From Surf Wiki (app.surf) — the open knowledge base
Strait of Messina Bridge
Proposed suspension bridge linking Sicily to mainland Italy
Proposed suspension bridge linking Sicily to mainland Italy
| Field | Value |
|---|---|
| bridge_name | Strait of Messina Bridge |
| native_name | Ponte sullo stretto di Messina |
| native_name_lang | it |
| image | Messina Bridge from Piale.jpg |
| image_size | 260 |
| caption | An artist's impression of the planned bridge from the Calabrian coast |
| carries | Six lanes and two emergency lanes; two rail tracks and two railway sidewalks. |
| crosses | Strait of Messina |
| locale | Messina and Villa San Giovanni |
| design | Suspension bridge |
| designer | Stretto di Messina |
| mainspan | 3300 m |
| length | 3666 m |
| height | 399 m (pylons) |
| below | 76 m |
| begin | 2025 (projected) |
| complete | 2032 (projected) |
| coordinates |
The Strait of Messina Bridge () is a proposed 3.6 km suspension bridge across the Strait of Messina, connecting Torre Faro on the Italian island of Sicily with Villa San Giovanni in Calabria on the Italian mainland. If built, it would be the longest suspension bridge in the world and part of the Berlin–Palermo railway axis of the Trans-European Transport Networks.
While a bridge across the Strait of Messina had been proposed since ancient times, the first detailed plan was made in the 1990s, for a suspension bridge. The project was cancelled in 2006 under Prime Minister Romano Prodi, revived in 2009 under Silvio Berlusconi, and cancelled again in 2013 under Mario Monti. It was resurrected again in 2023 under Giorgia Meloni and received final government approval in August 2025. However, in October, Italy's Court of Audit rejected the proposal.
The proposal has drawn concerns connected with earthquakes, strong currents in the strait, disruption of bird migration routes, and a possibility of infiltration into the bridge's construction by the mafia groups Cosa Nostra and 'Ndrangheta.
Geography
The Strait of Messina is a funnel-shaped arm of sea that connects the Ionian Sea in the south to the Tyrrhenian Sea to the north. The width of the strait varies from a maximum of approximately 16 km, between Capo d'Alì in Sicily and Punta Pellaro in Calabria, to a minimum of approximately 3 km between Capo Peloro in Sicily and Torre Cavallo in Calabria. A similar distance separates Pezzo and Ganzirri. At that point, the strait is only 72 m deep, while in other places, it can reach 200 m deep. In addition to strong tidal currents, the region's significant seismic activity will pose a challenge to the bridge's construction.
History
The idea of a bridge crossing the strait is an old one. The Romans considered building a bridge joining Calabria and Sicily, which was to be constructed from boats and barrels. Pliny the Elder, a philosopher and Roman military leader born in AD 23, wrote of a plan to bridge the strait with a series of connecting boats. The idea was abandoned, as it was clear that more traffic plied the strait in a north-south rather than east-west direction, so any structure on water could not be permanent.
Charlemagne considered joining the two sides with a series of bridges. This idea was revived by the Norman adventurer Robert Guiscard in the 11th century and by Roger II of Sicily in the 12th. In 1876, the politician Giuseppe Zanardelli was convinced that the strait could be linked by either a bridge or a tunnel. In 1866, the public works minister, Stefano Jacini, turned to Alfredo Cottrau, an internationally renowned engineer, to design a planned bridge between Calabria and Sicily.
In 1870, Navone proposed building a tunnel, based on Napoleon's failed 1802 proposal of a Channel Tunnel running below the English Channel. It was to start at Contesse and pass below Messina and Ganzirri at a depth of 150 m, crossing the strait to Punta Pezzo and resurfacing at Torre Cavallo.
In 1909, a geological study of the strait was published (historical Arch. Sicilian year XXXIV f.1,2). In 1921, a study of an undersea tunnel was released to the Geographic Conference of Florence. A group of railway civil engineers studied the possibility of a suspension bridge, but nothing came of it.
In 1953, the idea was revived by the American civil engineer David B. Steinman, with a plan to build a bridge that crossed the strait using two 220 m towers sunk 120 m into the seafloor. The proposed 1524 m span would have represented a world record, eclipsing the then-longest 1275 m centre span of the Golden Gate Bridge and longer than the 2256 m Mackinac Bridge, then in planning, with a total length of 2988 m. The proposed structure was to clear the sea by 50 m for navigation and have two decks—a lower deck carrying two rail lines, and 7 m above, a road deck 30 m wide. The main cables were designed with a diameter of 1 m. Construction of the bridge would have required 12,000 workers and cost hundreds of billions of lire.
