Skip to content
Surf Wiki
Save to docs
general/interborough-rapid-transit-company

From Surf Wiki (app.surf) — the open knowledge base

4 (New York City Subway service)

Rapid transit service

4 (New York City Subway service)

Rapid transit service

FieldValue
service4
nameLexington Avenue Express
image1File:Woodlawn Bound 4.jpg
size1250px
caption1A Woodlawn-bound 4 train of R142As leaving Bedford Park Boulevard–Lehman College.
north termWoodlawn
south termCrown Heights–Utica Avenue (daytime)
New Lots Avenue (late nights & limited rush hour service)
stations28
54 (late night service)
notedashed line shows late night and limited weekday rush hour service to/from New Lots Avenue
depotJerome Yard
started
map{{switcher
{{maplink-roadfrom4 (New York City Subway service).map}}
map_statecollapsed

New Lots Avenue (late nights & limited rush hour service) 54 (late night service) | |Show interactive map | |Show route diagram The 4 Lexington Avenue Express is a rapid transit service in the A Division of the New York City Subway. Its route emblem, or "bullet", is colored since it uses the IRT Lexington Avenue Line in Manhattan.

The 4 operates 24 hours daily, although service patterns vary based on the time of day. Daytime service operates between Woodlawn in the Bronx and Utica Avenue in Crown Heights, Brooklyn, making all stops in the Bronx and express stops in Manhattan and Brooklyn; limited rush hour service, as well as overnight service, is extended seven stops beyond Utica Avenue and originates and terminates at New Lots Avenue in East New York, Brooklyn. During rush hours in the peak direction, the 4 skips 138th Street–Grand Concourse. Overnight service makes all stops along the full route, but skips Hoyt Street in both directions. For up to an hour after evening events that are held at Yankee Stadium, a special downtown-only express service runs between and .

Until 1983, rush hour 4 trains originated and terminated at Flatbush Avenue–Brooklyn College in Brooklyn.

Service history

Under the Interborough Rapid Transit

Service on what was later known as the 4 began on June 2, 1917, as the first portion of the IRT Jerome Avenue Line opened between 149th Street-Grand Concourse and Kingsbridge Road. Since the extension of the IRT Lexington Avenue Line between 149th Street and Grand Central was not yet open, this section was served by shuttle trains using elevated train cars. On April 15, 1918, with the extension of the Jerome Avenue Line to Woodlawn, shuttle service was also extended. On July 17, 1918, the Lexington Avenue Line local tracks were opened, allowing another shuttle service to run between 149th Street–Grand Concourse and Grand Central. On August 1, 1918, the entire Jerome and Lexington Avenue Lines were completed and the connection to the IRT Broadway–Seventh Avenue Line at 42nd Street was removed. Trains began running between 167th Street and Bowling Green, with shuttles to Woodlawn.

On December 11, 1921, Lexington Avenue–Jerome Avenue subway trains began running north of 167th Street at all times replacing elevated trains, which ran to Woodlawn during rush hours, but from then on terminated at 167th Street during non-rush hours.

At a hearing of the New York State Transit Commission on October 15, 1924, about where it planned to allocate the second 100 of 350 new steel cars, it was announced that service on the IRT Eastern Parkway Line from Atlantic Avenue to Livonia Avenue was almost certainly going to be increased by 25 to 50% in the coming six to eight weeks. Two options were discussed at the hearing. The commission, in response to intense requests from riders on the line, called for the introduction of express service between Atlantic Avenue and Utica Avenue on tracks which had been unused since the line's opening in 1920. It proposed extending half of 4 trains from Atlantic Avenue to New Lots Avenue, running express to Utica Avenue. The introduction of express service would have made it possible to run 30 more trains per hour east of Atlantic Avenue (27 trains per hour had been operating), decreasing overcrowding from 325% to 185%. The plan preferred by the IRT was to place 70 cars on the West Side Line for service to Flatbush Avenue, and Pennsylvania Avenue and New Lots Avenue, and 40 additional cars for service along Eastern Parkway.

