Hanoi Metro

Metro system in Hanoi, Vietnam


Metro system in Hanoi, Vietnam

FieldValue
nameHanoi Metro
native_name*Đường sắt đô thị Hà Nội*
imageHanoiMetro.svg
imagesize150px
image2Hanoi Metro Line 2A Train, La Thành (20231223a) (53489340770).jpg
caption2A Line 2A train at La Thành station
ownerHanoi People’s Committee
localeHanoi, Vietnam
transit_typeRapid transit
lines2 (in operation)
2 (under construction)
headway10 minutes
stations20 (in operation)
34 (under construction)
vehicles23 four-car trainset
daily_ridership31,759
began_operation
operatorHanoi Metro Company and Tokyo Metro
system_length21.6 km (in operation)
54.38 km (under construction)
617 km (planned)
track_gauge
top_speed80 km/h
elThird rail
map[[File:Currently functional lines of the Hanoi Metro (June, 2025).jpgthumbOperational lines]]
map_nameSystem map (Operational lines)
annual_ridership20.65 million (2025)
website
image3Hanoi Metro Map Official Provisions.jpg
caption3Diagram of future provisions

2 (under construction) 34 (under construction) 54.38 km (under construction) 617 km (planned)

The Hanoi Metro () is a rapid transit system in Hanoi, the capital city of Vietnam. Owned by Hanoi's People Committee and operated by Hanoi Metro Company (HMC), it is the first operational rapid transit system in Vietnam. The system includes elevated and underground sections. The first line, Line 2A, opened to service on 6 November 2021. The first section of the second line Line 3 opened on 8 August 2024.

The system is projected to have 15 lines with a total length of 617 km by 2045. Upon opening, daily ridership was at 12,000.

History

Pre-planning

As the capital city of Vietnam, Hanoi's population is growing rapidly. As of 2010 (the year when construction started on the first line), Hanoi's population was around 6,910,000. Hoàn Kiếm District and Ba Đình District are the districts with the highest population density. The government expects the population of Hanoi to increase up to 8,000,000 by 2030. The growing population would affect the city's operation and development. To solve this issue, the Vietnamese government and the Hanoi People's Committee proposed to build an urban rail transit system, which was first proposed in the late 1990s.

In 1998, the Vietnamese government revised and agreed the “Hanoi Capital to 2020 Master Plan” which suggested that Hanoi prioritise the building of a rail transit system, with a target to build 5 lines. The "Overall Plan for the Development of Vietnam's Railway Transportation Industry to 2020", released in 2002, and the "2005-2010 Economic and Social Development Plan for 2006-2010", released in 2006, both suggested the same and aimed to finish the metro system by 2010.

Survey and approval

The start of construction was delayed continually as the government first required consultant companies from China, France and Japan, such as SYSTRA and Japan International Cooperation Agency, to finish feasibility studies which ran from 2004 to 2007. These three companies suggested the Hanoi government build a network consisting of 6 lines. In 2008, the Vietnamese government approved the construction of the suggested lines, which they divided into several phases.

Construction and opening

The pilot line of Hanoi Metro is Line 3. It began construction in 2009 with a projected completion date of 2015. The line was built by multiple companies, with train systems provided by Alstom.{{cite web|url=https://www.railwaygazette.com/modes/hanoi-metro-line-3-railway-systems-contract-signed/43827.article |title= Hanoi metro Line 3 railway systems contract signed |work= Metro Report International |date=17 January 2017 }} The railway line was built by South Korean firm Daelim Industrial and other contractors. The project was repeatedly delayed, with the completion date rescheduled to 2027. The elevated section of the line opened to the public on 8 August 2024, while the work on the underground section continued. Despite being the pilot line, Line 3 became the second operational Hanoi metro line, after Line 2A, due to the 9-year delay.

The second planned line, Line 2A, began construction in October 2011. The line was constructed by China Railway Engineering Corporation. The bulk of the construction was completed by the fourth quarter of 2018. Operational tests were conducted at the end of 2018 and again in 2019. After delays, Line 2A opened to the public on 6 November 2021, becoming the first operational metro line in Hanoi and Vietnam.

Network

According to the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016), the Hanoi Metro system will consist of 8 lines, including elevated and underground sections. The Ministry of Transport (MoT) and the Hanoi People's Committee (HPC) will both be investors in the project. Phase 1 includes Line 2A and Line 3, Line 2A and Line 3 (elevated section) are in service, and Line 3 (underground section) is currently under construction.

