By 2012, Iran had roughly 400 power plant units. By the end of 2013, it had a total installed electricity generation capacity of 70,000 MW, up from 90 MW in 1948, and 7024 MW in 1978. There are plans to add more than 5,000 MW of generation capacity annually to the power grid, which would almost double the total power generation capacity to 122,000 MW by 2022. The government of Iran planned to privatize 20 power plants by September 2010. Iran's peak demand for electricity was 45,693 MW during the summer of 2013.

It was predicted that Iran would account for 17.08% of MENA power generation by 2014. Natural gas was the major fuel used to generate electricity in Iran in 2009, accounting for an estimated 56.8% of primary energy demand (PED), followed by oil at 40.8% and hydroelectricity at 1.4%. As of 2010, the average efficiency of power plants in Iran was 38%. The figure should reach 45% within five years and 50% under Vision 2025.

Electricity generation in 2008 accounted for , or roughly 1% of world's total production, an increase of 5.9% from the year before. In 2008, the total electricity generated was , of which 93.3% was generated by power plants affiliated with the Ministry of Energy and (6.7%) by other institutions, which were mostly from the private sector. The largest share of electricity () was generated by steam power plants, while diesel power plants accounted for the smallest share of generation (). In 2008, the highest growth in generation of electricity belonged to gas and combined-cycle power plants, with a 9.3% growth rate while, the amount of electricity generated by hydroelectric power plants declined by 1.7%. As of 2010, the consumer price of electricity in Iran was 1.6 US cents per kilowatt-hour, while the real production cost was about 8.0 US cents. (See also: Cost of electricity by source)

In 2010, 900,000 jobs were directly or indirectly related to the Iranian power industry. Currently, Iran's spares power capacity stands at 3%, but this amount is much lower than the ideal 25% of peak power used. It has been estimated that 23.5% of the electricity generation is wasted in the transmission network. Iran's power grid has been connected to seven neighboring countries, Afghanistan, Pakistan, Iraq, Turkey, Armenia, Azerbaijan, and Turkmenistan, and annually exports of electricity.

Manufacturing

Arak

The electric power industry in Iran has become self-sufficient in producing the required equipment to build power plants. While most of the electricity generators are run by the government, the equipment producers and contractors are generally from the private sector. Iran is among the top ten manufacturers of gas turbines, with a capacity of up to 160 megawatts. Iranian engineers at JEMCO (a subsidiary of IDRO) have developed and produced one- and four-megawatt generators. Iran can manufacture materials for over 80% of hydraulic turbines and over 90% of gas turbines. In the near future, Iran could become a major player in building power plants with advanced technology (2009). Iran planned to build its first indigenous gas turbines by 2015. Iran has achieved the technical expertise to set up hydroelectric, gas, and combined-cycle power plants. Iran is one of the four countries in the world which can manufacture advanced V94.2 gas turbines. The Industrial Development and Renovation Organization of Iran (IDRO) is currently building the country's first 4-megawatt (MW) combined heat and power (CHP) turbo-generator in cooperation with the private sector.

Nuclear power plants

Model of the [[Bushehr Nuclear Power Plant

Darkhovin Nuclear Power Plant is Iran's first indigenously-designed and -built power plant besides the research reactor IR-40. Bushehr Nuclear Power Plant is Iran's first nuclear power plant; it was manufactured with the technical assistance of Russia.

International projects

Iran is not only self-sufficient in power-plant construction, but also has concluded a number of contracts on implementing projects in neighboring states. As of 2010, Iranian energy- and resource-development firms are involved in 50 projects worth over US$2.2 billion in more than 20 countries across the world. As at 2011, MAPNA was building power plants in Syria, Oman, and Iraq, and negotiations were underway to build two power plants in Lebanon.

One of Iran's most important international projects will see the construction of a $200-million hydroelectric dam in Nicaragua, starting in 2011. Iran is currently engaged in dam construction in Tajikistan, Armenia, and Azerbaijan, and consultations are underway with a number of other countries. Kenya, Sri Lanka, Bolivia, and Mali are the potential target markets being considered for exporting the country's technical and engineering services. In 2010, Iran won a contract to build a dam in Afghanistan and the third contract to build a power plant station in Syria. In December 2005, a wind farm was put in operation at Pushkin Pass in Armenia. The total installed capacity of the farm is 2.64 MW, from four 660 kW wind turbines. The wind farm was built with the support of a US$3.1M grant from the Iranian government. The Armenian and Iranian energy sectors are currently jointly constructing the Iran-Armenia Wind Farm, which is set to become the country's largest wind farm, having an installed electric capacity of 90 MW. As at 2012, Iran is building seven large power plants in Syria, Oman, Iraq, and Tajikistan.

Foreign direct investment

According to the Ministry of Energy, Germany has invested $445 million in construction of the Pareh-Sar combined-cycle power plant in northern Iran, while the UAE has invested $720 million in construction of a gas power plant and a combined-cycle power plant in Isfahan and Shiraz. In 2015, Iran and Russia signed an agreement regarding the construction of eight thermal power plants in Iran, with a total installed capacity of 2,800 MW. The investment per MW will be $3.57 million ($10 billion in total).

Privatization

Main article: Privatization in Iran

title=Iran Daily – Domestic Economy – 02/01/07 }}</ref> Solutions include production and use of more efficient light bulbs.