On November 17, 1924, the Transit Commission ordered the IRT to use 100 new subway cars to increase service by no later than December 1. Among the changes in service ordered was the operation of through service on the 4 between Kingsbridge Road and Woodlawn, eliminating shuttle service. This change was made possible by twenty of the new cars. The Transit Commission heeded the IRT's recommendation not to have half of 4 trains run express due to the dangerous operating condition it would have created. The IRT stated that two minutes would not be enough time to turn around trains terminating at Atlantic Avenue while maintaining the headway between trains and that this service pattern would risk train collisions. Operating this service pattern would have required minutes to turn around trains, which would reduce capacity by 25%. While operating all 4 trains to Utica Avenue would have obviated the problem, the IRT did not have enough cars to run such a service. Instead, the Transit Commission accepted the IRT's plan to allocate 70 new cars to West Side express service to Brooklyn. Express service along Eastern Parkway would start at the earliest in February 1925 when additional new cars arrived.

Beginning on November 4, 1925, 4 trains were extended from Atlantic Avenue to Utica Avenue during rush hours, from 6:30 to 9:30 a.m. and 5 to 7 p.m., allowing for the introduction of express service along this section of the IRT Eastern Parkway Line. This extension was made possible by the delivery of the last of 350 new steel cars. The increased service required 80 cars, or eight trains of ten cars each.

On November 23, 1927, evening 4 service was extended from Atlantic Avenue to Utica Avenue between 7:14 and 8:00 p.m. After the Transit Commission determined that this was not a sufficient increase in service, it announced on November 26 that evening 4 service to Utica Avenue would continue until 1 a.m. This change took place on December 5, and increased service between Atlantic Avenue and Utica Avenue by 100%. The following year, midday 4 service also went to Utica Avenue.

In April 1930, service was increased from running every 6 minutes to every 5 minutes heading southbound at 125th Street between 6 and 8 p.m. and from running every 8 minutes to every 6 minutes northbound at 125th Street between 7:30 and 9:00 p.m. In addition, trains that had formerly terminated at South Ferry from 7:26 p.m. to 8:44 p.m. were extended to Utica Avenue.

The span of Sunday express service from Utica Avenue was extended by 54 minutes on February 22, 1931, with express service beginning at 12:56 p.m. instead of 1:50 p.m. Effective April 13, 1931, trains that terminated at Atlantic Avenue between 12:45 and 2:45 a.m. on Mondays were extended to Utica Avenue to reduce a transfer for riders at Nevins Street and to provide service from Manhattan's East Side to Utica Avenue every ten minutes. On July 12, 1931, Sunday late night trains that terminated at Atlantic Avenue until 2:40 a.m. were extended to Utica Avenue.

As of 1934, 4 trains ran from Woodlawn to Utica Avenue weekday rush and Saturday morning peak and afternoon; to Atlantic Avenue weekday midday, Saturday morning after the peak, and late nights; and to South Ferry evenings and Sundays. Trains ran express in Manhattan, except during late nights, and in Brooklyn. This was the first time the 6 became the Pelham Shuttle between Pelham Bay Park and 125th Street–Lexington Avenue.

On August 20, 1938, Saturday morning after peak service was extended to Utica Avenue.

Under the New York City Board of Transportation

Beginning on May 10, 1946, all 4 trains were made express during late nights running on twelve-minute headways as the 6 went back to Brooklyn Bridge during that time. Previously 4 trains ran local from 12:30 to 5:30 a.m. At this time 4 trains terminated at Atlantic Avenue.

Beginning on December 16, 1946, trains were extended from Atlantic Avenue to New Lots Avenue during late nights, running express between Atlantic and Franklin Avenues.

The IRT routes were given numbered designations with the introduction of "R-type" rolling stock, which contained rollsign curtains with numbered designations for each service. The first such fleet, the R12, was put into service in 1948. The Lexington–Jerome route became known as the 4.

During 1950, Saturday morning service was cut back to South Ferry.

Starting on December 15, 1950, four 4 trains began operating during rush hours in the peak direction to and from Flatbush Avenue on the Nostrand Avenue Line, with the four trains in the AM rush hour leaving every 16 minutes between 7:59 and 8:47 a.m., and the four trains in the PM rush hour arriving every 16–20 minutes between 5:20 and 6:13 p.m. Also on that day, weekday midday service was cut back from Atlantic Avenue to South Ferry. Additionally, on January 18, 1952, 4 service to Atlantic Avenue during weekday middays was restored.

