Skip to content
Surf Wiki
Save to docs
geography/china

From Surf Wiki (app.surf) — the open knowledge base

List of Beijing Subway stations

None

List of Beijing Subway stations

None

Map of Beijing Subway

The following is a list of stations found within the Beijing Subway.

Stations opened after 2007 have no official station codes.

Line 1 and Batong Line

Main article: Line 1 (Beijing Subway), Batong line

Since August 29, 2021, through services have operated between Line 1 and Batong Line, so the lines are effectively operated as a single line.[[File:YUQUANLU Station 20181117.jpg|thumb|right|Yuquan Lu station platform]]

Jianguomen station platform
Dawang Lu station platform
Sihui station platform
Jiukeshu station eastbound platform
CodeStationChinese nameLocationTransfersPlatform typeGradeOpened
101*53#*
(Restricted)zh53号}}ShijingshanSplitUndergroundNot operational
102**
(Restricted)zh福寿岭}}SideUnderground
103zh苹果园}}SideUndergroundtitle=地铁公司1971 -- 1980年url=http://bjsubway.com/node/1842website=Beijing Subwayaccess-date=2020-09-17archive-url=https://web.archive.org/web/20101231221907/http://bjsubway.com/node/1842archive-date=2010-12-31language=zhurl-status=dead}}
104zh古城}}SideUnderground7 November 1971
105zh八角游乐园}}SideUnderground
106zh八宝山}}IslandUnderground
107zh玉泉路}}IslandUnderground5 August 1971
108zh五棵松}}HaidianIslandUnderground
109zh万寿路}}IslandUnderground
110zh公主坟}}IslandUnderground15 January 1971
111zh军事博物馆}}IslandUnderground
112zh木樨地}}Xicheng(out-of-system interchange)IslandUnderground
113zh南礼士路}}IslandUnderground
114zh复兴门}}
(Out-of-system interchange via )IslandUndergroundtitle=地铁公司1981 -- 1990年地铁大事记url=http://bjsubway.com/node/1840website=Beijing Subwayaccess-date=2020-09-17archive-url=https://web.archive.org/web/20101231221853/http://bjsubway.com/node/1840archive-date=2010-12-31language=zhurl-status=dead}}
115zh西单}}IslandUndergroundtitle=地铁公司1991 -- 2000年大事记url=http://bjsubway.com/node/1838website=Beijing Subwayaccess-date=2020-09-17archive-url=https://web.archive.org/web/20101231221943/http://bjsubway.com/node/1838archive-date=2010-12-31language=zhurl-status=dead}}
116zh天安门西}}IslandUnderground28 September 1999
117zh天安门东}}DongchengIslandUnderground
118zh王府井}}IslandUnderground
119zh东单}}IslandUnderground
120zh建国门}}IslandUnderground
121zh永安里}}ChaoyangIslandUnderground
122zh国贸}}IslandUnderground
123zh大望路}}IslandUnderground
124/BT01zh四惠}}IslandAt-grade
125/BT02zh四惠东}}SideAt-grade
BT03zh高碑店}}SideElevated27 December 2003
BT04zh传媒大学}}SideAt-grade
BT05zh双桥}}SideElevated
BT06zh管庄}}SideElevated
BT07zh八里桥}}SideElevated
BT08zh通州北苑}}TongzhouSideElevated
BT09zh果园}}SideElevated
BT10zh九棵树}}SideElevated
BT11zh梨园}}SideElevated
BT12zh临河里}}SideElevated
BT13zh土桥}}SideElevated
zh花庄}}Dual-islandUnderground28 December 2019
zh环球度假区}}Dual-islandUndergrounddate=2021-08-25title=定了!北京环球度假区各交通站口明天同步开通url=http://www.nbd.com.cn/articles/2021-08-25/1888609.htmlarchive-url=https://archive.today/20210825101845/http://www.nbd.com.cn/articles/2021-08-25/1888609.htmlarchive-date=2021-08-25}}

Line 2

Main article: Line 2 (Beijing Subway)

Chegongzhuang station platform
Hepingmen station platform
CodeStationChinese nameLocationTransfersPlatform typeGradeOpened
— ↑ towards ↑ —
201zh西直门}}Xicheng
Beijing NorthIslandUnderground20 September 1984
202zh车公庄}}IslandUnderground
203zh阜成门}}IslandUnderground
204zh复兴门}}
(Out-of-system interchange via )IslandUnderground
205zh长椿街}}IslandUnderground15 January 1971
206zh宣武门}}IslandUnderground
207zh和平门}}IslandUnderground
208zh前门}}DongchengIslandUnderground
209zh崇文门}}IslandUnderground
210zh北京站}}
BeijingIslandUnderground
211zh建国门}}Dongcheng/ChaoyangIslandUnderground20 September 1984
212zh朝阳门}}IslandUnderground
213zh东四十条}}DongchengIslandUnderground
214zh东直门}}IslandUnderground
215zh雍和宫}}IslandUnderground
216zh安定门}}IslandUnderground
217zh鼓楼大街}}Dongcheng/XichengIslandUnderground
218zh积水潭}}XichengIslandUnderground
— ↓ towards ↓ —

Line 3

Main article: Line 3 (Beijing Subway)

StationChinese nameLocationTransfersPlatform typeGradeOpened
zh-hans东四十条}}DongchengUnderground15 December 2024
zh-hans工人体育场}}ChaoyangUnderground
zh-hans团结湖}}Underground
zh-hans朝阳公园}}Underground
zh石佛营}}Underground
zh-hans朝阳站}}{{nowrapIFPUnderground
zh-hans姚家园}}Underground
zh-hans东坝南}}Underground
zh-hans东坝}}Underground
zh-hans东坝北}}Underground

Line 4 and Daxing Line

Main article: Line 4 (Beijing Subway), Daxing line

Through services operate on Line 4 and Daxing Line.

