Skip to content
Surf Wiki
Save to docs
general/east-river

From Surf Wiki (app.surf) — the open knowledge base

Stuyvesant Cove Park

Public park in Manhattan, New York

Stuyvesant Cove Park

Public park in Manhattan, New York

FieldValue
photoStuyvesant Cove Park 2023.jpg
photo_captionStuyvesant Cove Park in 2023
locationManhattan, New York
coordinates
opened
etymologynamed after Peter Stuyvesant
area1.9 acre
ownerNew York City Department of Small Business Services
managerSolar One (on behalf of New York City Economic Development Corporation

Stuyvesant Cove Park is a 1.9 acre public park on the East Side of the New York City borough of Manhattan that runs from 18th Street to 23rd Street between the FDR Drive and the East River. Part of the East River Greenway, it is located to the south of the Waterside Plaza apartment complex, to the east of Stuyvesant Town–Peter Cooper Village, and to the north of the East River Park, and connects to the Captain Patrick J. Brown Walk on the south end. Stuyvesant Cove is served by the NYC Ferry Soundview route.

History

Planning and construction

Located on the what was once the brownfield site of a former ready-mix concrete plant and a parking lot, the park was created after the failure of the proposed Riverwalk mixed-use development that would have included residential units, offices, a hotel and a marina. Surplus concrete dumped from trucks into the East River has created a small beach in the middle of the park near the end of 20th Street, which is not intended to be accessed by pedestrians.

After the Riverwalk proposal was withdrawn, Manhattan Community Board 6 commissioned the landscape architecture firm of Heintz/Ruddick Associates to prepare an open space study for the site. The "Stuyvesant Cove Open Space Study" was completed in June 1993 in collaboration with Karahan/Schwarting Architecture Company and included plans for a waterfront park with a pedestrian esplanade, bike path, beach, boathouse for kayaks, dock with barges for sunbathing, 5000 sqft environmental & education center, and restaurant and deck to be built above the parking garage at the adjacent Skyport Marina. The results of the open space study were incorporated into a 197-a plan submitted by Manhattan Community Board 6 in 1995, pursuant to Section 197-a of the New York City Charter. The 197-a plan was modified by the City Planning Commission and adopted by the City Council in 1997.

Advocates for a new waterfront park from Citizens United Against Riverwalk (CUAR), a neighborhood group that had opposed the Riverwalk mixed-use development proposal, formed a new group called the Stuyvesant Cove Park Association, which obtained federal, state, and city funding to finance the construction of the new park. The park, which was completed in 2002, cost $8.3 million and was designed by Donna Walcavage Landscape Architecture. Roadways in the surrounding area were reconfigured to maximize the size of the park, which included shifting the northbound service road of the FDR Drive from the east side to the west side of the elevated viaduct, converting Avenue C into a two-way boulevard between 18th Street and 23rd Street. The changes to the surrounding roadway network also extended northwards towards 25th Street where a new point of egress was added from Waterside Plaza to allow vehicles exiting the apartment complex to travel south and then under the FDR Drive viaduct to get to 23rd Street. Before the park was constructed all traffic exiting Waterside Plaza had to travel northbound to 34th Street.

Opening and early years

A dance company rehearses on the outdoor stage at Solar 1 in 2010

Solar 1, an environmental learning center with a small outdoor stage for public performances, opened at the north end of the park in 2003. The facility was a 500 sqft solar powered pavilion that was intended to be replaced by a larger building in the future. Community Environmental Center (CEC) agreed to maintain the new park for the New York City Economic Development Corporation (NYCEDC) in exchange for the use of city land for the environmental education center. CEC established "CEC Stuyvesant Cove, Inc." as a separate non-profit entity in 2004, which began using the name "Solar One" the following year.

Since its opening, Stuyvesant Cove Park has been planted with a variety of native plant species. The park was initially maintained by NYCEDC and most of the plantings died due to a lack of water. In 2002, when CEC was awarded the contract to take over the park, including its maintenance, Jon Cramer of CEC was titled the program director and he hired Jeff Tucker to be the first ever Chief Landscaper. Jon was responsible for constructing Solar 1, the first ever self-sustaining building in Manhattan running off of solar power. In 2018, park manager Emily Curtis-Murphy embarked on a program to showcase plant species originally native to Manhattan and Long Island in a manner that positions the park as an outdoor classroom for students attending local schools.

The park's walkway in 2011, prior to reconstruction for the floodwall

The western edge of the park contains a two-way bike path that runs alongside the FDR Drive viaduct. The eastern side of the park was designed to include a curved walkway of varying width that alternates between sections located adjacent to the bulkhead and others set back behind planting beds. Seating areas located within the park included covered gazebos, tables, chairs and benches designed by Carr, Lynch & Sandell.

In 2018, ferry service was added to the park with a stop on NYC Ferry's Lower East Side route. A new ferry landing was constructed near East 20th Street to accommodate NYC Ferry service, which consists of two 80 ft gangways leading out from the bulkhead to a 35 by barge. The ferry landing has been served by NYC Ferry's Soundview route since 2020, when the Lower East Side route was discontinued.