LineRouteLengthStationsDepotsOperational dateRoute map
Cat Linh ↔ Yen Nghia13.1 km12Yên Nghĩa6 November 2021
[[File:Map of Hanoi Metro Line 2A.svgcenter400px]]
Nhon ↔ Cau Giay8.5 km8Nhổn8 August 2024
LineRouteLengthStationsDepotsOperational date
Nam Thăng Long ↔ Trần Hưng Đạo10.8 km10Xuân Đỉnh2029
Cau Giay ↔ Hanoi Station4 km
12.5 km (planned)4
14 (planned)Nhổn2027
Văn Cao ↔ Hòa Lạc39.58 km20Sơn Đồng2030

Line 2A: Cat Linh - Ha Dong

The 13.1 km line, consisting of 12 stations (all elevated), and connecting the districts Dong Da, Thanh Xuan and Ha Dong, will be the first operational line in the metro system. This line is constructed using Official Development Assistance (ODA) from China with a total investment of US$868 million. The China Railway Sixth Group is the EPC (Engineering, Procurement and Construction) contractor for the project, and the Ministry of Transport (Vietnam) is an investor.

The construction was started on 10 October 2011 and was initially targeted to begin operations in 2016. In 2016, it was announced that the completion date was to be pushed back to early 2018. However, due to funding and land acquisition issues, construction wasn't completed until September 2018. Following completion, the pilot run and testing was conducted from September to December 2018. Line 2A was scheduled to commence operations in February 2019, before the holidays of Lunar New Year, but was postponed for the sixth time as some station construction works remained incomplete. Transport Minister Nguyen Van The had hopes that operations would begin in April 2019.

On 30 April 2019, a representative from the Railway Project Management Board informed the press that the line was not yet operational, the reason stated being that the system had not yet been issued with a safety certificate and it had not been accepted by the State Acceptance Council. By the deadline of 30 April 2019, the General Chinese Contractor had not completed some stations, depot areas, escalator roofs for stations, drainage connections for Ring Road 3 Station, landscaping, trees, electricity and ticketing systems.

After multiple delays, the trial run was restarted on 28 October 2019, to last for 20 days. Beginning in December 2020, Line 2A underwent a full-scale test run in order to check its safety before approval for commercial service. Line 2A opened to the public on 6 November 2021.

Line 3: Nhon - Hanoi Station Section

Line 3 passing over Xuan Thuy road, viewed from above

The Hanoi Metro Rail System Project (Line 3: Nhon - Hanoi Station section) is in line with the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016). The project has the Hanoi Metropolitan Railway Management Board, French government, Asian Development Bank, and European Investment Bank as the investors, and will be built in two phases. Phase 1 is 12.5 km long in total and consists of 12 stations, with 8.5 km elevated and 4 km underground, and will serve residents from districts such as Nam Tu Liem, Bac Tu Liem, Cau Giay, Ba Dinh, Dong Da, and Hoan Kiem.

Construction for Line 3 began in 2010 and was initially targeted to commence service in 2018. However, in 2017, it was announced that the construction would not be complete until 2021, and that the operation start was deferred to 2022. In July 2018, the Hanoi Metropolitan Railway Management Board (MRB) announced that only 43% of the work for Line 3 had been completed, and the launch date of elevated section would most likely be delayed until early 2023. However, in September 2022, the authorities requested to extend the deadline to 2025, and increase the budget by a further VND1.9 trillion ($80.77m USD). The line was further delayed in September 2022 when the authorities announced that they expected the line to fully open in 2027.