Beigongmen station platform
Majiapu station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh-hans安河桥北}}HaidianSide/island hybridAt-grade28 September 2009
zh-hans北宫门}}IslandUnderground
zh西苑}}IslandUnderground
zh-hans圆明园}}IslandUnderground
zh-hans北京大学东门}}IslandUnderground
zh-hans中关村}}IslandUnderground
zh-hans海淀黄庄}}IslandUnderground
zh-hans人民大学}}IslandUnderground
zh魏公村}}IslandUnderground
zh-hans国家图书馆}}Dual-islandUnderground
zh-hans动物园}}IslandUnderground
zh-hans西直门}}Xicheng
Beijing NorthIslandUnderground
zh新街口}}IslandUnderground
zh平安里}}IslandUnderground
zh西四}}IslandUnderground
zh-hans灵境胡同}}IslandUnderground
zh-hans西单}}IslandUnderground
zh-hans宣武门}}IslandUnderground
zh菜市口}}IslandUnderground
zh陶然亭}}IslandUnderground
zh北京南站}}Fengtai
Beijing SouthIslandUnderground
zh-hans马家堡}}IslandUnderground
zh-hans角门西}}IslandUnderground
zh-hans公益西桥}}Dual-islandUnderground
zh新宫}}Dual-islandUnderground30 December 2010
zh西红门}}DaxingSideElevated
zh高米店北}}IslandUnderground
zh高米店南}}IslandUnderground
zh枣园}}IslandUnderground
zh清源路}}IslandUnderground
zh黄村西大街}}IslandUnderground
zh黄村火车站}}Huangcun
Beijing DaxingIslandUnderground
zh义和庄}}IslandUnderground
zh生物医药基地}}IslandUnderground
zh天宫院}}IslandUnderground

Line 5

Main article: Line 5 (Beijing Subway)

Puhuangyu station platform
Liushuiqiaonan station southbound platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh-hans宋家庄}}FengtaiSideUnderground7 October 2007
zh-hans刘家窑}}IslandUnderground
zh-hans蒲黄榆}}IslandUnderground
zh-hans天坛东门}}DongchengIslandUnderground
zh磁器口}}IslandUnderground
zh-hans崇文门}}IslandUnderground
zh-hans东单}}IslandUnderground
zh-hans灯市口}}IslandUnderground
zh-hans东四}}IslandUnderground
zh-hans张自忠路}}IslandUnderground
zh-hans北新桥}}IslandUnderground
zh-hans雍和宫}}IslandUnderground
zh和平里北街}}IslandUnderground
zh-hans和平西桥}}ChaoyangIslandUnderground
zh惠新西街南口}}IslandUnderground
zh惠新西街北口}}SideUnderground
zh-hans大屯路东}}SideElevated
zh北苑路北}}SideElevated
zh-hans立水桥南}}SideElevated
zh-hans立水桥}}SideAt-grade
zh天通苑南}}ChangpingSideElevated
zh天通苑}}SideElevated
zh天通苑北}}SideElevated

Line 6

Main article: Line 6 (Beijing Subway)