East Side Coastal Resiliency project

Floodwall and flood gate at East 20th Street entrance to park in 2023

The park was closed at the end of 2020 and rebuilt to allow for the construction of a new floodwall with flood gates as part of the city's East Side Coastal Resiliency project. The park was completely demolished in order to build the flood protection system. Prior to construction, thousands of native plants from the old park were donated by Solar One to over 30 community organizations in New York City. This project also removed the gazebos and some seating from the park, replacing it with stadium style seats and more tables. The northern section of the park was reopened to the public on May 31, 2023. The southern section of the park (south of 20th Street) was reopened in December 2023. The current park was designed by Mathews Nielsen Landscape Architects.

The parking lot under the FDR Drive viaduct adjacent to the park, which had been closed during construction of the floodwall, reopened at the beginning of 2024. Manhattan Community Board 6 and local residents have called for the parking facility to be converted into public space, similar to sections of the FDR Drive viaduct further downtown along South Street that include seating areas and recreational facilities such as courts and exercise equipment. The floodwall at Stuyvesant Cove Park was finished in late 2024.

The Solar One building in 2025

A groundbreaking ceremony for the construction of a new two-story environmental education center at the north end of the park was held on September 13, 2023. The 6,500 sqft building was designed by Bjarke Ingels Group and will include flexible indoor space that can be used for classrooms or community functions as well as office facilities, storage areas, and a 25kW rooftop solar array with a battery energy storage system. The new building opened in September 2025.

Native Plants of Stuyvesant Cove Park

As of 2016, these are the native plant species that vegetate at the park:

ZIAUZizia aureagolden zizia

References

Notes

Sources

References

  1. (September 13, 2019). "East Side Coastal Resiliency Project FEIS".
  2. "Stuyvesant Cove Park". Solar One.
  3. "Soundview Ferry Route & Schedule".
  4. Stamler, Bernard. (October 26, 1997). "Park to Grow on the Ashes of the Riverwalk Plan". The New York Times.
  5. "Before & After". Solar 1.
  6. Kinetz, Erika. (January 13, 2002). "Rock Outcropping or Rubble? No One's Neutral on Old Cement". The New York Times.
  7. Kilgannon, Corey. (May 31, 2004). "They'll Take Manhattan (Accidental Beaches, Too)". The New York Times.
  8. (November 1993). "Close to Home". American Institute of Architects New York Chapter.
  9. Merkel, Jayne. (May 1995). "Approaching Nature: Heintz/Ruddick Associates". American Institute of Architects New York Chapter.
  10. (Summer 1997). "Comprehensive Manhattan Waterfront Plan". Manhattan Borough President.
  11. "Stuyvesant Cove Waterfront Master Plan".
  12. (Spring 1997). "Stuyvesant Cove 197-a Plan - As modified by the City Planning Commission and adopted by the City Council".
  13. (2013). "Guide to New York City Urban Landscapes". W. W. Norton & Company.
  14. Rosen, Dan. (December 9, 2009). "Stuy Town Resident Is Putting on The Pier Pressure". The Villager.
  15. Urbitran Associates, Inc.. (May 2000). "Stuyvesant Cove Park Environmental Assessment Statement Supplemental Report".
  16. Tuhus-Dubrow, Rebecca. (July 1, 2003). "Park 'n' Learn".
  17. (Spring 2007). "On the Verge". Regional Plan Association.
  18. "2014 Annual Report". Solar One.
  19. "Stuyvesant Cove".
  20. Berger, Paul. (August 29, 2018). "NYC Ferry Begins Lower East Side Service". The Wall Street Journal.
  21. (July 28, 2016). "Citywide Ferry Service Final Environmental Impact Statement". New York City Economic Development Corporation.
  22. "NYC Ferry Service & Schedule Modification Effective Monday, May 18th, 2020".
  23. Kensinger, Nathan. (October 29, 2022). "Coastal barriers finally begin to rise around NYC — but can they stop the next Hurricane Sandy?". Gothamist.
  24. "2021 Annual Report". Solar One.
  25. (May 31, 2023). "Stuyvesant Cove Park Reopens with New Recreation Areas and Flood Protection for Surrounding Community".
  26. "Construction Project Areas for East Side Coastal Resiliency".
  27. "East Side Coastal Resiliency".
  28. WXY Architecture + Urban Design. (March 2024). "FDR Reimagined: The Future of the FDR Drive in Manhattan CB6".
  29. Duggan, Kevin. (August 19, 2024). "Parking Lot Under the FDR Should Become Public Space: Locals".
  30. Ramjeawan, Chelsea. (November 4, 2024). "City Celebrates Completion of First Part of East Side Coastal Resiliency Project".
  31. Roche, Daniel Jonas. (November 13, 2024). "New York City's East Side Coastal Resiliency project hits halfway mark".
  32. (September 13, 2023). "NYCEDC and Solar One Break Ground on Solar One Environmental Education Center".
  33. Miller, Linda G.. (September 27, 2023). "In Case You Missed It…".
  34. "Solar One Environmental Education Center".
  35. Gillespie, Max. (September 9, 2025). "Solar One Opens Environmental Education Center On East River Waterfront In Stuyvesant Town, Manhattan". New York YIMBY.
  36. (September 9, 2025). "NYCEDC and Solar One Cut Ribbon on State-of-the-Art Environmental Education Center". New York City Economic Development Corporation.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Stuyvesant Cove Park — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report