Future plans

Planning and future linesLineAlternate nameRouteLength (km)StatusNumber of stationsDepots
Long Biên LineYên Viên ↔ Ngọc Hồi26 kmpending budget approval
(opens in 2030)16Yên Viên
Ngọc Hồi
Dương Xá ↔ Gia Lâm10 kminitial planning7Dương Xá
Hoàn Kiếm LineNoi Bai International Airport ↔ Nam Thăng Long18 kmpending budget approvalXuân Đỉnh
Phủ Lỗ
Trần Hưng Đạo ↔6 kmpending budget approval6
↔ Hoàng Quốc Việt7 kminitial planning
Cát Linh Line↔ Xuân Mai...initial planning
Văn Miếu LineTrôi ↔36 kminitial planning
↔ Yên Sở (Hoàng Mai)8.8 kmpending budget approval7Yên Sở
Thăng Long Line(circular line) Mê Linh ↔ Liên Hà54 kminitial planning41Liên Hà
Đại Mạch
Nội Bài LineNoi Bai Airport ↔ Ngọc Hồi43 kmresearch planning29Ngọc Hồi
Kim Mỗ
Hà Đông LineMê Linh ↔ Dương Nội28 kminitial planning23Mê Linh
Mỹ Đình LineSơn Đồng ↔ Mai Dịch ↔ Dương Xá37 kmpending budget approval26Sơn Đồng
Cổ Bì
Sơn Tây LineSơn Tây ↔ Hoà Lạc ↔ Xuân Maiinitial planningSơn Tây
Xuân Mai
[[File:Hanoi Metro Monorail 1.svg40pxlink=Monorail 1 (Hanoi Metro)alt=Hanoi Metro Monorail 1]]Liên Hà ↔ Tân Lập ↔ An Khánh11 kminitial planning
[[File:Hanoi Metro Monorail 2.svg40pxlink=Monorail 2 (Hanoi Metro)alt=Hanoi Metro Monorail 2]]Giáp Bát ↔ Thanh Liệt ↔ Phú Lương
Mai Dịch ↔ Mỹ Đình ↔ Văn Mỗ ↔ Phúc La22 kminitial planning
[[File:Hanoi Metro Monorail 3.svg40pxlink=Monorail 3 (Hanoi Metro)alt=Hanoi Metro Monorail 3]]Nam Hồng ↔ Mê Linh ↔ Đại Thịnh11 kminitial planning

(Source: except for some numbers here)

Progress

Line 1 (Long Biên Line): Ngọc Hồi - Gia Lâm (Phase 1) (Yên Viên - Ngọc Hồi)

The Ngọc Hồi - Gia Lâm section of Metro Line 1 is 15.4 km long and elevated (including 8.9 km elevated, 1.7 km km bridge and 4.8 km on surface). The line has the Railway Project Management Unit (RPMU) as its investor and Ministry of Transport as project owner. Its budget is from Japanese ODA. Currently it is in the detailed design phase. Furthermore, Ministry of Transportation has reported to National Assembly that the ministry has transferred the railway section from Yên Viên to Ngọc Hồi including Hà Nội railway station and Giáp Bát railway station to Hanoi People's Committee to implement Hanoi urban railway line (AKA Long Biên line) to feed the future North-South High Speed train since there will be a construction of the Northern terminus (AKA the Hà Nội High Speed train station which will be functioned as the new Hà Nội railway station) of North-South High Speed train at Ngọc Hồi on 151 hectares of land. The line will be completed in 3 phases:

  • Phase 1: Ngọc Hồi - Hà Nội railway station - Gia Lâm (15.4 km)
  • Phase 2: Gia Lâm - Yên Viên (13.3 km)
  • Phase 3: Gia Lâm - Dương Xá (10 km) The first 2 phases of Line 1 will have 16 stations: Yên Viên, Cầu Đuống, Đức Giang, Gia Lâm, Long Biên North, Long Biên South, Phùng Hưng, , Thống Nhất Park, Bạch Mai, Phương Liệt, Giáp Bát, Hoàng Liệt, Văn Điển, Vĩnh Quỳnh, Ngọc Hồi

Line 2 (Hoan Kiem Line): Nam Thăng Long - Trần Hưng Đạo (Phase 1) (Noi Bai Airport - Nam Thăng Long - Trần Hưng Đạo - Thượng Đình - Hoàng Quốc Việt)

This section is 42 km in length, connecting Noi Bai Airport with the city center. There will be 32 stations and 2 depots. The 4 phases of the project are:

