From Surf Wiki (app.surf) — the open knowledge base
Valencia Metro (Venezuela)
Public Transit system in Valencia, Venezuela
Public Transit system in Valencia, Venezuela
| Field | Value |
|---|---|
| name | Valencia Metro |
| image | Metro de Valencia, Venezuela.jpg |
| imagesize | 265px |
| caption | Coupled Siemens vehicles |
| locale | Valencia, Carabobo, Venezuela |
| transit_type | Rapid transit/Light metro |
| lines | 1 (with more planned) |
| stations | 7 |
| ridership | 62,000 (2011) |
| website | [Metro Valencia C.A.](http://www.metrovalencia.gob.ve) |
| began_operation | 18 November 2007 |
| vehicles | 12 Siemens SD-460 |
| 2-car trainsets | |
| system_length | 7.7 km |
2-car trainsets

The Valencia Metro (Spanish: Metro Valencia or Metro de Valencia) is the public mass transit system of Valencia, Carabobo, Venezuela and its suburbs Naguanagua Municipality and San Diego Municipality.
Operations
The metro system was officially opened to the public on 18 November 2006 with just 3 of 7 stations along the original 4.7 km Line 1 route open for service, and operating for limited hours while providing service free of charge. Normal revenue service with all 7 stations along Line 1 began 18 November 2007.
Although the fleet comprises twelve Siemens SD-460 2-car light rail vehicle trainsets, the Valencia system is a light metro, running on a completely grade-separated route (other than within its own maintenance yard) that does not share space with any other traffic.
Valencia Metro operates Monday-Friday from 6am to 8:30pm; Saturday, Sunday and holidays from 6:00am to 7:30pm. An adult fare of 0.5 BsF (23 US cents) and a student fare of 0.15 BsF (7 US Cents) is charged to ride the metro. An average of 62,000 passengers are transported daily.
Lines
Currently the Valencia Metro operates Line 1 for service.
Future
Extension of the existing north-south route - Lines 2 & 3
A further 4.3 km section (Line 2) of the same north-south route as Line 1 is under construction, and a third 5.6 km section (Line 3) in the engineering and environmental impact phases. Thus, of the full 14.6 km north-south route, only 4.7 km are currently in service, with the remaining 9.9 km still under construction or in development. Not every segment of construction on this route is an independent "line." When the system is fully completed, it will form a single continuous route, with no transfers necessary to complete a trip along the route.
Line 4
A separate 18.2 km east-west Line 4 will connect mainly the Valencia Municipality with San Diego Municipality of the same city, and it is in the preliminary planning stage.
References
References
- (15 August 2012). "Historia de la C.A. Metro de Valencia". C.A. Metro de Valencia.
- "Mapa de Linea 1". C.A. Metro de Valencia.
- Webb, Mary (ed.) (2009). ''Jane's Urban Transport Systems 2009-2010'', pp. "[19]" (in foreword) and 486. Coulsdon, Surrey (UK): [[Jane's Information Group]]. {{ISBN. 978-0-7106-2903-6.
- ''[[Tramways & Urban Transit]]'', February 2008, p. 77. [[Light Rail Transit Association. LRTA Publishing]] (UK). {{ISSN. 1460-8324.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Valencia Metro (Venezuela) — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report