Modern attempts to build the bridge
Early planning stages
- In the 1960s, a wide variety of proposals were advanced, including everything from submerged tubes to floating struts, pontoons, and a revolving central section of the bridge. None turned out to be realistic.
- In 1969 an international design competition was arranged.
- In the 1970s, feasibility studies were undertaken by the state railways, leading to the creation of a private company with responsibility for planning the strait's crossing.
- In the 1980s, the Messina Strait Company was set up with support from the state railways, the regions, and the Istituto per la Ricostruzione Industriale. It concluded that it would be feasible to build a suspension bridge.
- Detailed plans followed in the 1990s, with final approval from the High Council of Public Works (Consiglio Superiore dei Lavori Pubblici).
First Berlusconi government

The 2006 plan called for a single-span suspension bridge with a central span of 3300 m. This would have made the span more than 60% longer than the 1915 Çanakkale Bridge in Turkey—currently the longest suspension bridge in the world, at 2023 m.
Plans called for four traffic lanes (two driving lanes and one emergency lane in each direction), two railway tracks, and two pedestrian lanes. In order to provide a minimum vertical clearance for navigation of 65 m, the two towers were to be 382.6 m high. This would have been taller than the Millau Viaduct in France (then the world's tallest bridge, at 341 m). The bridge's suspension system would have relied on two pairs of steel cables, each with a diameter of 1.24 m and a total length, between the anchor blocks, of 5300 m.
The design included 20.3 km of road links and 19.8 km of railway links to the bridge. On the mainland, the bridge was to connect to the new stretch of the Salerno-Reggio Calabria motorway (A3) and to the planned Naples-Reggio Calabria high-speed rail line; on the Sicilian side, to the Messina-Catania (A18) and Messina-Palermo (A20) motorways as well as the new Messina railway station (to be built by Rete Ferroviaria Italiana).
The bridge was planned to connect Reggio Calabria to Messina, the two cities that face each other on either side of the strait, in order to form a single metropolitan area. This ambitious urban project was called Area Metropolitana integrata dello Stretto ("integrated metropolitan area of the strait") or simply Città dello Stretto ("city of the strait"). Among the controversies surrounding the bridge's construction was strong, relentless opposition from various Sicilian nationalist groups, which explicitly objected to the formation of such a metropolitan area.
Among the engineers who participated in the project was Giorgio Diana, who mainly dealt with the aeroelastic aspect.
Contracting parties
A construction consortium, led by Impregilo, was selected in 2005, with work set to begin in the second half of 2006. The bridge was designed by Danish architects at Dissing+Weitling in close collaboration with the Danish engineering firm COWI. In March 2006, Impregilo and Stretto di Messina signed a contract assigning final project planning to a general contractor. Impregilo S.p.A., the lead partner, had a 45% share. Other participants were Spain's Sacyr (18.70%), the Italian companies Società Italiana per Condotte D'Acqua S.p.A. (15%) and Cooperativa Muratori & Cementisti-C.M.C. of Ravenna (13%), Japan's IHI Corporation (6.30%), and Consorzio Stabile A.C.I. S.c.p.a (2%).
The general contractor would also be assisted by the Danish and Canadian companies COWI A/S, Sund & Baelt A/S, and Buckland & Taylor Ltd., who would handle project engineering. Completion was planned to take six years, at an estimated cost of €3.9 billion.
| Function | Companies | Role |
|---|---|---|
| General contractor | ||
| ITA Eurolink | ITA Webuild (Impregilo until 2012) | Group leader (45%) |
| JPN IHI Infrastructure Systems Co., Ltd. | Mandator | |
| DEN COWI A/S | Mandator | |
| ESP Sacyr | Mandator | |
| ITA Società Italiana per Condotte d'Acqua | Mandator | |
| ITA Cooperativa Muratori & Cementisti | Mandator | |
| ITA Argo Costruzioni Infrastrutture | Mandator | |
| DEN Dissing+Weitling | Mandator | |
| DEN Sund & Bælt A/S | Mandator | |
| CAN Buckland & Taylor | Mandator | |
| Project management | USA Parsons Corporation | |
| Environmental monitoring | ITA Fenice | Group leader |
| ITA Agriconsulting | Mandator | |
| ITA Eurisko NOP World | Mandator | |
| ITA Nautilus Società Cooperativa | Mandator | |
| ITA Theolab | Mandator | |
| Insurance broker | USA Marsh |
On 12 October 2006, the Italian Parliament voted 272 to 232 in favour of abandoning the plan due to the bridge's "doubtful usefulness and viability" and the inability of the already burdened Italian treasury to bear its share of the cost. Transport minister Alessandro Bianchi stressed that the road and rail links leading to the location of the proposed bridge are not capable of supporting enough traffic to make its construction economically feasible. Other reasons for abandoning the plan were earthquake risk and fears that the bridge would enrich the networks of organized crime in Italy, such as Cosa Nostra and 'Ndrangheta.
