract to extend Second Avenue Subway into East Harlem".
- Spivack, Caroline. (August 18, 2025). "Second Avenue subway extension on fast track with $1.9B contract approval".
- Garber, Nick. (May 13, 2025). "MTA wants rezoning for 684 apartments atop Second Avenue subway extension".
- Hallum, Mark. (May 13, 2025). "MTA Applies for Zoning Change to Build Homes Near Second Avenue Subway".
- Mocker, Greg. (April 24, 2017). "Information center opening in May for next phase of Second Avenue Subway". New York's PIX11 / WPIX-TV.
- Martinez, Jose. (September 22, 2017). "New center gives glimpse of Second Avenue Subway's future". Spectrum News - NY1.
- Tucker, Ken. (September 28, 2022). "'Words & Music' offers 15 demos Lou Reed recorded as a fledgling artist".
- Wright, Craig. (February 27, 2023). ""I'm Waiting For The Man" by Lou Reed (1965): The Certain Songs Project Pt. 6".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about 125th Street station (IRT Lexington Avenue Line) — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report