Xihuangcun station platform
Erligou station eastbound platform
Chegongzhuangxi station platform
Beiyunhexi station platform
Beiyunhedong station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh金安桥}}ShijingshanIslandUndergroundtitle=两条地铁新线开通试运营url=http://www.bj.xinhuanet.com/bjyw/2018-12/30/c_1123927578.htmaccess-date=2020-09-17agency=Xinhuanetdate=2018-12-30archive-url=https://web.archive.org/web/20181230043251/http://www.bj.xinhuanet.com/bjyw/2018-12/30/c_1123927578.htmarchive-date=30 December 2018language=zhurl-status=live }}
zh苹果园}}IslandUndergroundurl=http://zdb.beijing.gov.cn/bjzdxmb/gdjt/201911/6db0f37e23274aa8bff5326326f05923.shtmldate=2019-11-20title=市重大项目办到苹果园交通枢纽现场办公}}
zh杨庄}}IslandUnderground30 December 2018
zh西黄村}}IslandUnderground
zh廖公庄}}HaidianIslandUnderground
zh田村}}IslandUnderground
zh海淀五路居}}IslandUnderground30 December 2012
zh慈寿寺}}IslandUnderground
zh花园桥}}IslandUnderground
zh白石桥南}}IslandUnderground
zh二里沟}}Haidian/XichengSideUndergroundurl=https://bj.bjd.com.cn/5b165687a010550e5ddc0e6a/contentShare/5b16573ae4b02a9fe2d558f9/AP64143067e4b03a6b6edd46d4.htmltitle=明天首班车起地铁二里沟站开通,6号线与16号线可双向换乘date=2023-03-17}}
zh车公庄西}}XichengSplitUnderground30 December 2012
zh车公庄}}SplitUnderground
zh平安里}}IslandUnderground
zh北海北}}IslandUnderground
zh南锣鼓巷}}DongchengSplitUnderground
zh东四}}IslandUnderground
zh朝阳门}}Dongcheng/ChaoyangIslandUnderground
zh东大桥}}ChaoyangIslandUnderground
zh呼家楼}}SideUnderground
zh金台路}}IslandUnderground
zh十里堡}}IslandUnderground
zh青年路}}IslandUnderground
zh褡裢坡}}IslandUnderground
zh黄渠}}IslandUnderground
zh常营}}Dual-IslandUnderground
zh草房}}IslandUnderground
zh物资学院路}}TongzhouIslandUnderground28 December 2014
zh通州北关}}IslandUnderground
**zh通运门}}Dual-IslandUndergroundNot open
zh北运河西}}IslandUnderground28 December 2014
zh北运河东}}IslandUndergroundtitle=北京这四座地铁站"暂缓开通"已多年,今年年底终于要开啦!url=https://new.qq.com/omn/20181219/20181219A0G1EW.html?pcwebsite=qqaccess-date=2020-09-17language=zh}}
zh郝家府}}IslandUnderground28 December 2014
zh东夏园}}IslandUnderground
zh潞城}}IslandUnderground

Line 7

Main article: Line 7 (Beijing Subway)

Huagong station platform
Heizhuanghu station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh北京西站}}Fengtai
Beijing WestDual-IslandUnderground28 December 2014
zh湾子}}XichengSideUnderground
zh达官营}}IslandUnderground
zh广安门内}}(Out-of-system interchange via )IslandUnderground
zh菜市口}}IslandUnderground
zh虎坊桥}}IslandUnderground
zh珠市口}}Dongcheng/XichengIslandUnderground
zh桥湾}}DongchengIslandUnderground
zh磁器口}}IslandUnderground
zh广渠门内}}IslandUnderground
zh广渠门外}}Dongcheng/ChaoyangIslandUnderground
zh双井}}ChaoyangIslandUndergroundtitle=7号线东延八通线南延本周六开通试运营url=http://bjwb.bjd.com.cn/html/2019-12/25/content_12438029.htmaccess-date=2020-09-17agency=Beijing Evening Newsdate=2019-12-25archive-url=https://web.archive.org/web/20191225161944/http://bjwb.bjd.com.cn/html/2019-12/25/content_12438029.htmarchive-date=25 December 2019language=zhurl-status=live }}
zh九龙山}}IslandUnderground28 December 2014
zh大郊亭}}IslandUnderground
zh百子湾}}IslandUnderground
zh化工}}IslandUnderground
zh南楼梓庄}}IslandUnderground
zh欢乐谷景区}}IslandUnderground
zh垡头}}IslandUnderground30 December 2018
zh双合}}Dual-IslandUnderground28 December 2014
zh焦化厂}}SideUnderground
zh黄厂}}IslandUnderground28 December 2019
zh郎辛庄}}IslandUnderground
zh黑庄户}}IslandUnderground
zh万盛西}}TongzhouIslandUnderground
zh万盛东}}IslandUnderground
zh群芳}}IslandUnderground
zh高楼金}}Dual-IslandUnderground
zh花庄}}Dual-IslandUnderground
zh环球度假区}}Dual-IslandUnderground26 August 2021

Line 8

Main article: Line 8 (Beijing Subway)

Pingxifu station southbound platform
Olympic Sports Center station platform
Anhuaqiao station platform
Muxiyuan station platform
Yinghai station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh朱辛庄}}ChangpingCross-platformElevated28 December 2013
zh育知路}}SideUnderground
zh平西府}}SideUnderground
zh回龙观东大街}}IslandUnderground31 December 2011
zh霍营}}
HuangtudianIslandUnderground
zh育新}}Changping/HaidianIslandUnderground
zh西小口}}HaidianIslandUnderground
zh永泰庄}}IslandUnderground
zh林萃桥}}ChaoyangIslandUnderground
zh森林公园南门}}IslandUnderground19 July 2008
zh奥林匹克公园}}IslandUnderground
zh奥体中心}}IslandUnderground10 October 2008
zh北土城}}IslandUnderground19 July 2008
zh安华桥}}Xicheng/ChaoyangIslandUnderground30 December 2012
zh安德里北街}}DongchengIslandUndergroundtitle=两条地铁线今日试运营url=http://bjrb.bjd.com.cn/html/2015-12/26/content_340398.htmwebsite=Beijing Dailyaccess-date=2020-09-17archive-url=https://web.archive.org/web/20151227013727/http://bjrb.bjd.com.cn/html/2015-12/26/content_340398.htmarchive-date=2015-12-27language=zhurl-status=dead}}
zh鼓楼大街}}Dongcheng/XichengIslandUnderground30 December 2012
zh什刹海}}IslandUnderground28 December 2013
zh南锣鼓巷}}DongchengSplit (Cross-platform)Underground
zh中国美术馆}}SplitUnderground30 December 2018
Jinyu Hutongzh金鱼胡同}}IslandUnderground31 December 2021
Wangfujingzh王府井}}IslandUnderground
Qianmenzh前门}}IslandUnderground
zh珠市口}}Dongcheng/XichengIslandUnderground30 December 2018
zh天桥}}IslandUnderground
zh永定门外}}DongchengIslandUnderground
zh木樨园}}IslandUnderground
zh海户屯}}FengtaiIslandUnderground
**zh大红门}}IslandUndergroundNot open
zh大红门南}}IslandUnderground30 December 2018
zh和义}}IslandUnderground
zh东高地}}IslandUnderground
zh火箭万源}}IslandUnderground
zh五福堂}}DaxingIslandUnderground
zh德茂}}IslandElevated
zh瀛海}}IslandElevated