  • Phase 1: Nam Thăng Long - Trần Hưng Đạo: 11.5 km long, of which 8.9 km are underground and 2.6 km are elevated. It consists of 10 stations including 7 underground, 3 elevated and 1 depot. The project owner is Hanoi Metropolitan Railway Management Board. The project will be funded by Japanese ODA. At present cost estimate is pending to be approved. This phase will have 10 stations: Nam Thăng Long, Ngoại Giao Đoàn, Tây Hồ Tây, Bưởi, Quần Ngựa, Bách Thảo, Hồ Tây, Hàng Đậu, Hoàn Kiếm Lake, Trần Hưng Đạo
  • Phase 2: Trần Hưng Đạo - Thượng Đình: 5.9 km long, fully underground and now is at feasibility study phase. This phase will have 6 other stations after Trần Hưng Đạo: Cầu Dền, Bách Khoa, Kim Liên, Chùa Bộc, Ngã Tư Sở, .
  • Phase 3: Thượng Đình - Ring road 2.5 - Hoàng Quốc Việt
  • Phase 4: Nội Bài Airport - Nam Thang Long: 12.5 km long

Line 4 (Thang Long Line): Me Linh - Dong Anh - Hoang Mai - Ring road 2.5 - Co Nhue - Lien Ha

Line 4 is the longest out of 8 lines, with 41 stations and 2 depots. It will work as a loop line that takes into account connections with lines 1, 2A, 3, 5, 6 and 7.

Line 5 (Kim Ma Line): South West Lake - Hoa Lac - Ba Vi (Văn Cao - Hòa Lạc)

In 2012, the project was expected to start in 2017 but the commencement date has now been postponed. It will be 38.4 km long with 17 stations and 2 depots. Right now feasibility study is carried out by the Japan International Cooperation Agency (JICA). Its project owner is the Hanoi Metropolitan Railway Management Board. 2 phases are:

  • Phase 1: South West Lake - An Khanh: 14.1 km with 10 stations
  • Phase 2: An Khanh - Ba Vi: 24.1 km with 7 stations

Line 6 (Noi Bai Line): Noi Bai Airport - Phu Dien - Ha Dong - Ngoc Hoi

Line 6's total length is 43 km with 29 stations and 2 depots. The route runs mainly on the current national track system, connecting the southern districts to the northern ones and Noi Bai airport (T2 terminal).

Line 7 (Ha Dong Line): Me Linh - Nhon - Van Canh - Duong Noi

Line 7 is 27.6 km long with 23 stations and 1 depot at Me Linh. The route runs in the north to the south, connecting Me Linh urban area to urban area series in the midst of ring roads 3 and 4 and downtown in the west of Hanoi.

Line 8 (My Dinh Line): Son Dong - Mai Dich - Linh Nam - Duong Xa

Line 8 is 37.4 km long with 26 stations and 2 depots. The underground section is from Mai Dich to Linh Nam, and elevated sections are 2 parts: Son Dong to Mai Dich and Linh Nam to Duong Xa.

Rolling stock

Line 2A: CRRC trains

A Line 2A train at [[Vành Đai 3 station

On 20 October 2015, the Railway Project Management Unit (RPMU) organized the Cat Linh - Ha Dong sample train exhibition at Giang Vo Exhibition Center, Ba Dinh District. The decision was made to use Chinese rolling stock manufacturer CRRC Corporation Limited (CRRC) trains, made by Beijing Subway Rolling Stock Equipment, to supply the rolling stock for Line 2A.

Each train will consist of 4 carriages, with capacity for over 1,200 passengers. Each carriage weighs around 35 t, is 19 m long, 3.8 m high, and 2.8 m wide. The first train arrived in Hanoi in March 2017 via the port of Hai Phong. The CRRC supplied a total of 13 four-car train-sets in 2018, which are all currently stabled at a depot at Phu Luong, east of Yen Nghia. Trains are powered by a 750 V third rail, a first for Vietnam.

Inside line 2A train

The trains' exteriors are painted green, and the seal of the Hanoi Temple of Literature, which is the symbol Khue Van of Hanoi, is shown on the front of the train, and the line name “Cat Linh - Ha Dong” is displayed along the bottom in white. A small LED screen is place at the left top corner to show the name of the line.

Line 3: Alstom trains

Controller cabin of line 3 train

On 17 January 2017, Hanoi Metro Company signed a contract with French locomotive manufacturer Alstom to supply the rolling stock for Line 3, which will come from its Alstom Metropolis series. The current order is for 10 train sets, costing around US$128 million. The trains features an air-conditioning system, speakers, automatic LED lights. The interior is wheelchair accessible, and also includes dedicated space and seating for senior citizens. Each train can carry 950 passengers. The first four-car trains were shipped from the port of Dunkirk, on 9 September 2020.