Under the New York City Transit Authority

On March 19, 1954, late-night service in Brooklyn became local, but resumed operating express between Atlantic and Franklin Avenues on June 29, 1956.

On May 3, 1957, the weekday rush trains to Flatbush Avenue were discontinued, while at the same time evening, Saturday, and Sunday afternoon trains were extended to Utica Avenue, while Sunday morning trains were extended to Atlantic Avenue.

Starting on March 1, 1960, late-night 4 trains resumed making all stops in Manhattan; this was the first time the 4 and 6 ran local in Manhattan together late nights. This arrangement ended on October 17, 1965, when the 4 went back express in Manhattan late nights.

Beginning on April 8, 1960, nearly all morning rush hour 4 trains ran to Flatbush Avenue, and evening rush hour 4 trains alternated between Flatbush and Utica Avenues. During weekday evenings and late nights 4 trains also went to Flatbush Avenue, making all stops in Brooklyn. On November 14, 1966, three trains that terminated at Utica Avenue were rerouted to terminate at Flatbush Avenue.

As a result of the opening of the main portion of the Chrystie Street Connection along the Manhattan Bridge on November 26, 1967, the 4 train was color-coded magenta under the first color scheme. The color coding of lines was introduced as a matter of having a universal system of signage and nomenclature.

By 1972, the 4 began to skip 138th Street weekdays during rush hours in the peak direction which it continues to do (mornings to Manhattan and evenings from there). At that time, the 4 went to Atlantic Avenue at all times but was extended to Utica Avenue rush hours running express in Brooklyn along Eastern Parkway. Select 4 trains also ran to Flatbush Avenue rush hours as well running express between Atlantic and Franklin Avenues, and late-night service made all stops in Brooklyn to Flatbush Avenue.

On May 23, 1976, Sunday morning trains were extended to Utica Avenue, running express in Brooklyn.

Effective June 1979, the 4 train assumed its current line color of forest green as a result of a nomenclature update to assign colors to a trunk line, plus line colors not serving Manhattan.

Beginning on January 13, 1980, all 4 trains resumed operating local in Manhattan during late night hours to replace the , which again became the Pelham Shuttle between 125th Street and Pelham Bay Park. This service cut affected 15,000 riders and was criticized by Manhattan Borough President Andrew Stein as no public hearing was held.

On July 10, 1983, rush hour 4 trains were rerouted from Flatbush Avenue to Utica Avenue, and late evening and late night and Sunday morning service was rerouted from Flatbush Avenue to New Lots Avenue, making all local stops.

On August 29, 1988, weekday midday 4 trains were extended from Atlantic Avenue to Utica Avenue, made possible by the termination of 5 service at Bowling Green. In addition, service was increased 50% during evenings between 8 p.m. and midnight, on Saturday afternoon, and on Sunday between 10 a.m. and 7 p.m. In January 1989, during middays, southbound service resumed operating express between Franklin Avenue and Utica Avenue following the elimination of 5 train layups.

Late night express service was reinstated from January 21, 1990, to October 5 of that year, as a result of the 6 being extended back to Brooklyn Bridge during that time.*

  • While late night 6 service to Brooklyn Bridge was permanently restored on October 3, 1999, the 4 continued to run local at those times, providing Lexington Avenue local stations service every ten minutes.*

In January 1991, a reduction of service along the Eastern Parkway corridor to remove excess capacity was proposed. Weekend daytime 4 service would be extended beyond its terminal at Utica Avenue and originate and terminate at New Lots Avenue. Trains would operate local in Brooklyn south of Franklin Avenue. This service change would have been implemented in July 1991, pending approval from the MTA board.

Recent changes

161st Street–Yankee Stadium

From April 2000 to August 2001, midday 4 service was temporarily cut back from Utica Avenue to Atlantic Avenue to accommodate the rebuilding of the IRT New Lots Line. 3 train service was split into two sections to allow for the line to be rebuilt, with transfers available at Utica Avenue. Work took place on weekday middays between 10 a.m. and 3 p.m., and New Lots service operated in one of three ways: shuttle buses replaced trains, all trains operated in both directions on a single track, or shuttle trains ran. 4 trains terminated at Atlantic Avenue when shuttle or single-track trains were in operation.