Line 9

Main article: Line 9 (Beijing Subway)

Fengtai Science Park station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh国家图书馆}}HaidianDual-IslandUnderground30 December 2012
zh白石桥南}}IslandUnderground
zh白堆子}}IslandUnderground
zh军事博物馆}}IslandUnderground21 December 2013
zh北京西站}}Xicheng
Beijing WestDual-IslandUnderground31 December 2011
zh六里桥东}}FengtaiIslandUnderground
zh六里桥}}SideUnderground
zh七里庄}}IslandUnderground
zh丰台东大街}}IslandUnderground12 October 2012
zh丰台南路}}IslandUnderground31 December 2011
zh科怡路}}IslandUnderground
zh丰台科技园}}IslandUnderground
zh郭公庄}}Dual-IslandUnderground

Line 10

Main article: Line 10 (Beijing Subway)

Suzhou Jie station clockwise platform
Capital Univ. of Economics & Business station platform
Niwa station platform
Gongzhufen station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
— ↑ loop line – towards ↑ —
zh巴沟}}HaidianDual-islandUnderground19 July 2008
zh苏州街}}SideUnderground
zh海淀黄庄}}SideUnderground
zh知春里}}IslandUnderground
zh知春路}}SplitUnderground
zh西土城}}IslandUnderground
zh牡丹园}}IslandUnderground
zh健德门}}Haidian/ChaoyangIslandUnderground
zh北土城}}ChaoyangIslandUnderground
zh安贞门}}Side/island hybridUnderground
zh惠新西街南口}}SideUnderground
zh芍药居}}IslandUnderground
zh太阳宫}}IslandUnderground
zh三元桥}}IslandUnderground
zh亮马桥}}IslandUnderground
zh农业展览馆}}IslandUnderground
zh团结湖}}SplitUnderground
zh呼家楼}}SplitUnderground
zh金台夕照}}SplitUnderground
zh国贸}}SplitUnderground
zh双井}}IslandUnderground
zh劲松}}IslandUnderground
zh潘家园}}IslandUnderground30 December 2012
zh十里河}}IslandUnderground
zh分钟寺}}FengtaiIslandUnderground
zh成寿寺}}IslandUnderground
zh宋家庄}}Dual-IslandUnderground
zh石榴庄}}IslandUnderground
zh大红门}}IslandUnderground
zh角门东}}IslandUndergroundtitle=北京第二条地铁环线10号线5月5日日正式贯通运营url=http://news.163.com/13/0504/16/8U1UJMAF00014JB5.htmlaccess-date=2020-09-17agency=Neteaselanguage=zh}}
zh角门西}}IslandUnderground30 December 2012
zh草桥}}IslandUnderground
zh纪家庙}}IslandUnderground
zh首经贸}}IslandUnderground
zh丰台站}}
Beijing FengtaiIslandUnderground5 May 2013
zh泥洼}}IslandUnderground
zh西局}}IslandUnderground30 December 2012
zh六里桥}}IslandUnderground
zh莲花桥}}HaidianIslandUnderground
zh公主坟}}SplitUnderground
zh西钓鱼台}}IslandUnderground
zh慈寿寺}}IslandUnderground
zh车道沟}}IslandUnderground
zh长春桥}}IslandUnderground
zh火器营}}IslandUnderground
— ↓ loop line – towards ↓ —

Line 11

Main article: Line 11 (Beijing Subway)

Xinshougang (Shougang Park) station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh模式口}}ShijingshanSideUndergroundtitle=三段地铁线12月30日开通试运营 北京城市轨道交通运营里程跃居全国第一_信息提示_首都之窗_北京市人民政府门户网站url=https://www.beijing.gov.cn/fuwu/bmfw/sy/jrts/202312/t20231230_3521334.htmlaccess-date=2023-12-31website=www.beijing.gov.cn}}
zh金安桥}}IslandUnderground31 December 2021
zh北辛安}}IslandUnderground
zh新首钢}}IslandUnderground

Line 12

Main article: Line 12 (Beijing Subway)