Mapna Company, Sahand, Bistoun, Shazand, Shahid Montazeri, Tous, Shahid Rajaei, and Neishabour power stations are among the profit-making plants. Work on privatizing them was scheduled to be finalized by late March 2007. Jahrom, Khalij-e Fars (Persian Gulf), and Sahand power plants were to be ceded to the private sector in 2009. All domestic power plants will be privatized gradually, except those the government feels it should run to ensure security of the national electricity grid. Power plants of Damavand, Mashhad, Shirvan, Kerman, Khalij-e Fars, Abadan, Bisotoon, Sanandaj, Manjil and Binalood, which have been turned into public limited firms, are ready for privatization. As of 2010, 20 power plants were ready for privatization in Iran. Upon ceding the 20 power plants to IPO, some 40% of the capacity of power plants nationwide will be assigned to the private and cooperative sectors. As of 2011, about 45 power plants across the country were to be handed over to the private sector. In 2012, it was announced that Iran's government, which had already turned over 17 of its 45 power plants to the private sector since 2008, would transfer 28 more plants with an estimated value of $11.4 billion (USD), by March 2013.

Energy/electricity bourse

The new energy/electricity bourse will be inaugurated in 2012. This will bring about more competition and transparency in Iran's electricity market. Experts believe that, following the launch of the subsidies reform plan, the electricity industry will undergo significant changes and will become more appealing to private investors.

As at 2012, Iran had over 400 power-plant units and 38 electricity-distribution companies, which buy the electricity from producers. Iran has over 100 companies that consume more than 20 MW of electricity. The average price of each kilowatt-hour of electricity is 450 rials (around 5 cents) during the first phase of the Subsidy Reform Law. The average final price of each kilowatt-hour of electricity will be 1000 rials (around 10 cents) in 2015. According to the government of Iran, power stations have to pay the export price of gas if they want to export electricity and must improve efficiency.

Iran's electricity export and related technical and engineering services exports was valued at $4 billion in 2011. In 2010, the total of Iran's electricity exports to Afghanistan, Iraq (650 MW), Azerbaijan, Armenia, Pakistan, and Turkey reached 878 megawatts, and the total of imports from Armenia (237 MW) and Turkmenistan was recorded at 463 megawatts. Jordan, India, Oman, Qatar, Russia, Syria, and the UAE are the new countries that have expressed interest in buying electricity from Iran.

Waste to energy

NameLocationCapacity (MW)TypeOperationalNotes
Shiraz Biogas Power PlantFars province1.1Biogas power station2009The plant uses organic waste as fuel for production of electricity from waste.
Mashhad Biogas Power PlantRazavi Khorasan province0.6Biogas power station2010The plant uses organic waste as fuel for production of electricity from waste.
?Tehran province3.5Waste incineration2012url=http://www.turquoisepartners.com/iraninvestment/IIM-Mar11.pdftitle=فیروزهaccess-date=2011-04-30archive-url=https://web.archive.org/web/20110812093858/http://www.turquoisepartners.com/iraninvestment/IIM-Mar11.pdfarchive-date=2011-08-12url-status=live }}
Sari Incineration Power PlantMazandaran province4Waste incineration2012The plant is designed to incinerate over 450 tonnes of waste per day, producing 10 MW of electricity. It is used to develop information for 20 other such plants to be deployed in Iran's major cities.