After the September 11, 2001 attacks, 4 service was initially split in two sections, with the northern section operating between Woodlawn and Grand Central–42nd Street or Brooklyn Bridge and the southern section operating between Atlantic Avenue and New Lots Avenue. There was no southbound service between Grand Central and Brooklyn Bridge, which meant southbound trains discharged at Grand Central, operated out of service to Brooklyn Bridge, and re-entered service at Brooklyn Bridge in the northbound direction. By the evening of September 12, service was restored along the full route, but trains skipped 14th Street–Union Square in both directions. By September 17, trains were only skipping Wall Street, which reopened on the evening of September 19.

From June 8 to June 26, 2009, New York City Transit conducted a pilot program for express Jerome Avenue Line service. During a one hour period, four morning weekday rush hour trains from Woodlawn only stopped at Mosholu Parkway, Burnside Avenue and 149th Street–Grand Concourse before resuming regular service in Manhattan and Brooklyn. The express was expected to save riders minutes. The pilot was made possible due to signaling upgrades to the line's center track made as part of the 2005–2009 Metropolitan Transportation Authority Capital Program.

On July 6, 2009, select Bronx-bound 4 trains began running express from 167th Street to Burnside Avenue to terminate at the latter station before running out of service to the Jerome Yard.

On October 26, 2009, another 4 express pilot program was implemented based on the success of the first and ran until December 11, 2009. This program was the same as the one in June except that express trains stopped at Bedford Park Boulevard–Lehman College. This express service was expected to cut runtime by 4 minutes.

As a result of planned repairs to Hurricane Sandy-related damage in the Clark Street Tube, which carries the IRT Broadway–Seventh Avenue Line, the 4 was extended to New Lots Avenue on weekends from June 17, 2017, to June 24, 2018, making local stops in Brooklyn south of Nevins Street in place of the .

On November 17, 2019, New York City Transit made adjustments to weekday evening 3, 4, and 5 service in order to accommodate planned subway work. Late night 4 service to New Lots Avenue started an hour earlier, at 10:30 p.m. instead of 11:30 p.m., replacing 3 service, which was cut back to Times Square–42nd Street. This change, which was approved by the MTA Board on June 27, 2019, was expected to save the agency $900,000 annually.

Route

Signage history

File:R12 IRT 4.gif|Pre-1967 bullet used on the R12s to R36s File:4 (1967-1979 New York City Subway bullet).svg|1967–1979 bullet File:NYCS-bull-trans-4.svg|Bullet used since 1979

Service pattern

The following table shows the lines used by the 4, with shaded boxes indicating the route at the specified times:

LineFromToTracksTimesall ex. nightslate nightsrush hours
IRT Jerome Avenue Line (full line)Woodlawn[183rd Street](183rd-street-station-irt-jerome-avenue-line)localMost trains
Burnside Avenue[170th Street](170th-street-station-irt-jerome-avenue-line)
expressLimited service (NB only)
[167th Street](167th-street-station-irt-jerome-avenue-line)[149th Street–Grand Concourse](149th-street-grand-concourse-irt-jerome-avenue-line)local
[138th Street–Grand Concourse](138th-street-grand-concourse-irt-jerome-avenue-line)
express
IRT Lexington Avenue Line (full line)[125th Street](125th-street-irt-lexington-avenue-line)Brooklyn Bridge–City HallSpecial events (SB only)
local
Fulton StreetBowling Greenall
Joralemon Street Tunnel
IRT Eastern Parkway Line (full line)Borough HallNevins Streetexpress
Atlantic Avenue–Barclays CenterCrown Heights–Utica AvenueMost trains
localVery limited service
IRT New Lots Line (full line)Sutter Avenue–Rutland RoadNew Lots AvenueallLimited service

Stations

For a more detailed station listing, see the articles on the lines listed above.