StationChinese nameLocationTransfersPlatform typeGradeOpened
zh四季青桥}}HaidianIslandUnderground15 December 2024
zh蓝靛厂}}IslandUnderground
zh长春桥}}IslandUnderground
zh苏州桥}}IslandUnderground
zh人民大学}}Split IslandUnderground
zh大钟寺}}Split IslandUnderground
zh蓟门桥}}IslandUnderground
zh北太平庄}}Haidian/XichengIslandUnderground
zh马甸桥}}XichengIslandUnderground
zh安华桥}}Xicheng/ChaoyangIslandUnderground
zh安贞桥}}Chaoyang/DongchengSplit IslandUnderground
zh和平西桥}}ChaoyangSplit IslandUnderground
zh光熙门}}IslandUnderground
zh西坝河}}IslandUnderground
zh三元桥}}IslandUnderground
zh将台西}}IslandUnderground
zh高家园}}IslandUnderground
zh驼房营}}IslandUnderground
zh东坝西}}IslandUnderground
zh东坝北}}IslandUnderground

Line 13

Main article: Line 13 (Beijing Subway)

Dazhongsi station southbound platform
Qinghe railway station platform
Beiyuan station eastbound platform
CodeStationChinese nameLocationTransfersPlatform typeGradeOpened
1301zh西直门}}Xicheng
Spanish solutionElevated28 September 2002
1302zh大钟寺}}HaidianSideElevated
1303zh知春路}}SideAt-grade
1304zh五道口}}SideElevated
1305zh上地}}SideAt-grade
zh清河站}}
IslandAt-grade30 December 2019
1306zh西二旗}}SideAt-grade25 December 2010 (new station)
28 September 2002 (old station)
1307zh龙泽}}ChangpingSideElevated28 September 2002
1308zh回龙观}}SideAt-grade
1309zh霍营}}
SideAt-grade
1310zh立水桥}}ChaoyangSideElevated9 January 2003
1311zh北苑}}SideAt-grade
1312zh望京西}}SideAt-grade
1313zh芍药居}}SideAt-grade
1314zh光熙门}}SideAt-grade
1315zh柳芳}}SideAt-grade
1316zh东直门}}DongchengSideUnderground

Line 14

Main article: Line 14 (Beijing Subway)

Zhangguozhuang station platform
Jingtai station platform
Jiangtai station southbound platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh张郭庄}}FengtaiSideElevated5 May 2013
zh园博园}}SideElevated
zh大瓦窑}}IslandUnderground
zh郭庄子}}IslandUnderground
zh大井}}IslandUnderground
zh七里庄}}SplitUnderground15 February 2014
Xijuzh西局}}IslandUnderground5 May 2013
Dongguantouzh东管头}}IslandUnderground31 December 2021
Lize Shangwuquzh丽泽商务区}}IslandUnderground
Caihuyingzh菜户营}}IslandUnderground
Xitieyingzh西铁营}}IslandUnderground
Jingfengmenzh景风门}}IslandUnderground
zh北京南站}}
Beijing SouthIslandUnderground26 December 2015
**zh陶然桥}}DongchengIslandUndergroundNot open
zh永定门外}}IslandUnderground26 December 2015
zh景泰}}IslandUnderground
zh蒲黄榆}}FengtaiIslandUnderground
zh方庄}}IslandUnderground
zh十里河}}ChaoyangIslandUnderground
zh北工大西门}}IslandUnderground
zh平乐园}}IslandUndergroundtitle=京港地铁16号线农大南路站、14号线平乐园站 将于12月30日正式开通url=http://www.mtr.bj.cn/content/details34_25536.htmlwebsite=Beijing MTR Corporation Limitedaccess-date=2020-09-17archive-url=https://web.archive.org/web/20181203152117/http://www.mtr.bj.cn/content/details34_25536.htmlarchive-date=3 December 2018language=zhurl-status=dead }}
zh九龙山}}IslandUnderground26 December 2015
zh大望路}}IslandUnderground
**zh红庙}}SideUndergroundNot open
zh金台路}}IslandUnderground28 December 2014
zh朝阳公园}}IslandUndergroundtitle=16号线北段9站 14号线朝阳公园站 15号线望京东站今日开通url=http://bj.people.com.cn/n2/2016/1231/c82840-29538974.htmlwebsite=people.cnaccess-date=2020-09-17language=zh}}
zh枣营}}IslandUnderground28 December 2014
zh东风北桥}}IslandUnderground
zh将台}}SideUnderground
**zh高家园}}SideUndergroundNot open
zh望京南}}SideUnderground28 December 2014
zh阜通}}IslandUnderground
zh望京}}IslandUnderground
zh东湖渠}}IslandUnderground
zh来广营}}IslandUnderground
zh善各庄}}IslandUnderground

Line 15

Main article: Line 15 (Beijing Subway)

Liudaokou station platform
Sunhe station platform
Shunyi station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh清华东路西口}}HaidianSideUnderground28 December 2014
zh六道口}}IslandUnderground
zh北沙滩}}IslandUnderground
zh奥林匹克公园}}ChaoyangIslandUnderground
zh安立路}}IslandUnderground
zh大屯路东}}IslandUnderground26 December 2015
zh关庄}}IslandUnderground28 December 2014
zh望京西}}IslandUnderground30 December 2010
zh望京}}IslandUnderground
zh望京东}}IslandUnderground31 December 2016
zh崔各庄}}IslandUnderground30 December 2010
zh马泉营}}Dual-islandUnderground
zh孙河}}IslandElevated
zh国展}}ShunyiIslandElevated
zh花梨坎}}IslandElevated
zh后沙峪}}IslandElevated
zh南法信}}IslandHalf Underground31 December 2011
zh石门}}IslandUnderground
zh顺义}}IslandUnderground
zh俸伯}}IslandUnderground