Fossil

NameLocationCapacity (MW)TypeOperationalNotes
Rudeshur Power PlantMarkazi province2000Natural gas power station2007Open-cycle gas turbine (OCGT). This is the first private power plant in Iran, belonging to Arian Mah-Taab Gostar Co.
Fars province1373Natural gas power station1994CHP-type thermal station incorporating Iran's first locally-produced gas turbine, generator set, and steam turbine
Sultanyeh Power PlantZanjan province1000Natural gas power station2011CHP-type thermal station
Urmia Power PlantWest Azarbaijan Province60Natural gas power station1982Natural-gas thermal station in the city of Urmia
Urmia Combined Power PlantWest Azarbaijan Province1500Natural gas power station2011CHP-type thermal station
Khoy Combined Power PlantWest Azarbaijan Province453Natural gas power station1996CHP-type thermal station
Iranshahr steam Power PlantSistan and Baluchestan province256Natural gas power station1996Thermal power station running on natural gas as primary fuel and furnace oil as backup fuel
Chabahar Combined Power PlantSistan and Baluchestan province478Natural gas power station2011Combined-cycle plant running on natural gas as primary fuel and furnace oil as backup fuel; part of generation for export to Pakistan
Konarak NG Power PlantSistan and Baluchestan province150Natural gas power station2009Thermal power station
Zahedan NG Power PlantSistan and Baluchestan province230Natural gas power stationurl=http://www.sbrec.co.ir/persian/amar/amar_dispaching/goz_pik_bar_89.ppstitle=Forecasting the status of the Sistan and Baluchestan regional electricity network In the peak of summer 1389language=faaccess-date=2011-08-02archive-url=https://web.archive.org/web/20120328111146/http://www.sbrec.co.ir/persian/amar/amar_dispaching/goz_pik_bar_89.ppsarchive-date=2012-03-28url-status=dead}}
Zahidan Diesel Power PlantSistan and Baluchestan province24Diesel engine generator1976Electrical generation currently used only for peak power management
Zabul Diesel Power PlantSistan and Baluchestan province29Diesel engine generatorElectrical generation currently used only for peak power management
Khash Diesel Power PlantSistan and Baluchestan province22Diesel engine generatorElectrical generation currently used only for peak power management
Iranshahr Diesel Power PlantSistan and Baluchestan province30Diesel engine generatorElectrical generation currently used only for peak power management
Saravan Diesel Power PlantSistan and Baluchestan province13Diesel engine generatorElectrical generation currently used only for peak power management
Iranshahr combined Power PlantSistan and Baluchestan province1000Natural gas power station2011Combined-cycle plant running on natural gas as primary fuel and furnace oil as backup fuel
Shaheed Salimi Neka Combined Power PlantMazandaran province2214Natural gas power station2006Combined-cycle plant running on natural gas as primary fuel and furnace oil as backup fuel
Nishapur Combined Power PlantRazavi Khorasan province1042Natural gas power station1993Combined-cycle plant running on natural gas as primary fuel and diesel as backup fuel
Fars Combined Power PlantFars province1050Natural gas power station2008Combined-cycle plant running on natural gas as primary fuel and furnace oil as backup fuel
Sarehpar Combined Power PlantGilan province968Natural gas power station2010Combined-cycle plant running on natural gas as primary fuel and furnace oil as backup fuel
Shaheed Kaveh Combined Power PlantSouth Khorasan province630Natural gas power station2008Combined-cycle plant running on natural gas as primary fuel and diesel as backup fuel; being upgraded to 950 MW
Mahshahr NG Power PlantKhuzestan province968Natural gas power station2012Combined-cycle plant under construction
Abadan NG Power PlantKhuzestan province493Natural gas power station2002Plant convertible to combined cycle
Aliabad Katool Combined Power PlantGolestan province1500Natural gas power station2011Combined-cycle plant running on natural gas as primary fuel and diesel as backup fuel
Zavareh Combined Power PlantIsfahan province484Natural gas power station2011Combined-cycle plant running on natural gas as primary fuel and diesel as backup fuel
Aryan Combined Power PlantZanjan province1000Natural gas power station2013Combined-cycle plant under construction
Zanjan 4 Combined Power PlantZanjan province484Natural gas power station2012Combined-cycle plant under construction
Zanjan 1 Combined Power PlantZanjan province484Natural gas power stationCombined-cycle plant under construction
Khorramabad Combined Power PlantLorestan province2000Natural gas power stationCombined-cycle plant under construction
Behistun Steam Power PlantKermanshah province1280Natural gas power station2013Thermal power station
Zagrus NG Power PlantKermanshah province648Natural gas power station2011Gas-turbine plant constructed adjacent to Behistun Steam Power Plant; convertible to combined cycle with resultant increased output of 1000 MW
Islamabad Combined Power PlantKermanshah province484Natural gas power station2012Combined-cycle plant
Islamabad NG Power PlantKermanshah province100Natural gas power station2011Gas-turbine plant
Pasargadae Combined Power PlantHormozgān Province500Natural gas power station2011Combined-cycle plant situated on Qeshm island is to be connected with submarine power cable to the national grid
Kahnooj Combined Power PlantKerman province1000Natural gas power station2013Combined-cycle plant under construction
Kerman Combined Power PlantKerman province2000Natural gas power station2010Combined-cycle plant
Noshahr NG Power PlantMazandaran province50Natural gas power station2009Gas-turbine plant
West Mazandaran Combined Power PlantMazandaran province484Natural gas power stationCombined-cycle plant under construction
Amirabad Port NG Power PlantMazandaran province75Natural gas power stationGas-turbine plant under construction
Sarakhs Combined Power PlantRazavi Khorasan province1650Natural gas power station2012Combined-cycle plant under construction; waste hot water from the plant is to be used for industrial greenhouse agriculture

Geothermal

NameLocationCapacityTypeOperationalNotes
Meshkinshahr Geothermal Power PlantArdabil province250 MWGeothermal power station2010Iran's first geothermal electricity generation station

