The Upper Nepean Scheme is a series of dams and weirs in the catchments of the Cataract, Cordeaux, Avon and Nepean rivers of New South Wales, Australia. The scheme includes four dams and two weirs, and a gravity-fed canal system that feeds into a large storage reservoir to provide water to the Macarthur and Illawarra regions, the Wollondilly Shire, and metropolitan Sydney. The four dams and associated infrastructure are individually listed on the New South Wales State Heritage Register.
History
Associated dams
Cataract Dam
Main article: Cataract Dam
The Cataract Dam is a heritage-listed gravity dam with an unlined side spillway extending from the left abutment. It is 183 ft tall, 811 ft long and holds 97190 ML of water. Cataract Dam was the first dam built in the Upper Nepean Scheme, it was also first dam in Australia to use pre-cast moulded concrete blocks for the upstream face of the dam. The core of the dam consists of large 2 to sandstone blocks, quarried onsite and cemented together. The downstream face is of mass poured basalt concrete, with a basalt facing. A readily accessible source of suitable rock was located some distance away at Sherbrooke, also known as Ferndale, situated near the top of Bulli Pass. To transport the basalt from the quarry to the dam construction site, a gauge steam tramway, 8.8 km long, was constructed. Dam construction began in 1902 and was completed in 1907, and the spillway was widened in 1915. Ernest Macartney de Burgh was the supervising engineer for the project from 1904. Poet Banjo Paterson wrote a satirical ballad "The Dam that Keele Built" about the politics behind the construction of Cataract Dam.
Cordeaux Dam
Main article: Cordeaux Dam
The Cordeaux Dam is a heritage-listed arch dam across the Cordeaux River with an unlined side spillway on the left abutment. It is 191 ft high, 1327 ft long and creates a reservoir which holds 93640 ML. Construction began in 1918 and was completed in 1926 at a cost of A£945,000. The wall consists of large sandstone blocks, quarried onsite and cemented together, faced with a combination of bluestone and sandstone concrete. The dam featured a number of improvements in design and construction on the earlier-completed Cataract Dam. These included contraction joints between units of construction placed at intervals of 90 ft; inspection galleries at upper and lower levels, together with piping for registering any ground water pressure. The blue metal used in the construction of the dam was supplied from the Government Quarries at Kiama and brought by rail to Douglas Park. From here it was conveyed by aerial ropeway across the Nepean Gorge to an interchange on the eastern side where the material was transferred to a gauge steam tramway to a point adjacent to the dam site.
Avon Dam
Main article: Avon Dam
The Avon Dam is a heritage-listed arch dam across the Avon River; it is 237 ft tall, 732 ft long and its reservoir holds 146700 ML. It has the largest capacity of all the dams in the Scheme. Construction of the heritage-listed dam wall began in 1921 and was completed in 1927 at a cost of A£1,047,000. The dam construction and materials are the same as Cordeaux. All materials for construction were transported from Bargo railway station on a specially built road, all the other dams in the scheme used rail transport. There were some light tramways constructed at the dam site, however it would appear that no locomotives were employed; skips and other items being moved by winch, horse or manpower.
Nepean Dam
Main article: Nepean Dam
The Nepean Dam is a heritage-listed arch dam across the Nepean River; it is 269 ft tall and 709 ft long. Construction on the Dam began in 1926, construction was delayed for two years during the Depression, it was finally completed in 1935. The capacity is listed variously as 67730 to. The Nepean Reservoir has a small storage capacity in relation to its large catchment area of 319 km2. While its capacity is much the same as that of Cataract and Cordeaux Reservoirs, its catchment basin is two and a half times as extensive as Cataract and three and a half times as extensive as Cordeaux. The Nepean Reservoir therefore fills more rapidly and, under normal conditions, is drawn upon more freely than the other reservoirs. The dam is located at an elevation of 325 m above sea level and the construction cost was A£2,062,000.
Railway sidings were established on the Main Southern railway line at a point between Bargo and Yerrinbool. Transport to the dam site was again by light railway, on this occasion of standard gauge. This avoided transhipment from the Government vehicles bringing materials from large commercial quarries, effectively making the line an extended privately owned siding. The line was 4 km long through gentle countryside. Trains were worked by a variety of locomotives, including a former Sydney Steam Tram Motor. Additionally, there was a system of narrow () gauge lines in use at the dam construction site.
Additional work was carried out on the spillway between 1943 and 1947 to prevent scouring of the dam foundations.
Gallery
Image:Cataract_at_capacity.jpg|Cataract reservoir at full capacity, discharging through spillway Image:Cataract_spillway.jpg|Detail of Cataract Dam spillway Image:Cataract_outlet_works.jpg|Outlet works at Cataract Dam Avon Dam plate.jpg|Avon Dam plate Nepean Dam plate.jpg|Nepean Dam plate
References
Attribution
References
- (28 September 1867). "THE GOVERNMENT GAZETTE.". [[The Sydney Morning Herald]].
- (22 October 1869). "REPORT OF THE WATER SUPPLY COMMISSION.". [[Empire (newspaper).
- (10 February 1880). "THE WATER SUPPLY OF SYDNEY.". [[The Sydney Morning Herald]].
- (1 February 1886). "THE TEMPORARY WATER SUPPLY.". [[The Sydney Morning Herald]].
- {{cite NSW SHR. 5051469. Cataract Dam
- Longworth, Jim. (July 1993). "Construction Railways of the Upper Nepean Dams - Cataract Dam". [[Australian Railway History.
- Antill, J. M.. (1981). "De Burgh, Ernest Macartney (1863 - 1929)". [[Melbourne University Press.
- "Cataract Dam - Sydney Catchment Authority".
- "Cordeaux Dam - Sydney Catchment Authority".
- {{cite NSW SHR. 5051470. Cordeaux Dam
- Longworth, Jim. (October 1993). "Construction Railways of the Upper Nepean Dams - Cordeaux Dam". [[Australian Railway History.
- "Avon Dam - Sydney Catchment Authority".
- {{cite NSW SHR. 5051468. Avon Dam
- Longworth, Jim. (January 1994). "Construction Railways of the Upper Nepean Dams - Avon Dam". [[Australian Railway History.
- "Nepean Dam - Sydney Catchment Authority".
- {{cite NSW SHR. 5051477. Nepean Dam
- Longworth, Jim. (May 1994). "Construction Railways of the Upper Nepean Dams - Nepean Dam". [[Australian Railway History.
- (1961). "The Water Supply, Sewerage and Drainage of Sydney". [[Sydney Water.
- Henry, F. J. J.. (1939). "The water supply and sewerage of Sydney". [[Sydney Water.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Upper Nepean Scheme — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report