Line 16

Main article: Line 16 (Beijing Subway)

Tundian station platform
Suzhouqiao station platform
Erligou station southbound platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh北安河}}HaidianIslandUnderground31 December 2016
zh温阳路}}IslandUnderground
zh稻香湖路}}IslandUnderground
zh屯佃}}IslandUnderground
zh永丰}}IslandUnderground
zh永丰南}}IslandUnderground
zh西北旺}}IslandUnderground
zh马连洼}}IslandUnderground
zh农大南路}}IslandUnderground30 December 2017
zh西苑}}IslandUnderground31 December 2016
zh万泉河桥}}IslandUndergroundtitle=明日起,地铁房山线北延、16号线中段和有轨电车T1线开通试运营!url=https://news.bjd.com.cn/2020/12/30/39529t100.htmlwebsite=news.bjd.com.cnaccess-date=2020-12-30language=zh}}
zh苏州街}}IslandUnderground30 December 2023
zh苏州桥}}SideUnderground31 December 2020
zh万寿寺}}IslandUnderground
zh国家图书馆}}IslandUnderground
zh二里沟}}Haidian/XichengSideUnderground18 March 2023
zh甘家口}}IslandUnderground31 December 2020
zh玉渊潭东门}}IslandUnderground31 December 2021
zh木樨地}}Haidian(out-of-system interchange)IslandUnderground31 December 2022
zh达官营}}XichengIslandUnderground
zh红莲南路}}IslandUnderground
zh丽泽商务区}}FengtaiIslandUnderground19 January 2025
zh东管头南}}IslandUnderground31 December 2022
zh丰台站}}
Beijing FengtaiIslandUnderground
zh丰台南路}}IslandUnderground
zh富丰桥}}IslandUnderground
zh看丹}}IslandUnderground
zh榆树庄}}SideUnderground
zh洪泰庄}}IslandUnderground30 December 2023
zh宛平城}}IslandUnderground

Line 17

Main article: Line 17 (Beijing Subway)

Shilihe station platform
StationChinese nameLocationTransfersPlatform typeGradeOpenedNorth sectionSouth section
Future Science City Northzh未来科学城北}}ChangpingIslandUnderground30 December 2023
Future Science Cityzh未来科学城}}IslandUnderground
Tiantongyuandongzh天通苑东}}Dual-islandUnderground
Qingheyingzh清河营}}ChaoyangIslandUnderground
Hongjunyingzh红军营}}IslandUnderground
*Wangjingxi*zh望京西}}IslandUndergroundNot open
Taiyanggongzh太阳宫}}IslandUnderground30 December 2023
Xibahezh西坝河}}IslandUnderground
Zuojiazhuangzh左家庄}}IslandUnderground
Workers' Stadiumzh工人体育场}}IslandUnderground
ChaoyangIslandUnderground31 December 2021
IslandUnderground
Dual-islandUnderground
TongzhouIslandUnderground
IslandUnderground
IslandUnderground
IslandUnderground

Line 19

Main article: Line 19 (Beijing Subway)

Ping'anli station platform
Niujie station platform
Xingong station northbound platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
HaidianIslandUndergroundurl=https://ie.bjd.com.cn/5b165687a010550e5ddc0e6a/contentApp/5b16573ae4b02a9fe2d558f9/AP61cbc733e4b0b9f572ba68c7.htmltitle=大站快车!地铁19号线初期开通6站,从南到北仅需24分钟quote=此次开通初期运营共6座车站,自南向北为新宫站、新发地站、草桥站、牛街站、积水潭站、牡丹园站date=2021-12-29website=北京日报access-date=2021-12-29archive-date=2022-03-25archive-url=https://web.archive.org/web/20220325035307/https://ie.bjd.com.cn/5b165687a010550e5ddc0e6a/contentApp/5b16573ae4b02a9fe2d558f9/AP61cbc733e4b0b9f572ba68c7.html}}
Haidian/XichengIslandUndergroundurl=http://ie.bjd.com.cn/5b5fb98da0109f010fce6047/contentShare/5b5fb9d0e4b08630d8aef954/AP62e3538ce4b0f805269311af.htmltitle=地铁19号线剩余4站明日试运营!新宫至牡丹园只需半小时date=2022-07-29archive-url=https://web.archive.org/web/20220729045111/http://ie.bjd.com.cn/5b5fb98da0109f010fce6047/contentShare/5b5fb9d0e4b08630d8aef954/AP62e3538ce4b0f805269311af.htmlarchive-date=2022-07-29}}
XichengIslandUnderground31 December 2021
IslandUnderground30 July 2022
(Out-of-system interchange via )IslandUnderground
(Out-of-system interchange via )IslandUnderground31 December 2021
FengtaiIslandUnderground30 July 2022
IslandUnderground31 December 2021
IslandUnderground
Dual-islandUnderground