Second Berlusconi government
In April 2008, Silvio Berlusconi was re-elected Prime Minister of Italy and vowed to restart the project to build the bridge. The following month, Altero Matteoli, Italy's minister of infrastructure and transport, confirmed the government's intent to restart work on the bridge in a letter to Pietro Ciucci, the president of Società Stretto di Messina.
In March 2009, as part of a massive new public works programme, Berlusconi's government announced that plans to construct the Messina bridge had been revived, pledging €1.3 billion as a contribution to its estimated cost of €6.1 billion. Berlusconi claimed that work would be completed by 2016. Until 2006, when the project was halted, the work had been assigned to a consortium of Impregilo (now called Webuild), Condotte d'Acqua, Cooperativa Muratori & Cementisti, and Consorzio Stabile A.C.I., alongside Spain's Sacyr and Japan's IHI Corporation.
In December 2009, preparatory work began, with the diversion of the Tyrrhenian railway at Cannitello on the Italian mainland side of the strait.
In February 2013, the project was shut down by Prime Minister Mario Monti, for lack of funds.
Renzi government
In September 2016, the project was reconsidered by the government of Matteo Renzi.
Conte government
In June 2020, during the COVID-19 pandemic, Prime Minister Giuseppe Conte brought up the topic of the bridge, declaring that the government would evaluate the resumption of work without prejudice.
In April 2021, the CEO of Webuild, Pietro Salini, in a joint press conference with the President of the Sicilian Region, Nello Musumeci, announced that he was ready to build the Strait of Messina Bridge, starting immediately with the work and on the basis of the executive project and construction site approved definitively in 2013. He declared that he already had the four-billion-euro coverage necessary for the construction and that he could obtain the other two necessary for the infrastructures connected to it from private financing.
Meloni government
On 16 March 2023, the Italian government, under Prime Minister Giorgia Meloni, with Matteo Salvini as Minister of Infrastructure and Transport, approved a decree to proceed with the construction of the bridge by remodeling the existing project.
On 19 March, WeBuild's Pietro Salini said work on the bridge should begin by 2024, with the project scheduled for completion in 2032.
On 31 March, the Italian president, Sergio Mattarella, approved the Decreto Ponte ("bridge decree").
In April 2025, Salvini announced that construction of the bridge would start in mid-2025 and would comply with all environmental standards.
In August 2025, the Meloni government gave final approval to the project, allowing construction on the bridge to commence. It indicated that it would consider the bridge as a defence-related expense to count towards a NATO spending target. In September, the United States government said it disapproved of the strategy, calling it "creative accounting". On 30 October, Italy's Court of Audit rejected the proposal to build the bridge.
Challenges and criticisms
The bridge has been regarded as highly controversial due to the impact of earthquakes, strong currents in the strait, concerns about disruption of bird migration routes, and possible infiltration of the mafia groups Cosa Nostra and 'Ndrangheta into construction projects.
Seismic activity and strong winds have been cited as the largest structural issues the bridge faces. The span must withstand earthquakes with a maximum intensity of 7.8 Mw, greater than the 1908 Messina earthquake.
In August 2025, thousands of people in Messina protested against the plan to build the bridge.
References
References
- (19 May 2025). "Work on long-debated bridge to Sicily could begin in coming months". [[Reuters]].
- (14 March 2025). "Messina Bridge construction to start end-April, end 2032".
- Sylvers, Eric. (26 July 2023). "Italy Says it Will Build the Longest Suspension Bridge in the World. Don't Hold Your Breath.". [[The Wall Street Journal]].
- (12 October 2006). "Italy drops Sicily bridge plans". [[BBC News]].
- (6 March 2009). "Italy revives Sicily bridge plan". [[BBC News]].
- Masoni, Danilo. (26 February 2013). "Sicily bridge project sinks in Italy budget mire". [[Reuters]].
- (16 February 2024). "Déjà Vu? Italy Plans to Build World's Longest Suspension Bridge to Sicily".
- (6 August 2025). "Italy gives final go-ahead for landmark Sicily bridge project".
- Nadeau, Barbie Latza. (30 April 2023). "Italy wants to build the world's longest suspension bridge. The Mafia and geography might make that difficult". [[CNN]].