[[File:NYCS-bull-trans-4-Std.svg20px4 service to Woodlawn]]
Wood[[File:NYCS-bull-trans-4-Std.svg20px4 service to Burnside Avenue]]
Burn[[File:NYCS-bull-trans-4-Std.svg20px4 service to 161st Street]]
161StationsSubway transfersConnections/Notes
The Bronx
Jerome Avenue Line
align=center rowspan=6align=center rowspan=11
Some southbound rush hour trips begin at this station
Some northbound p.m. rush hour trips terminate at this station
Some southbound p.m. rush hour trips begin at this station
Bx12 Select Bus Service
Some northbound rush hour trips terminate at this station
(IND Concourse Line)
(IRT White Plains Road Line)
Manhattan
Lexington Avenue Line
↑Only the northbound local platform, served only during late nights, is accessible.
(BMT Broadway Line at Lexington Avenue/59th Street)
Out-of-system transfer with MetroCard/OMNY:
([63rd Street Lines](63rd-street-lines) at )
(IND Queens Boulevard Line at )
(IRT Flushing Line)
([42nd Street Shuttle](42nd-street-shuttle))
[[File:Aiga elevator.svg20pxalt=Elevator access to mezzanine only]]
(BMT Canarsie Line)
(BMT Broadway Line)
(IND Sixth Avenue Line at Broadway–Lafayette Street)
(BMT Broadway Line)
(BMT Nassau Street Line)
(BMT Nassau Street Line at Chambers Street)
(IRT Broadway–Seventh Avenue Line)
(IND Eighth Avenue Line)
(BMT Nassau Street Line)
Brooklyn
Eastern Parkway Line
align=center rowspan="10"
(IRT Broadway–Seventh Avenue Line)
(BMT Fourth Avenue Line at Court Street)
(BMT Brighton Line)
(BMT Fourth Avenue Line)LIRR Atlantic Branch at Atlantic Terminal
(BMT Franklin Avenue Line at Botanic Garden)
B46 Select Bus Service
All severe weather trips terminate at this station.
**New Lots Line** (late nights and select rush hour trips)
align=center rowspan=7 colspan="2"
Out-of-system transfer with MetroCard/OMNY:
(BMT Canarsie Line at )
B15 bus to JFK Int'l Airport

In film and literature

The 4 train is featured prominently in the 2025 Spike Lee film Highest 2 Lowest.