Changping Line

Main article: Changping line

Ming Tombs station platform
Shahe station platform
Qinghe Xiaoyingqiao station southbound platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh昌平西山口}}ChangpingIslandUnderground26 December 2015
zh十三陵景区}}IslandUnderground
zh昌平}}IslandUnderground
zh昌平东关}}IslandUnderground
zh北邵洼}}IslandUnderground
zh南邵}}IslandUnderground30 December 2010
zh沙河高教园}}IslandElevated
zh沙河}}IslandElevated
zh巩华城}}IslandElevated
zh朱辛庄}}Cross-platformElevated
zh生命科学园}}IslandElevated
zh西二旗}}HaidianSideElevated
zh清河站}}
IslandUnderground31 December 2021
zh朱房北}}IslandUnderground15 December 2024
zh清河小营桥}}Cross-platformUnderground4 February 2023
zh学知园}}IslandUnderground
zh六道口}}IslandUnderground
zh学院桥}}IslandUnderground
zh西土城}}IslandUnderground
zh蓟门桥}}IslandUnderground15 December 2024

Fangshan Line

Main article: Fangshan line

Baipenyao station platform
Dabaotai station platform
Guangyangcheng station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh东管头南}}FengtaiIslandUnderground31 December 2020
zh首经贸}}IslandUnderground
zh花乡东桥}}IslandUnderground
zh白盆窑}}SideUnderground
zh郭公庄}}Dual-IslandUnderground31 December 2011
zh大葆台}}SideHalf Underground30 December 2010
zh稻田}}FangshanIslandElevated
zh长阳}}IslandElevated
zh篱笆房}}IslandElevated
zh广阳城}}IslandElevated
zh良乡大学城北}}IslandElevated
zh良乡大学城}}IslandElevated
zh良乡大学城西}}IslandElevated
zh良乡南关}}SideElevated
zh苏庄}}SideElevated
zh阎村东}}Dual-islandElevatedtitle=三条地铁新线12月30日开通 公交优化调整接驳新地铁url=https://beijing.qianlong.com/2017/1228/2285132.shtmlwebsite=qianlong.comaccess-date=2020-09-17language=zh}}

Line S1

Main article: Line S1 (Beijing Subway)

Qiaohuying station eastbound platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh石厂}}MentougouSideElevated30 December 2017
zh小园}}SideElevated
zh栗园庄}}SideElevated
zh上岸}}SideElevated
zh桥户营}}SideElevated
zh四道桥}}SideElevated
zh金安桥}}ShijingshanSideElevated
zh苹果园}}SideElevated31 December 2021

Xijiao Line

Main article: Xijiao line

Xiangshan station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh巴沟}}HaidianSingle-sidedAt-grade30 December 2017
zh颐和园西门}}SideAt-grade
zh茶棚}}SideAt-grade
zh万安}}SideAt-grade
zh植物园}}SideAt-grade
zh香山}}Single-sidedAt-grade

Yanfang Line

Main article: Yanfang line

Dashihedong station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh阎村东}}FangshanDual-islandElevated30 December 2017
zh紫草坞}}IslandElevated
zh阎村}}IslandElevated
zh星城}}IslandElevated
zh大石河东}}SideElevated
zh马各庄}}IslandElevated
zh饶乐府}}Side/island hybridElevated
zh房山城关}}IslandElevated
zh燕山}}IslandElevated

Yizhuang Line

Main article: Yizhuang line

Wanyuan Jie station northbound platform
Ciqu station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh宋家庄}}FengtaiSpanish solutionUnderground30 December 2010
zh肖村}}ChaoyangIslandUnderground
zh小红门}}IslandUnderground
zh旧宫}}DaxingSideElevated
zh亦庄桥}}SideElevated
zh亦庄文化园}}SideElevated
zh万源街}}SideElevated
zh荣京东街}}SideElevated
zh荣昌东街}}SideElevated
zh同济南路}}TongzhouSide/island hybridElevated
zh经海路}}SideElevated
zh次渠南}}IslandUnderground
zh次渠}}IslandUnderground
zh亦庄火车站}}IslandUnderground30 December 2018

Yizhuang T1 Line

Main article: Line T1 (Beijing Yizhuang Tram)

Beijing Etrong International Exhibition & Convention Center station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
Laoguanlizh老观里}}DaxingIslandAt-gradeNot open
Quzhuangzh屈庄}}SideAt-grade31 December 2020
Rongxing Jiezh融兴街}}SideAt-grade
Rhihezhuangzh瑞合庄}}SideAt-grade
Taiheqiaobeizh太和桥北}}IslandAt-grade
Sihaizhuangzh四海庄}}IslandAt-grade
Jiuhaocunzh九号村}}IslandAt-grade
Taihe Luzh泰河路}}IslandAt-grade
Lujuandongzh鹿圈东}}IslandAt-grade
Yizhuang Tongrenzh亦庄同仁}}IslandAt-grade
zh荣昌东街}}IslandAt-grade
Beijing Etrong International Exhibition & Convention Centerzh亦创会展中心}}IslandAt-grade
Jinghai Yiluzh经海一路}}TongzhouSideAt-grade
Dinghaiyuanxizh定海园西}}SideAt-grade
Dinghaiyuanzh定海园}}SideAt-grade