Hydroelectric

In service

NameLocationCapacity (MW)TypeOperationalNotes
Shahid Abbaspour Dam (Karun-1)Khuzestan2,000Hydroelectric dam1976url=http://globalenergyobservatory.org/form.php?pid=40417title=Shahid Abbaspour (Karun-1) Hydroelectric Power Plantpublisher=Global Energy Observatoryaccess-date=2 March 2014archive-url=https://web.archive.org/web/20151004002104/http://globalenergyobservatory.org/form.php?pid=40417archive-date=4 October 2015url-status=live }}
Karkheh DamKhūzestān520Hydroelectric dam2001The dam was built by Islamic Revolutionary Guard Corps.
Amir Kabir DamKaraj90Hydroelectric dam1961In addition to power, it provides water for the city of Tehran.
Dez DamKhuzestan520Hydroelectric dam1963url=http://www.industcards.com/hydro-iran.htmarchive-url=https://archive.today/20120908213617/http://www.industcards.com/hydro-iran.htmurl-status=usurpedarchive-date=8 September 2012title=Hydroelectric Power Plants in Iranpublisher=Power Plants Around The Worldwork=Gallerydate=30 October 2012access-date=2 March 2014 }}
Karun-3 DamKhuzestan2,280Hydroelectric dam2005url=http://globalenergyobservatory.org/form.php?pid=40416title=Karun 3 Hydroelectric Power Plantpublisher=Global Energy Observatoryaccess-date=2 March 2014archive-url=https://web.archive.org/web/20151004005554/http://globalenergyobservatory.org/form.php?pid=40416archive-date=4 October 2015url-status=live }}
Karun-4 DamChaharmahal and Bakhtiari1,020Hydroelectric dam2010
Masjed Soleyman Dam (Karun-2)Masjed-Soleyman2,000Hydroelectric dam2002
Lar Dam, AmolMazandaran province30Hydroelectric dam1984
Latyan DamTehran province45Hydroelectric dam1967
Kouhrang DamIsfahan province35.1Hydroelectric dam2002
Lavarak DamTehran province47Hydroelectric dam2009
Shahid Rajaee DamMazandaran province13.5Hydroelectric dam2007
Shahid Talebi DamFars province2.3Hydroelectric dam1994In operation
Yasuj Chain DamKohgiluyeh and Boyer-Ahmad province16.8Hydroelectric dam2005Being upgraded to 25 MW
Shahid Azimi Dam?1Hydroelectric damIn operation
Piran DamKermanshah province8.4Hydroelectric dam2011In operation
Jiroft DamKerman province85Hydroelectric dam1993
Seimareh DamIlam province & Lorestan province480Hydroelectric dam2013In operation
Rudbar Lorestan DamLorestan province450Hydroelectric dam2017In operation
Manjil DamGīlān Province87Hydroelectric dam1962
Sardasht DamWest Azerbaijan150Hydroelectric dam2018
Khoda Afrin DamEast Azerbaijan102Hydroelectric dam2010On border with disputed territories
Zayanderud DamIsfahan province55Hydroelectric dam1971
Rais Ali Dilavari DamBushehr province70Hydroelectric dam2008
Mulla Sadra DamFars province100Hydroelectric dam2007
Doroodzan DamFars province10Hydroelectric dam1973
Marun DamKhuzestan151Hydroelectric dam1976
Talaqan DamQazvin province18Hydroelectric dam2006
Gavoshan DamKurdistan province11Hydroelectric dam2004
Upper Gotvand DamKhuzestan province1,000Hydroelectric dam2012, 2015 (?)Phase 1 was operational in 2012. Phase 2 will add 1,000 MW.
Daryan DamKermanshah province210Hydroelectric dam2018Operational
Salman Farsi DamFars province13Hydroelectric dam2009
Ardeh DamGilan province0.125Run-of-the-river1991The hydroelectric plant is not connected to the national grid.
Darreh Takht Power PlantLorestan province1.6Run-of-the-river1986, 2000Operational
Micro Power Plants227Run-of-the-river2004Operational; five power plants nationwide

Proposed or under construction

NameLocationCapacityTypeOperationalNotes
Bakhtiari DamLorestān Province1,500Hydroelectric dam2018 (??)The dam is currently under construction. Upon completion it will become the world's tallest dam at 325 meters.
Iran–Turkmenistan Friendship DamBorder of Iran & Turkmenistan16Hydroelectric damurl=http://www.tehrantimes.com/index_View.asp?code=192035title=Iran, Turkmenistan review water, power tiesdate=11 April 2009work=Tehran Timesaccess-date=2012-02-07archive-url=https://web.archive.org/web/20110614002437/http://www.tehrantimes.com/index_View.asp?code=192035archive-date=2011-06-14url-status=live }}
Khersan-3 DamChaharmahal and Bakhtiari400Hydroelectric dam2015 (??)Under construction
Joreh DamKhuzestan province48Hydroelectric dam2011 (??)Under construction
Sarrud Dam65Hydroelectric damUnder construction
Tarik DamGilan province2.8Hydroelectric dam2016 (??)Dam is operational since 1977; power station is being constructed
Zayanderud Regulatory DamIsfahan province8.5Hydroelectric damUnder construction
Aras Watershed DamMeghri260Hydroelectric dam2017 (??)Under construction
Zalaki Dam466Hydroelectric damFeasibility study
Liro Dam324Hydroelectric damFeasibility study
Sezar 4-1 Dam265Hydroelectric damFeasibility study
Dez 3-1 Dam930Hydroelectric damFeasibility study
Hajghalandar Dam80Hydroelectric damFeasibility study
Chambastan Dam135Hydroelectric damFeasibility study
Namarestagh Dam33.5Hydroelectric damFeasibility study
Sardabrud Dam20Run-of-the-riverFeasibility studies completed in 2009
Gulestan Dam5.6Run-of-the-riverFeasibility studies completed in 2009
Pir Taghi Dam240Hydroelectric damFeasibility study
Namhil Dam496Hydroelectric damFeasibility studies completed
Pavehrud Dam250Hydroelectric damFeasibility studies completed
Kalat Dam292Hydroelectric damFeasibility study
Khersan-2 Dam580Hydroelectric damFeasibility study
Khersan-1 Dam2,638Hydroelectric damFeasibility study
Bazaft Dam240Hydroelectric damFeasibility study
Karun-3 Axis-3 Dam1,458Hydroelectric damFeasibility study
Karun-5 Dam560Hydroelectric damFeasibility study
Karun-2 Axis-8 Dam1,000Hydroelectric damFeasibility study
Garsha Godar Pir Dam200Hydroelectric damFeasibility study
Karun Buran Dam284Hydroelectric damFeasibility study
Tang Mashure Dam167Hydroelectric damFeasibility study
Sazbon Dam375Hydroelectric damFeasibility study
Karkheh-2 Dam118Hydroelectric damFeasibility study
Sazbon Jadid Axis-2 Dam300Hydroelectric damFeasibility studies completed
Dez Regulator DamKhuzestan province28Hydroelectric damFeasibility study