- (17 February 2009). "Sicily (island, Italy) – Britannica Online Encyclopedia". [[Encyclopædia Britannica]].
- (29 April 2007). "Messina Strait, Italy".
- (1 April 1906). "Currents in the Straits of Messina". Nature.
- admin. (22 January 2025). "Strait of Messina Bridge: seismic issues, fault lines, bridge height, ships in transit, suspension cables and other useful information on the project's design – Stretto di Messina S.p.A.".
- "New Study on Seismicity in the Strait of Messina {{!}} Consiglio Nazionale delle Ricerche".
- (3 June 2021). "When Planning a Bridge is No Small Decision".
- [http://www.timesonline.co.uk/tol/news/world/europe/article5864671.ece Sicily to get longest bridge from TimesOnline] www.timesonline.co.uk {{Webarchive. link. (17 August 2011 . Accessed 8 March 2009.)
- [http://www.khl.com/magazines/construction-europe/detail/item32130/Italy-revives-Messina-Straits-bridge/ Italy revives Messina Straits bridge from Construction Europe.] www.khl.com {{Webarchive. link. (13 July 2011 Accessed 9 March 2009.)
- (17 December 2013). "Ponte sullo Stretto: un maxi-documento contro le "bugie pubblicate dalla stampa locale"". strettoweb.com.
- "Giorgio Diana – Professore emerito del Politecnico di Milano".
- (12 October 2005). "Sicily bridge constructor named". [[BBC News]].
- [http://www.sb-partner.com/press_download/march27.pdf Straits Bridge: Impregilo and Stretto di Messina close contract] {{webarchive. link. (18 November 2008 . Accessed 10 March 2009.)
- [http://www.sb-partner.com/press_download/march27.pdf Straits Bridge: Impregilo and Stretto di Messina close contract] {{webarchive. link. (18 November 2008 . Accessed 10 March 2009.)
- (4 May 2020). "Salini Impregilo cambia nome: da oggi nasce Webuild – la Repubblica". Repubblica.it.
- Hooper, John. (12 October 2006). "Italian MPs kill plan to bridge Sicily and mainland". [[The Guardian]].
- (27 May 2008). "Italian minister commits to Messina Bridge". Bridge Design and Engineering.
- (23 December 2009). "Ponte stretto: al via i lavori (Straits bridge: Work begins)". ItaliaOnLine.
- Samuels, Gabriel. (27 September 2016). "Italian PM Matteo Renzi revives plan for bridge from mainland Italy to Sicily".
- (3 June 2010). "Use crisis to redesign country – Conte". [[Agenzia Nazionale Stampa Associata]].
- (4 June 2010). "Conte: "On EU funds, comparison with everyone, it is not a treasure of the government"". archyde.com.
- (22 April 2021). ""Il Ponte sullo Stretto? Ce lo facciamo da soli": il patto di Musumeci con Salini". lasicilia.it.
- (22 April 2021). "Ponte Stretto: Salini, è cantierabile, siamo pronti a farlo". [[Agenzia Nazionale Stampa Associata]].
- (17 March 2023). "Cabinet approves Messina Bridge decree – 'Historic day for Italy' says Infrastructure Minister Salvini". [[Agenzia Nazionale Stampa Associata]].
- "Pietro Salini at "Quarta Repubblica": We are ready to build the Strait of Messina Bridge {{!}} WeBuild Group".
- (31 March 2023). "Il Ponte sullo Stretto è legge: Mattarella firma, il decreto è in Gazzetta Ufficiale".
- Ingiusto, Nunzio. (7 April 2025). "Strait Bridge: Construction Sites to Begin in Mid-2025, but Environmentalists Announce New Legal Actions".
- (6 August 2025). "Italy greenlights a $15.5 billion project to build bridge linking Sicily to the mainland". [[AP News]].
- (3 September 2025). "US warns against counting Messina Bridge as NATO spending".
- (30 October 2025). "Italian court rejects Sicily bridge project, dealing a blow to Meloni government". AP News.
- (8 August 2025). "Sicily locals vow opposition to longest suspension bridge". [[RTÉ]].
- "Messina Straits Bridge".
- (27 February 2024). "A bridge too far? Messina Strait project could finally join Sicily to the mainland". [[Nature Italy]].
- "The Strait of Messina Bridge Media Kit". webuildgroup.com.
- (11 November 2024). "Seismic issues and faults: the bridge has been designed with measures and criteria that make it one of the most seismically safe structures in Italy and the rest of the world".
- (9 August 2025). "Thousands march against plan to build massive bridge linking Sicily to Italy's mainland".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Strait of Messina Bridge — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report