Capital Airport Express

Main article: Capital Airport Express

Terminal 3 station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
Beixinqiao北新橋DongchengSideUnderground31 December 2021
zh-hans东直门}}SideUnderground19 July 2008
zh-hans三元桥}}ChaoyangIslandUnderground
zh-hans3号航站楼}}ShunyiPEK Terminal 3Spanish solutionElevated
zh-hans2号航站楼}}ChaoyangPEK Terminals 1 & 2Single-sidedUnderground

Daxing Airport Express

Main article: Daxing Airport Express

Daxing Xincheng station platform
StationChinese nameLocationTransfersPlatform typeGradeOpened
zh-hans草桥}}FengtaiSideUnderground26 September 2019
zh-hans大兴新城}}DaxingIslandUnderground
zh-hans大兴机场}}Guangyang (Langfang, Hebei Province )PKX
Daxing AirportSideUnderground

Notes

References

References

  1. "地铁公司1971 -- 1980年".
  2. "地铁公司1981 -- 1990年地铁大事记".
  3. "地铁公司1991 -- 2000年大事记".
  4. (2021-08-25). "定了!北京环球度假区各交通站口明天同步开通".
  5. 孙宏阳; 李博. (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通". [[Beijing Daily]].
  6. "北京地铁4号线9月28日开通".
  7. "北京地铁五号线开通试运营".
  8. (2018-12-30). "两条地铁新线开通试运营".
  9. (2019-11-20). "市重大项目办到苹果园交通枢纽现场办公".
  10. "轨道交通四条新线12月30日开通试运营".
  11. (2023-03-17). "明天首班车起地铁二里沟站开通,6号线与16号线可双向换乘".
  12. "北京四条新地铁线路开通 7号线担纲南城交通分流重任".
  13. "北京这四座地铁站"暂缓开通"已多年,今年年底终于要开啦!".
  14. (2019-12-25). "7号线东延八通线南延本周六开通试运营".
  15. "京地铁8号线南北新线周六开通 中国美术馆站暂缓开通".
  16. "Beijing launches three new subway sections".
  17. "北京地铁奥运支线暂不向普通市民开放".
  18. "奥运支线只要购票刷卡就能坐 奥体中心站首揭面纱(组图)".
  19. "两条地铁线今日试运营".
  20. (2021-09-16). link
  21. "北京地铁1号线今起可换乘9号线(图)".
  22. "9号线丰台东大街站将于明天(10月12日)正式启用".
  23. "北京第二条地铁环线10号线5月5日日正式贯通运营".
  24. "三段地铁线12月30日开通试运营 北京城市轨道交通运营里程跃居全国第一_信息提示_首都之窗_北京市人民政府门户网站".
  25. (2021-01-08). "北京地铁11号线西段等轨道新线2021年开通".
  26. (14 December 2021). "两条地铁新段年底开通,京西轨道交通动脉即将正式打通".
  27. 孙宏阳; 李博. (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通". [[Beijing Daily]].
  28. "地铁公司2001 -- 2004年大事记".
  29. "北京地铁13号线清河站12月30日开门迎客".
  30. "北京13号线西二旗车站停用 新站周六启用".
  31. (2014-02-13). "北京地铁14号线七里庄站将于2月15日正式启用".
  32. "地铁14号线剩余段、17号线南段、11号线西段进入空载试运行".
  33. "京港地铁16号线农大南路站、14号线平乐园站 将于12月30日正式开通".
  34. "16号线北段9站 14号线朝阳公园站 15号线望京东站今日开通".
  35. "本市5条轨道交通线9月完工".
  36. "明日起,地铁房山线北延、16号线中段和有轨电车T1线开通试运营!".
  37. (2021-12-01). "樱花“开”进车站,地铁16号线玉渊潭东门站年底开通".
  38. (2022-12-30). "北京地铁16号线南段明日开通并与北段、中段贯通".
  39. 孙宏阳. (2025-01-18). "地铁16号线丽泽商务区站明日开通!首末车时间公布". [[Beijing Daily]].
  40. (2021-12-31). "北京今日开通9条地铁线(段) 3条主干线贯通南北".
  41. (2021-11-09). "地名公告>嘉会湖站".
  42. (2021-12-29). "大站快车!地铁19号线初期开通6站,从南到北仅需24分钟".
  43. (2022-07-29). "地铁19号线剩余4站明日试运营!新宫至牡丹园只需半小时".
  44. (2022-08-01). "地铁开通“虚拟换乘”之后,乘客的地面换乘体验如何?记者进行实地探访".
  45. 孙宏阳; 李博. (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通". [[Beijing Daily]].
  46. (2023-02-02). "2月4日首班车起昌平线南延一期开通试运营".
  47. 孙宏阳; 李博. (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通". [[Beijing Daily]].
  48. "三条地铁新线12月30日开通 公交优化调整接驳新地铁".
  49. (2019-09-25). "地铁大兴机场线明起运营,6条机场大巴线路同步开通".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about List of Beijing Subway stations — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report