Skip to content
Surf Wiki
Save to docs
general/casco-class-monitors

From Surf Wiki (app.surf) — the open knowledge base

USS Etlah (1864)


FieldValue
section1{{Infobox ship/image
section2{{Infobox ship/career
countryUnited States
flag
nameUSS *Etlah*
orderedApril 1863
laid_down1864
commissionedNever commissioned
fateSold, 12 September 1874
section3{{Infobox ship/characteristics
class
displacement1175 LT
length225 ft
beam45 ft
draft9 ft
propulsionScrew
speed9 kn
complement69 officers and enlisted
armament2 × 11 in smoothbore Dahlgren guns
armor*Turret: 8 in
*Pilothouse: {{convert10inmmabbron}}
*Hull: {{convert3inmmabbron}}
*Deck: {{convert3inmmabbron}}
  • Pilothouse: 10 in
  • Hull: 3 in
  • Deck: 3 in '*USS Etlah''', a single-turreted, twin-screw monitor, was still under construction at St. Louis, Missouri, at the close of the American Civil War. A *Casco''-class, light-draft monitor, she was intended for service in the shallow bays, rivers, and inlets of the Confederacy. These warships sacrificed armor plate for a shallow draft and were fitted with a ballast compartment designed to lower them in the water during battle.

Though the original designs for the Casco-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban B. Simers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time the plans were put before the Monitor Board in New York, NY, Ericsson and Simers had a poor relationship and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Simers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 inches. Simers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by 22 inches to make them seaworthy.

The entire class was considered a disappointment, and Etlah was laid up at one or another location until sold 12 September 1874. Between 15 June and 10 August 1869, she bore the name Hecate while being laid up at Mound City, IL.

References

Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about USS Etlah (1864) — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report