Pumped-storage hydroelectric

NameLocationCapacityTypeOperationalNotes
Siah Bishe Pumped Storage Power PlantMazandaran provinceOutput: 1,040 MW; input: 940 MWPumped-storage hydroelectricity2013–2015Operational; Iran's first pumped-storage hydroelectric station
Ilam Pump Storage DamIlam provinceOutput: 1,000 MWPumped-storage hydroelectricityFeasibility study
Azad DamKurdistan province10 MW; regeneration: 500 MWHydroelectric dam / pumped-storage hydroelectricity2014Operational

Nuclear

In service

NameLocationCapacity (MW)TypeOperationalNotes and references
Bushehr Nuclear Power PlantBushehr915VVER2010-07-01Originally Bushehr Nuclear Power Plant was planned to have four PWRs, each with an electricity generating capacity of 915 MW. Bushehr-1 reactor achieved commercial operation in September 2013.

Under construction

NameLocationCapacity (MW)TypeOperationalNotes
IR-40Arak40Heavy water reactorNAThis is a thermal reactor designed to produce power and isotopes. It is Iran's first indigenously built nuclear reactor.
Darkhovin Nuclear Power PlantDarkhovin360Heavy water reactorNAConstruction of Darkhovin Nuclear Power Plant began in 2008. It is to be built based on indigenous technologies developed for IR-40, and is scheduled to come online in 2016.

Solar

In service

With about 300 clear sunny days a year and an average of 2,200 kilowatt-hours of solar radiation per square meter, Iran has a great potential to tap solar energy.

NameLocationCapacityTypeOperationalNotes
Yazd solar thermal power plantYazd17 MWIntegrated solar combined cycle2009Yazd solar thermal power plant is the world's first integrated solar combined cycle power station using natural gas and solar energy. It is the largest solar power plant in the Middle East and the eighth largest in the world.
Shiraz solar power plantShiraz250 KWConcentrating solar power2009Shiraz solar power plant is Iran's first solar power station. It is currently being upgraded to 500 kW.
Mashhad Solar Power PlantMashhad432 KW2011
Malard 365 KW Solar Power PlantMalard365 KWPV solar power plant2014Malard Solar Power Plant is the largest grid-tide solar power plant in Iran by the Atrin Parsian Solar and Biomass Co.
HamedanHamedan, Iran14 MWPhotovoltaic power station2017url=http://www.suna.org.ir/en/news/916/The-biggest-photovoltaic-power-plant-in-the-country-with-the-capacity-of-14-MW-is-now-ready-for-operation-in-Hamedan-provincetitle=The biggest photovoltaic power plant in the country with the capacity of 14 MW is now ready for operation in Hamedan provincelast=SUNAwebsite=www.suna.org.iraccess-date=2017-02-20archive-url=https://web.archive.org/web/20170221011623/http://www.suna.org.ir/en/news/916/The-biggest-photovoltaic-power-plant-in-the-country-with-the-capacity-of-14-MW-is-now-ready-for-operation-in-Hamedan-provincearchive-date=2017-02-21url-status=dead}}
IsfahanIsfahan, Iran10 MWPhotovoltaic power station2017url=http://www.yjc.ir/fa/news/5971558/%DA%86%DB%8C%D8%AA%E2%80%8C%DA%86%DB%8C%D8%A7%D9%86-%D8%A8%D9%87%D8%B1%D9%87-%D8%A8%D8%B1%D8%AF%D8%A7%D8%B1%DB%8C-%D8%A7%D8%B2-%D9%86%DB%8C%D8%B1%D9%88%DA%AF%D8%A7%D9%87-10%D9%85%DA%AF%D8%A7%D9%88%D8%A7%D8%AA%DB%8C-%D8%A8%D8%B1%D9%82-%D8%A7%D8%B5%D9%81%D9%87%D8%A7%D9%86-%D8%AA%D8%A7-%D8%AF%D9%88-%D9%87%D9%81%D8%AA%D9%87-%D8%AF%DB%8C%DA%AF%D8%B1title=چیت‌چیان: بهره برداری از نیروگاه 10مگاواتی برق اصفهان تا دو هفته دیگرlast=YJCfirst=خبرگزاری باشگاه خبرنگاران آخرین اخبار ایران و جهانwebsite=خبرگزاری باشگاه خبرنگاران آخرین اخبار ایران و جهان YJCdate=8 February 2017language=fa-IRaccess-date=2017-02-20archive-url=https://web.archive.org/web/20170222054134/http://www.yjc.ir/fa/news/5971558/%DA%86%DB%8C%D8%AA%E2%80%8C%DA%86%DB%8C%D8%A7%D9%86-%D8%A8%D9%87%D8%B1%D9%87-%D8%A8%D8%B1%D8%AF%D8%A7%D8%B1%DB%8C-%D8%A7%D8%B2-%D9%86%DB%8C%D8%B1%D9%88%DA%AF%D8%A7%D9%87-10%D9%85%DA%AF%D8%A7%D9%88%D8%A7%D8%AA%DB%8C-%D8%A8%D8%B1%D9%82-%D8%A7%D8%B5%D9%81%D9%87%D8%A7%D9%86-%D8%AA%D8%A7-%D8%AF%D9%88-%D9%87%D9%81%D8%AA%D9%87-%D8%AF%DB%8C%DA%AF%D8%B1archive-date=2017-02-22url-status=live}}
ArakArak, Iran1 MWPhotovoltaic power station2017
Abhar Razi Power PlantAbhar, Ian110 KVPhotovoltaic power station2017Abhar Razi solar power plant is Iran's first private sector power plant. It is currently being upgraded to 7 MW.
MahanKerman20 MWPhotovoltaic power station2017

