Skip to content
Surf Wiki
Save to docs
geography/china

From Surf Wiki (app.surf) — the open knowledge base

Line 1 (Hangzhou Metro)

Metro line of the Hangzhou Metro system in China

Line 1 (Hangzhou Metro)

Metro line of the Hangzhou Metro system in China

FieldValue
logo
color
image杭州地铁1号线列车离开乔司站向乔司南驶去IMG 0154.JPG
image_width300px
captionA Line 1 train on the Linping branch (now part of Line 9)
typeRapid transit
systemHangzhou Metro
statusOperational
localeHangzhou, Zhejiang, China
start
end
stations33
routes2
daily_ridership520,000 (2016 Daily Avg.)
1,270,300 (2019-05-01 peak)
open
ownerCity of Hangzhou
operatorHangzhou MTR Corporation Limited
characterUnderground
depotQibao Depot
Xianghu Stabling Yard
Nanyang Stabling Yard
stockPM0G
PM121
PM144
linelength52.21 km
tracks2
gauge
electrificationOverhead line,
speed80 km/h
map
map_statecollapsed

1,270,300 (2019-05-01 peak) Xianghu Stabling Yard Nanyang Stabling Yard PM121 PM144 Line 1 of the Hangzhou Metro () is an arc-shaped rapid transit line running from Xianghu station in western Xiaoshan District to Xiaoshan International Airport in eastern Xiaoshan District, passing through downtown Hangzhou. The line opened on 24 November 2012. It is the oldest in the city's metro network.

The line is 52 km long with 33 stations.

The line is operated by Hangzhou MTR, a consortium consisting of the Hangzhou Metro, which holds a 51% share, and the Hong Kong-based MTR Corporation Ltd., which holds a 49% share. As a result, the voice of Cheri Chan Yu-yan, the announcer of the Hong Kong MTR, can be heard on the English announcements on this line.

Opening timeline

SegmentCommencementLengthStation(s)Name
Xianghu — Wenze Road24 November 201234.82 km24Phase 1
Coach Center — Linping12.5 km6
East Railway Station30 June 2013Infill station1
Wenze Road — Xiashajiangbin24 November 20155.7 km3Phase 2
Xiashajiangbin — Xiaoshan International Airport30 December 202011.2 km5Phase 3

Route description

After the Linping branch of Line 1 became part of Line 9, Line 1 now runs fully underground.

The line begins at Xianghu station in Xiaoshan District, located just north of its namesake lake. Located adjacent to Xianghu station is the Xianghu Stabling Yard, where some of the line's trains are stored and where the metro is headquartered. The line proceeds northwards along Fengqing Avenue, Bin'an Road and Jiangling Road through the central part of Binjiang District. The line then crosses the Qiantang River in a tunnel.

Upon reaching Shangcheng District on the north side of the Qiantang River, the line passes by the Hangzhou Public Security Bureau's headquarters and runs for a short distance along Wujiang Road to Hangzhou Railway Station. It reaches the downtown "U" portion of the line, which is one of the busiest parts of the line, running next the West Lake Scenic Area along Yan'an Road.

The line crosses under the Grand Canal near the Wulinmen Dock and curves eastward towards Hangzhoudong Railway Station. Its respective metro station, East Railway Station, is located underneath the arrivals hall of the station. The line continues to proceed eastward along Jiuhe Road, past the Qibao Depot, another depot on the line located adjacent to Qibao station. At Coach Center station, the Linping branch of the line formerly branched off from the main line towards Linping station, but this branch of the line has since become part of Line 9.

Upon reaching Xiasha Subdistrict, the line runs along Jinsha Avenue and 2nd Street until it reaches South Wenhai Road station, where passengers can transfer to Line 8 to continue to the east end of Qiantang District. The line then curves southwards and runs along 25th Street to Xiashajiangbin Station, the terminus of short-turn trains (roughly every other train).

The line crosses the Qiantang River in a tunnel a second time and returns to Xiaoshan District. It passes through some low-density areas, crosses under one of the runways of Hangzhou Xiaoshan International Airport, and finally terminates at Xiaoshan International Airport station, located among the terminals.

Service routes

First trains departs at:

Xianghu,5:54

Longxiangqiao,6:03

East railway station,6:07

Jiuhe Road,6:00

First trains departs at:

Xiaoshan International Airport,6:00

Xiashajiangbin,5:54

Pengbu,6:00

Fengqi Road,6:07

Stations

Station nameConnectionsDistance
kmLocationEnglishChinese
0.000.00Xiaoshan
1.8841.884Binjiang
1.1263.010
1.4114.421
1.0705.491
3.1028.593Shangcheng
0.9309.523
**HZH**1.28610.809
1.23912.048
1.23013.278
0.91814.196Gongshu
1.06415.260
0.85016.110
1.45217.562
1.56419.126Shangcheng
**HGH**2.20521.331
1.02822.359
1.82724.186
1.36125.547
1.30326.850
1.29328.143
3.24531.388Qiantang
1.27732.665
0.93933.604
1.25634.860
2.68337.543
1.28138.824
1.68440.508
3.74644.254Xiaoshan
1.27845.532
1.35346.885
1.59548.480
3.51651.996
To scale map of Hangzhou Metro Line 1

Rolling stock

StockClassYear builtBuilderNumber builtNumbersFormationDepotsLine assignedNotes
PM0GB2010-2013CSR Nanjing Puzhen288 (48 sets)01 001 - 01 048 (010011-010486)Tc+Mp+M+M+Mp+TcXianghu Yard
Qibao Depot
Nanyang Yard
PM1212017-2019CRRC Nanjing Puzhen144 (24 sets)01 049 - 01 072 (010491-010726)
PM1442020-202148 (8 sets)01 073 - 01 080 (010731-010806)

Notes

References

References

  1. "杭州地铁有两个最新消息要告诉你 1号线要添20多列新车 2号线西北段明年内开通运营 - 杭州新闻中心 - 杭州网".
  2. link. 杭州网. (2015-11-23)
  3. "有什么关于杭州地铁、公交的冷知识? - 知乎".
  4. (2021-07-07). "7月10日起,杭州地铁9号线来了!".
  5. (2021-07-15). "喜讯!众合科技助力杭州地铁9号线临平段改造工程圆满完成".
  6. (2020-12-31). "杭州地铁四段新线齐开 可以坐着地铁去机场了".
  7. "Map of Hangzhou". [[State Bureau of Surveying and Mapping]].
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Line 1 (Hangzhou Metro) — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report