Notes

References

References

  1. {{NYCS const. timetable. 4
  2. "Mta.info | Line Colors".
  3. (August 19, 2021). "138 St-Grand Concourse – OpenMobilityData".
  4. (August 19, 2021). "138 St-Grand Concourse – OpenMobilityData".
  5. "NYCT Line by Line History".
  6. (December 11, 1921). "An Improvement in Service for Passengers on the Jerome Avenue Line North of 167th Street". Interborough Rapid Transit Company.
  7. (October 16, 1924). "I.R.T. Will Get Increased Service To Livonia Avenue: Practically Certain That 100 New Cars Will Be Put on Eastern Parkway Line.". Brooklyn Times Union.
  8. (November 17, 1924). "Transit Board Orders I.R.T. To Increase Service: Demands More Trains in Rush Hour by Use of New Cars.". Brooklyn Times Union.
  9. (November 17, 1924). "100 I.R.T. Cars To Be Used On Borough Lines". The Brooklyn Citizen.
  10. (November 17, 1924). "Orders I.R.T. To Improve Service". Brooklyn Standard Union.
  11. (November 17, 1924). "Hundred I.R.T. Cars To Bring Big Relief In Eastern Parkway: New Equipment, Recently Delivered, Will Increase Service 30 Per Cent. On Important Borough Lines, Commissioner McAneny Announces. Opening of Express Service Between Utica and Atlantic Aves. Off 3 Months.". The Brooklyn Citizen.
  12. (November 1925). "Increased I.R.T. Subway Service in Brooklyn". Interborough Rapid Transit Company.
  13. (October 25, 1925). "At Least I.R.T. Expresses Will Run Under Parkway: Two Tracks Will End Their Long Career of Idleness a Week from Wednesday.". Brooklyn Standard Union.
  14. (November 3, 1925). "More I.R.T. Trains For Rush Hours To Operate Tomorrow: Brooklyn Gets Improved Service at Cost of $3,000,000—President Hedley Makes Inspection Trip.". Brooklyn Standard Union.
  15. (October 25, 1925). "I.R.T. Will Start Express Service In Boro Nov. 4: Ninety New Cars Added on Flatbush Ave. And Eastern Parkway Lines. Rush Hour Aid First. Three Million Dollar Outlay Will Mean 20 to 100 P.C. Better Handling of Crowds.". Brooklyn Times Union.
  16. (November 27, 1927). "100 P.C. Increase In I.R.T. Service: More Trains on Schedule Between Atlantic and Utica Avenues at Night.". Brooklyn Times Union.
  17. New York (State). Transit Commission.. (1930). "Tenth Annual Report, 1930". Albany, N.Y. : J.B. Lyon Co..
  18. (1922). "Eleventh Annual Report For The Calendar Year 1931". New York State Transit Commission.
  19. (May 9, 1946). "24-Hour Express Service on IRT To Become Effective at Midnight". New York Times.
  20. (1949). "Report for the Three and One-Half Years Ending June 30, 1949.". New York City Board of Transportation.
  21. (December 12, 1946). "City to Increase Subway Service On the IRT and BMT Lines Today". New York Times.
  22. Brown, Nicole. (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious".
  23. (April 1960). "A Summary of Services on the IRT Division, NYCTA". Electric Railroaders' Association.
  24. (December 15, 1950). "Brooklyn I.R.T. Change; 4 Lexington Avenue Expresses to Serve Flatbush Station". The New York Times.
  25. (January 10, 1952). "Changes on I.R.T. Set: Additional Express Service on Brooklyn, Flushing Lines Day". New York Times.
  26. (February 1967). "IRT Change, Painting, Uniforms, Other NYCTA Notes". Electric Railroaders' Association.
  27. (1972). "1972 New York City Subway Map". New York City Transit Authority.
  28. Hogarty, Dave. (August 3, 2007). "Michael Hertz, Designer of the NYC Subway Map". [[Gothamist]].
  29. (December 1979). "January 1980 IRT Service Changes". New York Division Bulletin.
  30. (January 11, 1980). "Suit Seeks to Bar Cutbacks on Lexington Ave. Subways". New York Daily News.
  31. (July 1983). "New IRT Schedules – Increased Service to Flatbush Avenue". New York Division Bulletin.
  32. (February 26, 1983). "Notice of Public Hearing". New York Amsterdam News.
  33. (January 4, 1991). "1991 Service Capacity Plan". New York City Transit Authority.
  34. (April 2000). "Timetable for Subway Service on the 4 Train Effective Spring 2000". New York City Transit.
  35. (November 9, 2000). "Weekly Subway Service Advisories Updated Nov 9, 2000". Metropolitan Transportation Authority.
  36. (October 2001). "World Trade Center Destroyed". Electric Railroaders' Association.
  37. (June 4, 2009). "MTA New York City Transit Pilots Bronx Express Service Along the Jerome Ave. Line". Metropolitan Transportation Authority.
  38. (June 10, 2009). "Bronx Express Pilot Program June 8 to 26, Monday to Friday, 7 AM to 8 AM". Metropolitan Transportation Authority.
  39. (November 22, 2009). "Bronx Express Phase II October 26 to December 11, Monday to Friday, 7 AM to 8:20 AM". Metropolitan Transportation Authority.
  40. (December 12, 2016). "Transit & Bus Committee Meeting December 2016". [[Metropolitan Transportation Authority]].
  41. (June 8, 2017). "Clark St Tunnel Reconstruction Weekend Service Changes". Metropolitan Transportation Authority.
  42. (June 24, 2019). "Transit and Bus Committee Meeting June 2019". Metropolitan Transportation Authority.
  43. (November 17, 2019). "5 Subway Timetable Effective November 17, 2019". Metropolitan Transportation Authority.
  44. {{NYCS const. serviceguide
  45. (August 8, 2021). "5:33 AM – 6:51 AM Woodlawn – OpenMobilityData".
  46. (August 8, 2021). "5:04 AM – 6:13 AM Crown Hts-Utica Av – OpenMobilityData".
  47. "New York City Subway Severe Winter Weather". MTA.
  48. "New York City Subway Severe Winter Weather". MTA.
  49. (13 August 2025). "Spike Lee and Denzel Washington Fall Back in Love with New York in Highest 2 Lowest". Paste.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about 4 (New York City Subway service) — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report