Under construction

NameLocationCapacity (MW)TypeOperationalNotes
Qazvin PV Solar Power PlantQazvin, Iran1000Photovoltaic power station2025–2026It will be an array of 100 PV solar power stations, each with a nominal capacity of 100MW.
HamedanHamedan, Iran100 MWPhotovoltaic power station2017100 MW capacity of renewable energy power plants which were planned to be installed by the private sector in 2016–2017, for the moment 50 MW are under construction and the rest will be completed by the end of March 2017
IsfahanIsfahan, Iran50 MWPhotovoltaic power station2017Isfahan – Jarghoyeh Sofla
Mahankerman100 MWPhotovoltaic power station2018Kerman – Mahan[130]

Wind

NameLocationCapacityTypeOperationalNotes
Binalood wind farmRazavi Khorasan province28.2 MWOnshore wind farm2008The wind farm uses 43 units of 660 kW. It is currently being upgraded to 93 turbine units with a total capacity of 61.2 MW.
Manjil and Rudbar Wind FarmGilan province100.8 MWOnshore wind farm1994The wind farm uses 171 units of 300–660 kW turbines. It was the first wind farm in Iran.
Kahak wind farm(MAPNA Renewable Generation Company)Qazvin province55 MWOnshore wind farm2014The wind farm uses 10 units of 2.5 MW. It is currently being developed to 40 turbine units with a total capacity of 100 MW.
Tarom (Siahpoush) wind farm(Arian Mah Baad co.)Qazvin province200 MWOnshore wind farm2018Currently in first phase, 18 WTGs (each unit capacity is 3.400 MW) were installed with a total capacity of 61.2 MW.

Others

NameLocationCapacityTypeOperationalNotes
Qazvin hydrogen power plantQazvin province200 KWPhotoelectrochemical cell / fuel cell2009The plant is based on the idea of hydrogen economy, using photoelectrochemical cells to produce hydrogen for electricity generation in fuel cells.
Shahid Esmaili power plantTehran province7 MWCombined heat & power (CHP) systemCHP is a system that involves the recovery of waste heat from power generation to form useful energy for other purposes such as heating. The system increases the efficiency of the power plant to more than 1.5 times that of traditional power plants.

Decentralized power generation

In addition to the above power plants, there was 1800 MW cumulative installed capacity in 2011, which belonged to small -scale decentralized power plants, some of which were not connected to the national grid, and many being privately built and run. This capacity is planned for increase to more than 10,000 MW with emphasis on renewable energy and trigeneration. Similarly, there was 418 MW of capacity belonging to diesel-based plants supplying hard-to-reach areas.

