Skip to content
Surf Wiki
Save to docs
general/casco-class-monitors

From Surf Wiki (app.surf) — the open knowledge base

USS Nausett (1865)


FieldValue
section1{{Infobox ship/image
imageUSS Nausett 1865.jpg
image_captionAn engraving of the USS Nausett published in the English magazine "Engineering", 13 July 1866.
section2{{Infobox ship/career
countryUnited States
flag
nameUSS Nausett
orderedApril 1863
builderDonald McKay, Boston, Massachusetts
launched26 April 1865
commissioned10 August 1865
decommissioned24 August 1865
fateBroken up, August 1875
section3{{Infobox ship/characteristics
class
displacement1175 LT
length225 ft
beam45 ft
draft9 ft
propulsionScrew steamer
speed9 kn
complement69 officers and enlisted
armament2 × 11 in smoothbore Dahlgren guns
armor*Turret: 8 in
*Pilothouse: {{convert10inmmabbron}}
*Hull: {{convert3inmmabbron}}
*Deck: {{convert3inmmabbron}}
  • Pilothouse: 10 in
  • Hull: 3 in
  • Deck: 3 in

'*USS *Nausett''''', a single-turreted, twin-screw monitor, was built by Donald McKay, South Boston, MA, and launched on 26 April 1865, and commissioned on 10 August 1865, Acting Master Win. U. Grozier in command. Soon after her commissioning, she steamed to New York, NY, where she decommissioned on 24 August 1865, and was laid up at the New York Navy Yard.

Nausett was a Casco-class, light-draft monitor intended for service in the shallow bays, rivers, and inlets of the Confederacy. These warships sacrificed armor plate for a shallow draft and were fitted with a ballast compartment designed to lower them in the water during battle.

Design revisions

The contract to Donald McKay was originally announced in 1863. Though the original designs for the Casco-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban C. Stimers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time that the plans were put before the Monitor Board in New York City, Ericsson and Stimers had a poor relationship, and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Stimers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 in. Stimers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by 22 in to make them seaworthy.

Fate

As a result, Nausett remained in ordinary at New York for 10 years, during which time she was renamed twice: Aetna on 15 June 1869; and back to Nausett on 10 August 1869. In August 1875, she was broken up by John Roach of New York.

References

References

  1. (14 November 1863). "Donald McKay to Build an Iron-Clad". The New South.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about USS Nausett (1865) — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report