Skip to content
Surf Wiki
Save to docs
sports

From Surf Wiki (app.surf) — the open knowledge base

Ipswich Motorway

Motorway in Queensland, Australia


Motorway in Queensland, Australia

FieldValue
road_nameIpswich Motorway
typemotorway
stateqld
imageIpswich Motorway beginning at Moorooka 2.jpg
captionIpswich Motorway beginning at Moorooka, 2017
length21
direction_aNE
direction_bSW
end_aIpswich Road
Rocklea, Brisbane
end_b{{plainlist
throughOxley, Darra, Wacol, Gailes, Goodna
route{{plainlist
former{{plainlist
exits{{plainlist

Rocklea, Brisbane

  • Warrego Highway
  • Cunningham Highway
  • Riverview, Ipswich
  • M2
  • (Warrego Highway to Logan Motorway)
  • M7
  • (Logan Motorway to Ipswich Road)
  • Metroad 2
  • National Highway 15
  • Logan Motorway
  • Centenary Motorway
  • Granard Road

The Ipswich Motorway (M7) is a major road that connects Brisbane and Ipswich in South East Queensland, Australia. It commences at the junction of Ipswich Road and Granard Road and proceeds through to the M2 Logan Motorway interchange. It is then signed M2 until the junction of the Warrego Highway and the Cunningham Highway.

It initially passes through the suburbs of Rocklea, Oxley and Darra in south west Brisbane before reaching the eastern suburbs of Ipswich such as Redbank Plains, Goodna and Riverview. The Motorway is directly connected to the M5 Centenary Motorway at Darra and the M2 Logan Motorway at Gailes. In 2008, it was estimated that 80,000 cars use the road daily. In late 2010, this figure had risen to close to 100,000 vehicles per day. In 2002, the morning peak traffic volume was greatest between 7:00 am and 8:00 am. By 2008, the morning peak traffic volume peaked between the hours of 5:00 am and 6:00 am.

This road consists of two separate state-controlled roads as defined by the Department of Transport and Main Roads (TMR). The part from Rocklea to Goodna is named Cunningham Arterial Road (number U16) and the other is named as part of the Cunningham Highway (number 17A). Road U16 is part of the state strategic network, and road 17A is part of the national network.{{cite map |access-date = 25 November 2021 |archive-url = https://web.archive.org/web/20140330012818/http://www.tmr.qld.gov.au/~/media/Travelandtransport/Maps%20and%20guides/Queensland%20maps/State%20road%20network/srnmapfront.pdf |archive-date = 30 March 2014 |url-status = live

Construction

The motorway was constructed in stages from 1988 to 1994:

  • 1988 - Blunder Road/Oxley Road interchange completed in September at a cost of $12 million.
  • 1989–1990 - Church Street interchange and Granard Road overpass.
  • 1991–1992 - Progress Road/Wacol Station Road and Endeavour Road interchanges.
  • 1993 - Acanthus Street/Harcourt Road, Rudd Street/Douglas Street, and Donaldson Road/Banting Street interchanges.
  • 1994 - Centenary Highway interchange (elevated roundabout).

Following completion of the final interchange, the Ipswich Motorway was commissioned on 17 May 1994.

Upgrade

In 2003, just 9 years after it was completed, planning for an upgrade of the entire motorway began. The road was identified in the South East Queensland Infrastructure Plan and Program as one requiring urgent attention. An upgrade was needed to improve safety and relieve traffic congestion.

An upgrade of the Granard Road interchange was the first project to be built. It was opened on 31 August 2006 by Federal Minister for Transport Jim Lloyd. Next was an upgrade to the section between Wacol and Goodna, including the rebuilding of the Logan Motorway interchange. Construction commenced in February 2007, and was completed in late 2009.

Widening of the motorway from four lanes to six lanes between Wacol and the Centenary Motorway at Darra was one of the Australian Labor Party's key 2007 federal election promises. The upgrade included the transformation of the Centenary Highway Interchange to a free-flowing multi level system interchange and work on adjoining service roads that aims to reduce traffic on the motorway by up to 20%. The Federal government has contributed a total of $3.1 billion for the upgrade. The Wacol to Darra section of the motorway was officially opened on 18 April 2010.

The eight kilometres upgrade of the Ipswich Motorway between Dinmore and Goodna was commenced in mid-2009. It was officially opened on 15 May 2012. The A$1.95 billion project funded by the Australian Government is delivered by the Origin Alliance consisting of the Department of Transport & Main Roads, Abigroup, Seymour Whyte, Fulton Hogan, SMEC and Parsons Brinckerhoff.

Construction of a 3km section between Granard Road, Rocklea and Oxley Road, Oxley, was commenced in 2017, and was completed in April 2021 at a cost of $400 million.

Widening of the final section, between the Centenary Motorway and Oxley Road, is still in the planning stages.

Interchanges

Exit numbers continue from the interchange Cunningham Highway/Centenary Highway. Exit numbers are (from northern terminus):

  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

Exit numbers continue along Cunningham Highway.

References

References

  1. Tony Moore. (16 November 2010). "Early bird gets the traffic jam". Fairfax Media.
  2. (March 2007). "Metropolitan District Map (east-west) Page 1 and Page 2 (Dinmore/Riverview)". Department of Transport and Main Roads ©State of Queensland [CC BY 4.0].
  3. (October 2011). "Ipswich Motorway (Darra to Rocklea) Newsletter 2". State of Queensland.
  4. (2008-03-02). "Rudd opens Ipswich Motorway upgrade". [[Australian Broadcasting Corporation]].
  5. (2008-03-02). "Labor PM Kevin Rudd kicks off Ipswich Motorway upgrade". [[Queensland Newspapers]].
  6. (11 October 2010). "Ipswich Motorway Overview". Department of Infrastructure and Transport.
  7. (27 July 2011). "Ipswich Motorway upgrade: Wacol to Darra". Department of Transport and Main Roads.
  8. Tony Moore. (15 May 2012). "Five stages down, one to go: $2.8b road upgrade completion in sight". Fairfax Media.
  9. (17 October 2011). "Ipswich Motorway upgrade: Dinmore to Goodna". Department of Transport and Main Roads.
  10. (22 November 2021). "Ipswich Motorway—Rocklea to Darra - Stage 1 (Granard Road to Oxley Road)". Queensland Government.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Ipswich Motorway — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report