Heron Quays West


FieldValue
nameHeron Quays West
imageHeron Quays West London.jpg
image_size200px
captionThe previous (2007) approved design for Heron Quays West.
locationLondon,
United Kingdom
statusUnder construction
start_date2016
completion_date2019
openingPostponed
roof214 m (Tower 1)
156 m (Tower 2)
floor_count40 (Tower 1)
29 (Tower 2)
architectRogers Stirk Harbour + Partners
developerCanary Wharf Group

United Kingdom 156 m (Tower 2) 29 (Tower 2) Heron Quays West is a skyscraper development under construction in Canary Wharf, London. The plan is for two large skyscrapers connected by a large atrium at the base, not unlike the Riverside South development. The site is at the south west of the Canary Wharf site off Bank Street. Developers for the project are the Canary Wharf Group.

History

The original design for the site, revealed in 2007, was by Richard Rogers Partnership and featured three adjacent towers.

On 27 April 2007, it was revealed that Canary Wharf Group had surprisingly sent a letter to the local council indicating they intend to stop the leasehold on site, and that they would be starting development at Heron Quay on or before August 2008. This means the development will start years before previously expected, and that North Quay will be constructed after this scheme instead of before it.

In March 2008, the Borough of Tower Hamlets approved the Heron Quays West scheme, and on 7 May 2009, Tower Hamlets issued a compulsory purchase order for the land needed to proceed with development.

An updated design was proposed in 2013–14. The updated plan features two towers known as "Heron Quays West 1" (10 Bank Street) and "Heron Quays West 2" (1 Bank Street). Tower one has 40 floors and a height of 214 metres, and tower two has 29 floors and a height of 156 metres. The two towers are joined by a common base. Of these, Heron Quays West 1 received outline planning approval in 2013, and is proceeding to detailed design. Demolition and alteration of landscaping began in early 2014.

Construction was originally considered unlikely to commence until Riverside South and North Quay were complete. Riverside South is now in indefinite suspension, however, the North Quay development is under construction.

References

References

  1. link. (2011-06-14 accessed 31 May 2009)
  2. (January 2018)
  3. (24 September 2024). "Construction of Europe's tallest and most technically sophisticated purpose-built commercial laboratory building begins at Canary Wharf - 24.09.24".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Heron Quays West — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report