References

References

  1. (2013-08-29). "ظرفیت تولید برق کشور به 75 هزارمگاوات خواهد رسید".
  2. "Encyclopædia Iranica | Articles". Iranica.com.
  3. (2000-05-08). "Iran Electric Power Industry in brief". .tavanir.org.ir.
  4. (19 June 2011). "حجم تاسيسات برق دو برابر مي‌شود – Tabnak.IR | تابناك". Tabnak.IR.
  5. "The Minister of energy of I.R.Iran: 5000 MW electric power generation capacity will be added to the total installed electric power capacity of the country annually – سايت خبري شرکت توانير". News.tavanir.org.ir.
  6. Frosty Wooldridge. "Baseball: Boston 's Atchison Opzionato Per Tripla-A Pawtucket". OfficialWire.
  7. "رکورد مصرف برق ایران شکسته شد".
  8. "Iran Top Producer of Hydroelectric Power Plants". Zawya.
  9. (March 2014). "Iran domestic energy consumption equivalent to EU industries".
  10. "Annual Review 2007/08".
  11. (2011-06-23). "Nation's epileptic power situation… lessons from Iran". Businessdayonline.com.
  12. "Blackouts Threaten Iran". Payvand.com.
  13. "No. 4142 | Domestic Economy | Page 4". Irandaily.
  14. "Iran Daily – Domestic Economy – 05/18/09".
  15. "Iran Daily – Domestic Economy – 08/16/09".
  16. (16 November 2021). "Iran moving towards self-sufficiency in power plant equipment manufacturing".
  17. (2010-03-21). "No. 3914 | Domestic Economy | Page 4". Irandaily.
  18. (2006-01-10). "Iran Press: Official Provides Details on 'Native' Iranian Nuclear Plant". redOrbit.
  19. "WPONAC: Iran Nuclear Milestones". Iranwatch.org.
  20. (2010-11-06). "Ahwazstudies.org". Ahwazstudies.org.
  21. "Iran-daily.com".
  22. [http://www.nitc.co.ir/iran-daily/1387/3267/html/economy.htm] {{Dead link. (November 2018)
  23. "Iran emerging as major energy exporter". Payvand.com.
  24. "Iran-daily.com".
  25. "فیروزه".
  26. "Renewable Energy Armenia – Wind Power Potential". Renewableenergyarmenia.am.
  27. "Projects – Iran-Armenia Wind Farm". Ebrdrenewables.com.
  28. "Iran currently world's 15th major electricity producer".
  29. "Russia and Iran have signed an agreement regarding the construction of eight thermal power plants in Iran".
  30. "Iran Daily – Domestic Economy – 02/01/07".
  31. "Iran-daily.com".
  32. "Iran Daily – Domestic Economy – 12/14/08".
  33. "Iran Daily – Domestic Economy – 12/11/08".
  34. "Iran Daily – Domestic Economy – 04/13/09".
  35. (2010-03-20). "Iran to privatize 20 power plants". Payvand.com.
  36. "No. 3731 | Domestic Economy | Page 4". Irandaily.
  37. "No. 4075 | Domestic Economy | Page 4". Irandaily.
  38. "Government to privatize 18 Iranian power plants – Tehran Times".
  39. "Iran to open energy bourse by March 2012". Tehran Times.
  40. "فیروزه".
  41. [http://www.turquoisepartners.com/iraninvestment/IIM-Mar11.pdf Turquoise Partners: Iran Investment Monthly (March 2011)] {{Webarchive. link. (2011-08-12 Retrieved April 30, 2011.)
  42. "No. 3866 | Domestic Economy | Page 4". Irandaily.
  43. http://financialtribunedaily.com/articles/2014/09/06/energy/46/no-subsidized-gas-power-plants{{Dead link. (November 2025)
  44. "Iran's Electricity Industry Exports to Hit $4 bln". Payvand.com.
  45. (2010-11-03). "فرهیختگان – توليد برق از زباله در مشهد و شيراز". Farheekhtegan.ir.
  46. "مدیرعامل شرکت پیشگامان صنعت و نیرو از پروژه نیروگاه زباله‌سوز مشهد می گوید".
  47. ۱۶ مهر ۱۳۸۸. (1999-02-22). "نیروگاه تولید برق با سوخت بیوگاز در مشهد 600 مشترک دارد | موتور برق گازسوز، ژنراتور برق گازسوز، موتور پمپ، موتور چند منظوره گرین پاور". Greenpower.ir.
  48. "شهرسازی – راه اندازي نخستين نيروگاه بيوگاز خاورميانه". Nayyer.ir.
  49. "فیروزه".
  50. "عملیات اجرایی احداث نیروگاه زباله سوز در ساری آغاز شد". Zayeat.com.
  51. "عمليات ساخت نخسين نيروگاه زباله سوز كشور در نوشهر آغاز شد".
  52. "اخبارتنکابن،رامسر،عباس آباد،گیلان،مازندران :: نيروگاه زباله‌سوز در تنکابن احداث می شود". Daryadim.com.
  53. "Arian Mah-Taab Gostar Co.".
  54. Kazeroon Powerplant. "درباره ما | نیروگاه سیکل ترکیبی کازرون". Kzccpp.ir.
  55. "Untitled Page".
  56. "شرکت مدیریت تولید برق زنجان | نيروگاه 1000 مگاواتي زنجان – سلطانيه". Zpgmc.ir.
  57. "خبر مورد نظر یافت نشد.". Eqeep.ir.
  58. "دیزل پارسیا". dieselparsia.com.
  59. "تاریخچه". Azarw-ppt.ir.
  60. "تصاویر – نيروگاه گازي اروميه". Parskayhan.org.
  61. "تø§Ø±Ûœø®Ú†Ù‡". Azarw-ppt.ir.
  62. "بهره‌برداري از نيروگاه ايرانشهر با حضور وزير نيرو آغاز شد – سايت خبري شرکت توانير".
  63. "خلاصه سوابق پروژه". sbpm.ir.
  64. "بهره برداری رسمی از بخش گاز نیروگاه سیکل ترکیبی چابهار". Irannews24.ir.
  65. "پایگاه اطلاع رسانی دولت – مرحله نخست نیروگاه سیکل ترکیبی چابهار با حضور رئیس جمهور افتتاح شد". Dolat.ir.
  66. "کنارک". Sb-ostan.ir.
  67. "Forecasting the status of the Sistan and Baluchestan regional electricity network In the peak of summer 1389".
  68. "The important role of the Iranshahr steam power plant in stabilizing the country's electricity voltage".
  69. "شرکت مديريت توليد برق نکا". Npgm.co.ir.
