Low-voltage ride-through
Electric generator function
Electric generator function
In electrical power engineering, fault ride-through (FRT), sometimes under-voltage ride-through (UVRT), or low-voltage ride-through (LVRT), is the capability of electric generators to stay connected in short periods of lower electric network voltage (cf. voltage sag). It is needed at distribution level (wind parks, PV systems, distributed cogeneration, etc.) to prevent a short circuit at HV or EHV level from causing a widespread loss of generation.
General concept
Many generator designs use electric current flowing through windings to produce the magnetic field on which the motor or generator operates. This is in contrast to designs that use permanent magnets to generate this field instead. Such devices may have a minimum working voltage, below which the device does not work correctly, or does so at greatly reduced efficiency. Some will disconnect themselves from the circuit when these conditions apply. The effect is more pronounced in doubly-fed induction generators (DFIG), which have two sets of powered magnetic windings, than in squirrel-cage induction generators which have only one. Synchronous generators may slip and become unstable, if the voltage of the stator winding goes below a certain threshold.
Risk of chain reaction
In a grid containing many distributed generators subject to disconnection at under voltage, it is possible to cause a chain reaction that takes other generators offline as well. This can occur in the event of a voltage dip that causes one of the generators to disconnect from the grid. As voltage dips are often caused by too little generation for the load in a distribution grid, removing generation can cause the voltage to drop further. This may bring the voltage down enough to cause another generator to trip, lower the voltage even further, and may cause a cascading failure.
Ride-through systems
Modern large-scale wind turbines, typically 1 MW and larger, are normally required to include systems that allow them to operate through such an event, and thereby “ride through” the voltage dip. Similar requirements are now becoming common on large solar power installations that likewise might cause instability in the event of a widespread disconnection of generating units. Depending on the application the device may, during and after the dip, be required to:
- disconnect and stay disconnected until manually ordered to reconnect
- disconnect temporarily from the grid, but reconnect and continue operation after the dip
- stay operational and not disconnect from the grid
- stay connected and support the grid with reactive power (defined as the reactive current of the positive sequence of the fundamental){{cite book
Standards
A variety of standards exist and generally vary across jurisdictions. Examples of the such grid codes are the German BDEW grid code and its supplements 2, 3, and 4 as well as the National Grid Code in UK.
Testing
For wind turbines, the FRT testing is described in the standard IEC 61400-21 (2nd edition August 2008). More detailed testing procedures are stated in the German guideline FGW TR3 (Rev. 22). Testing of devices with less than 16 Amp rated current is described in the EMC standard IEC 61000-4-11 and for higher current devices in IEC 61000-4-34.
References
References
- [http://std.iec.ch/terms/terms.nsf/0/DB2CF1567097E866C1257E29002C35B3?OpenDocument IEC Glossary: UVRT]
- (2019-06-18). "Evaluation of the Performance of BTFCLs for Enhancing LVRT Capability of DFIG". IEEE Transactions on Power Electronics.
- (2019-06-18). "2017 International Renewable and Sustainable Energy Conference (IRSEC)".
- (2018-12-18). "2018 International Conference and Exposition on Electrical and Power Engineering (EPE)".
- (2019-06-18). "2019 10th International Power Electronics, Drive Systems and Technologies Conference (PEDSTC)".
- [http://www.bdew.de/internet.nsf/id/A2A0475F2FAE8F44C12578300047C92F/$file/BDEW_RL_EA-am-MS-Netz_engl.pdf BDEW Medium Voltage Guideline] {{Webarchive. link. (2012-11-05 retrieved on 9 November 2008)
- [http://www.bdew.de/internet.nsf/id/A2A0475F2FAE8F44C12578300047C92F/$file/2010-07_BDEW_Ergänzung-zu-MS-Richtlinie_englisch.pdf BDEW MV Guideline 2nd Supplement] retrieved in 07/2010
- [http://www.bdew.de/internet.nsf/id/A2A0475F2FAE8F44C12578300047C92F/$file/2011-02_BDEW_Ergänzung-zu-MS-Richtlinie_end-englisch.pdf BDEW MV Guideline 3rd Supplement] {{Webarchive. link. (2013-01-27 retrieved in 02/2011)
- [https://www.bdew.de/internet.nsf/id/A2A0475F2FAE8F44C12578300047C92F/$file/4.%20Erg%C3%A4nzung%20BDEW-MSR%20final_englisch.pdf BDEW MV Guideline 4th Supplement] {{Webarchive. link. (2013-08-16 retrieved in 12/2015)
- [http://www.nationalgrid.com/uk/Electricity/Codes/gridcode/gridcodedocs/ National Grid Code] {{webarchive. link. (2010-02-14 retrieved on 9 2008-11-9)
- [https://webstore.iec.ch/preview/info_iec61000-4-11%7Bed2.0%7Den_d.pdf IEC 61000-4-11]
- (2005-10-17). "IEC 61000-4-34:2005 - electromagnetic compatibility, EMC, smart city".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Low-voltage ride-through — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report