Skip to content
Surf Wiki
Save to docs
geography/spain

From Surf Wiki (app.surf) — the open knowledge base

Line 7 (Madrid Metro)

Rapid transit line of the Madrid Metro


Rapid transit line of the Madrid Metro

FieldValue
nameLine 7
native_nameLínea 7
native_name_langes
color
logo_width100px
imageIslas Filipinas platform.JPG
image_altPlatforms at Islas Filipinas station
captionPlatforms at Islas Filipinas station
typeRapid transit
systemMadrid Metro
localeMadrid
start
end
stations31
planopen
open
yearcommenced
yearcompleted
close
ownerCRTM
operatorCRTM
characterUnderground
stockAnsaldoBreda 9000
linelength_km32.919
gauge
website
map
map_statecollapsed

| speed_km/h = Line 7 of the Madrid Metro is a rapid transit line that originally opened on 17 July 1974. It runs between and .

History

The line has been extended multiple times. It initially ran between and . On 17 May 1975, the line was extended from Pueblo Nuevo to , and was not extended for many years. This was a problem as line 7 was very underused. The problem was solved in 1998 and 1999 when an extension to was opened in four stages. The first stage was between Avenida de América and , opening on 1 April 1998, followed by Gregorio Marañón to . The next section to open extended the line to , and a final section further reached . Pitis, however, was the only station on the Madrid metro to have restricted opening times. At the time, Pitis was a very small village, and the station's main purpose is to provide interchange for Renfe services. Between 1999 and 2018, most trains ran between and , with being served by only a few trains each hour.

Beginning in 2019, all trains are expected to terminate at Pitis following the opening of station, which was previously constructed, but not opened due to the ongoing construction of the surrounding developments. Arroyofresno station was finally opened on 23 March 2019.

On 4 May 2007, Line 7 was extended from Las Musas to the towns of Coslada and San Fernando. At , next to Atlético Madrid's Metropolitano Stadium, passengers have to change trains for MetroEste to Coslada and San Fernando - the so-called Line 7B.

The section of Line 7 between Estadio Metroplitano and , known as MetroEste or Line 7B, has been closed fully or partially several times since its opening in May 2007. San Fernando de Henares, which is close to the Jarama River, sits on a large salt deposit and is geologically composed of poorly suited soils. The drilling of the tunnel used for the extension has aggravated the high amount of groundwater-related subsidence in the area, making the area no longer suitable for new development; the tunnel has experienced repeated flooding and structural corrosion due to the subsidence. By the end of May 2023, the subsidence in San Fernando de Henares had destroyed numerous structures, forcing the relocation of a significant portion of the area's residents. On 24 August 2022, the section of Line 7B east of San Fernando station was closed for what would become a three-year period owing to reconstruction of the line's tunnels and remediation works; the closure would be extended to Barrio del Puerto station in July 2024. The entirety of Line 7B would fully reopen on 22 November 2025.

Rolling stock

Line 7A, the primary portion of the line from Pitis to Estadio Metropolitano, uses 6-car trains of class 9000. Line 7B, the extension to Hospital del Henares, uses 3-car trains of class 9000.

Stations

MunicipalityDistrictStationOpenedZoneConnectionsNotes
Coslada2008B1
MadridSan Fernando de Henares2007B1
2007B1
2007B1
Coslada2007B1
2007B1Cercanías Madrid:
Coslada2007B1
MadridSan Blas-Canillejas2007A
1974A
1974A
1974A
Ciudad Lineal1974A
1974A
1964AMadrid Metro:
1975A
Salamanca1975A
Salamanca / Chamartín1975A
1973AMadrid Metro:
Chamartín / Chamberí1998AMadrid Metro:
Chamberí1998A
1998AMadrid Metro:
1999A
Chamberí /
Moncloa-Aravaca1987AMadrid Metro:
Moncloa-Aravaca1999A
1999A
Moncloa-Aravaca /
Fuencarral-El Pardo1999A
Fuencarral-El Pardo1999A
1999A
1999A
2001A
1999ACercanías Madrid:

References

References

  1. Mateo, Juan José. (24 August 2022). "Cuando el metro para porque hunde casas: más de 860 días con la línea 7B cerrada en Madrid". [[El País]].
  2. Caballero, Fatima. (14 January 2023). "El hundimiento de la línea 7B de Metro: las prisas electorales de Aguirre que han dejado sin casa a decenas de familias". [[El Diario (Spain).
  3. (19 August 2022). "Metro suspende temporalmente el servicio entre las estaciones de San Fernando y Hospital del Henares de la línea 7B desde el miércoles para comenzar los trabajos de reparación de la infraestructura". Metro de Madrid.
  4. Madrid, Comunidad de. (17 November 2025). "La Comunidad de Madrid reabre este sábado la Línea 7B de Metro tras completar las obras de consolidación y reparación".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Line 7 (Madrid Metro) — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report