  70. (2010-08-08). "افزايش توليد انرژي الكتريكي و راندمان نيروگاه سيكل تركيبي نيشابور – سايت خبري شرکت توانير". News.tavanir.org.ir.
  71. SabaInfo. "نیروگاه سیکل ترکیبی فارس در کشور، مقام سوم را کسب نمود". Sabainfo.ir.
  72. SabaInfo. "بازدید استادار گیلان از نیروگاه سیکل ترکیبی پره سر شهرستان رضوانشهر". Sabainfo.ir.
  73. "نیروگاه گازی و سیکل ترکیبی قاین – نیروگاه سیکل ترکیبی قاین".
  74. "شرکت توسعه انرژی متین". Matinco.net.
  75. SabaInfo. "احداث نیروگاه سیکل ترکیبی 1000 مگاواتی در ماهشهر". Sabainfo.ir.
  76. (2010-08-08). "با حضور رئيس جمهوري :‌نيروگاه گازي آبادان امروز افتتاح مي‌شود – سايت خبري شرکت توانير". News.tavanir.org.ir.
  77. (2011-11-21). "نیروگاه گازی علی آباد کتول افتتاح شد". Hamshahrionline.ir.
  78. "Archived copy".
  79. "شرکت مدیریت تولید برق زنجان | نيروگاه 1000 مگاواتي سيكل تركيبي زنجان – آريان". Zpgmc.ir.
  80. SabaInfo. "موافقت 200 میلیون یورو تسهیلات ارزی برای احداث نیروگاه سیکل ترکیبی زنجان 4". Sabainfo.ir.
  81. "شرکت مدیریت تولید برق زنجان | نيروگاه 484 مگاواتي زنجان". Zpgmc.ir.
  82. "شرکت مدیریت تولید برق زنجان | نيروگاه 484 مگاواتي زنجان". Zpgmc.ir.
  83. SabaInfo. (November 2018). "احداث نیروگاه سیکل ترکیبی 2000 مگا واتی خرم آباد و کارخانه سیمان". Sabainfo.ir.
  84. "تا 3 سال آینده ظرفیت تولید برق در استان کرمانشاه به 2500 مگاوات می رسد 500 مگاوات برق به عراق صادر می کنیم". Kermanshah.isna.ir.
  85. چهارشنبه ۱۹ بهمنمصادف با 08 Feb 2012ساعت ۰۲:۰۸ به وقت تهران. "نیروگاه بیستون کرمانشاه بزرگترین نیروگاه تولید برق کشور خواهد شد – ایرنا | خبر فارسی". Khabarfarsi.com.
  86. "اولين بازديد 2000 ساعته واحد اول گازی نيروگاه زاگرس انجام گرفت". bisotounps.ir.
  87. "مدیرعامل نیروگاه بیستون گفت: تابستان امسال هیچگونه محدودیت تولید برق نداریم". bisotounps.ir.
  88. "کرمانشاه در آینده نه چندان دور به یکی از قطب های تولید برق کشور تبدیل می شود". Kermanshah.isna.ir.
  89. SabaInfo. (November 2018). "بهره برداری از فاز 1 نیروگاه 500 مگاواتی قشم". Sabainfo.ir.
  90. "خبر – با تشريح آخرين برنامه‌ها از سوي مديران گروه مطرح شد تبديل گروه بهمن به هلدينگ چند رشته‌اي". Donya-e-eqtesad.com.
  91. SabaInfo. "کهنوج". Sabainfo.ir.
  92. "افتتاح بزرگترین پروژه سیکل ترکیبی کشور در کرمان". Kerman.irib.ir.
  93. SabaInfo. "نیروگاه 50 مگاواتی گازی غرب مازندران احداث شد". Sabainfo.ir.
  94. "ettelaat newspaper". Ettelaat.com.
  95. "مدیر بندر امیرآباد خبر داد: پیشرفت فیزیکی 75 درصدی نیروگاه برق بندر امیرآباد".
  96. (2007-10-24). "شروع عملیات اجرایی ساخت یك نیروگاه در سرخس". Aftabir.com.
  97. "طرحهای گلخانه های صنعتی در سرخس اجرا می شود". Ashianehsabz.com.
  98. "Shahid Abbaspour (Karun-1) Hydroelectric Power Plant". Global Energy Observatory.
  99. (30 October 2012). "Hydroelectric Power Plants in Iran". Power Plants Around The World.
  100. "Dez Dam Hydroelectric Power Plant". Global Energy Observatory.
  101. "Karun 3 Hydroelectric Power Plant". Global Energy Observatory.
  102. "Masjed-e-Soleiman Hydroelectric Power Plant". Global Energy Observatory.
  103. "Your Dedicated Source of Hydropower News".
  104. (23 June 2017). "Water Starts Flowing into Sardasht Dam".
  105. "درآمد یک میلیارد تومانی حاصل از تولید برق نیروگاه گتوند در روز". Irannews24.ir.
  106. "Darre Takht 1 Power Plant". Iran Water and Power Resources Development Co..
  107. "Darre Takht 2 Power Plant". Iran Water and Power Resources Development Co..
  108. "Micro Power Plant". Iran Water and Power Resources Development Co..
  109. (11 April 2009). "Iran, Turkmenistan review water, power ties". Tehran Times.
  110. "News – All Four Units of Siyah Bisheh Storage Pump".
  111. "BUSHEHR-1". International Atomic Energy Agency.
  112. (2010-12-20). "Solar Power Plants To Replace Fossil Fuel". Zawya.
  113. SUNA. "The biggest photovoltaic power plant in the country with the capacity of 14 MW is now ready for operation in Hamedan province".
  114. YJC, خبرگزاری باشگاه خبرنگاران {{!}} آخرین اخبار ایران و جهان {{!}}. (8 February 2017). "چیت‌چیان: بهره برداری از نیروگاه 10مگاواتی برق اصفهان تا دو هفته دیگر".
  115. "وزیر نیرو در مراسم افتتاحیه بزرگترین نیروگاه خورشیدی مگاواتی اراک؛ احداث ۵ اکو پارک توسط پژوهشگاه نیرو در کشور > پژوهشگاه نیرو".
  116. Organization, Renewable Energy and Energy Efficiency. "Soon in Mahan of Kerman province the largest solar power plant with the capacity of 20 MW will be operated".
  117. (2016-04-24). "Qazvin, Italian investors sign solar plant deal".
  118. "قم ظرفيت 3200 مگاوات نيروگاه توليد پراكنده برق را دارد".
  119. (27 July 2011). "Iran, world, political, sport, economic news and headlines". MehrNews.com.
  120. "New Page 1".
  121. "ساخت نیروگاه های انرژی تجدید پذیر در کشور". Shams-solar.com.
  122. "روستاهاي کردستان با نيروگاه خورشيدي برقدار مي‌شوند". Jamejamonline.ir.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about List of power stations in Iran — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report