Mettur Thermal Power Station
Power station in Tamil Nadu, India
Power station in Tamil Nadu, India
| Field | Value |
|---|---|
| name | Mettur Thermal Power system |
| location_map_caption | Location of the Mettur Thermal Power Station in Tamil Nadu |
| coordinates | |
| country | India |
| location | Salem, Tamil Nadu |
| status | O |
| commissioned | Unit 1: 7 January 1987 |
| Unit 2: 1 December 1987 | |
| Unit 3: 22 March 1989 | |
| Unit 4: 27 March 1990 | |
| Unit 5: 12 October 2013 | |
| operator | Tamil Nadu Generation and Distribution Corporation Limited |
| th_fuel_primary | Bituminous coal |
| ps_units_operational | 4 x 210 MW, 1 x 600 MW |
| ps_electrical_capacity | 1,440 MW |
Unit 2: 1 December 1987 Unit 3: 22 March 1989 Unit 4: 27 March 1990 Unit 5: 12 October 2013 The Mettur Thermal Power Station is a coal-fired electric power station located in [Thoppur-Mettur Dam-Bhavani-Erode Rd, Mettur, Tamil Nadu 636406] Salem district of Tamil Nadu. It is operated by Tamil Nadu Generation and Distribution Corporation Limited. The power station was commissioned during various periods from 1987 and this is the first inland thermal Power Station of TANGEDCO.The coal from Mahanadi Coalfields Limited (Talcher and Ib Valley) and Eastern Coalfields Limited (Raniganj and Mugma) are transported to the load ports of Paradip (Orissa), Vizag (Andhra Pradesh) and Haldia (West Bengal). Thereafter the coal is transported to the discharge ports of Ennore and Tuticorin by ships. From Ennore Port the coal is transported again through rail to Ennore Thermal Power Station and Mettur Thermal Power Station.
BGR Energy Systems Ltd was the EPC contractor for 600 MW unit 5 of the power plant.
Plants
| Unit | cost in Crores Rs | Continuous running in days | Capacity(M.W) | Date of |
|---|---|---|---|---|
| I | 384.30 | 227 days | 210 | 7 January 1987 |
| II | 384.30 | 205 days | 210 | 12 January 1987 |
| III | 351.76 | 272 days | 210 | 22 March 1989 |
| IV | 351.76 | 311 days | 210 | 27 March 1990 |
| V | 398.00 | 193 days | 600 | 12 October 2013 |
References
References
- Thermal, Power Station. "tangedco".
- "home page".
- [https://www.tangedco.gov.in/linkpdf/MTPP_English%2017.10.17.pdf tangedco.gov Mettur Thermal Power Station- Stage-III]
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Mettur Thermal Power Station — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report