From Surf Wiki (app.surf) — the open knowledge base
Moralane
| Field | Value |
|---|---|
| name | Moralane |
| native_name_lang | |
| settlement_type | Water tank and pumping station |
| pushpin_map | Botswana |
| coordinates | |
| subdivision_type | Country |
| subdivision_name | Botswana |
| subdivision_type1 | District |
| subdivision_name1 | Central District |
| unit_pref | Metric |
| area_urban_footnotes | |
| area_rural_footnotes | |
| area_metro_footnotes | |
| area_magnitude | |
| population_density_km2 | auto |
| website |
tags -- Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone.
Phase 1 of the NSC opened in 2000, delivering water from the Letsibogo Dam on the Motloutse River. A reinforced concrete break pressure tank (BPT1) and a pumping station (PS2.1) were installed at Moralane in this phase. The break pressure tank has the capacity of 4500 m3 and the pumping station has the capacity of 1.51 m3 per second.
Phase 2 of the NSC is due to start delivering water from the Dikgatlhong Dam on the Shashe River in 2014. The new pipeline from the Dikgatlhong Dam runs parallel to the existing pipeline along the section from the Letsibogo Dam to Moralane, causing concerns that blasting for the new pipeline may cause problems with the existing pipeline. The pumping equipment at Moralane will be upgraded by introduction of a variable speed drive. Initially, the water from both dams will be delivered through the same pipeline from Moralane south to Palapye.
An extension of the NSC is being considered to carry the Zambezi's water from Pandamatenga via Francistown to BPT1 at Moralane. A pre-feasibility study was delivered to the Department of Water Affairs in April 2010. This expansion would deliver another 100000000 m3 of water annually through the Moralane plant.
References
Citations Sources
- {{cite web |url=http://www.mmegi.bw/index.php?sid=4&aid=1234&dir=2012/June/Friday22 |access-date=2012-09-21}}
- {{cite web |ref= |url=http://www.jica.go.jp/english/operations/evaluation/oda_loan/post/2004/pdf/2-50_full.pdf |access-date=2012-09-24}}
- {{cite web |url=http://www.water.gov.bw/images/Draft%20Prefeasibility_Feasibility%20Report.pdf |access-date=2012-09-24}}
References
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Moralane — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report