The cyan, pink and grey of the exterior design symbolises rice seeding leaves and dragon fruit, some of the main products in Vietnam. Additionally, like Line 2A, the seal of the Hanoi Temple of Literature is displayed on the front of the train.

Fares and ticketing

Fares

Fares on the Hanoi Metro system are set by the city (People's Committee), and are calculated by distance increments between stations, rather than the fare zone system used by other systems (London Underground) or flat fare (NYC Subway). In addition, the system does not utilize peak-hour or off-peak fare, as commuters pay the exact same fare regardless of when they board.

The ticket system will allow for connection between all routes and will be usable with other public transportation such as bus, taxi, etc. The tickets will be available for purchase at the terminal (ticket office or vending machine), using a modern, compact form of ticket (similar to an ATM card). Tickets will use modern technology, with value retention and high security.

There will be many types of tickets for passengers to choose from: Tickets take turns, Ticket by day, week, month, Group ticket and Electronic ticket (IC Card) combines many other gadgets.

Line 2A Fares and ticketing

The price of the tickets for the Cat Linh-Ha Dong metro, with the lowest one being VND 9,000 (USD 0.34) for a short trip, VND 19,000 (USD 0.72) for a longest trip, and VND 40,000 (USD 1.52) for a day pass.

Line 3 Fares and ticketing

The price of the tickets for the Nhon-Ha Noi station metro, with the lowest one being VND 9,000 (USD 0.34) for a short trip, VND 15,000 (USD 0.57) for a longest trip, and VND 40,000 (USD 1.52) for a day pass.

Monthly pass and others

  • A monthly pass for a common passenger is priced at VND 280,000 (USD 10.62), for a group of more than 30 people is priced at VND 200,000 (USD 7.59) per person.
  • A monthly pass for a student/worker in industrial park is priced at VND 140,000 (USD 5.31)
  • Children (under 6), seniors (over 60), and people who are disabled or have registered as having low income are eligible for a free pass.

Ticketing

For ticketing, as of September 2025, only single-journey tickets and day passes are sold at the stations. There's no physical store-valued cards (like Hong Kong's Octopus, or Singapore's EZ-Link).

A single use ticket for Line 3, in the shape of a circle token. Line 2 uses a credit card-size ticket instead.

The Hanoi Metro system accepts various payment methods for ticketing, including cash, debit/credit card, and VietQR code. Ticket can be bought at counters located in the stations, or by vending machine. In a trial started 23 September 2025, commuters can use contactless Visa card or mobile devices (Apple Pay, Google Pay), scanning VietQR code, or using their National Identity Card at payment gate on Line 2A. In addition to buying day pass at the station

LineCash/VietQR (at the counter)Cash (at vending machine)Credit/Debit card (at vending machine)Contactless payment (at-gate)
Line 2
Line 3

References

References

  1. (2022-11-04). "'Metro Cát Linh-Hà Đông thay đổi thói quen đi lại của người dân'". VietnamPlus.
  2. "Vietnam Tokyo Metro set up to run Hanoi's urban railway".
  3. (2026-01-09). "Metro Hà Nội cán mốc hơn 20 triệu lượt hành khách trong năm 2025".
  4. Burroughs, David. (9 November 2021). "Hanoi opens Vietnam's first metro line".
  5. May, Tiana. (2024-08-09). "Hanoi Metro Line 3 Commences Passenger Service".
  6. "Second Hanoi Metro Railway Opened".
  7. (13 December 2024). "Hanoi plans to build nearly 600 km of urban railway by 2045".
  8. (13 December 2021). "Vietnam's First Metro, in Hanoi, Hobbled by Lack of Riders".
  9. (10 December 2010). "Dân số Hà Nội: 6.913.161 người". Báo An ninh Thủ đô.
  10. "Hanoi Metro, Vietnam". Systra.
  11. (2008). "Ex-ante Project Evaluation". Japan International Cooperation Agency.
  12. (20 June 1998). "Quyết định 108/1998/QĐ-TTg phê duyệt điều chỉnh quy hoạch chung Thủ đô Hà Nội đến năm 2020". Bộ Tư pháp.
  13. (23 October 2004). "Hoàn thành báo cáo khả thi tuyến đường sắt trên cao Hà Nội - Hà Đông". Việt Báo.
  14. (March 2007). "The Comprehensive Urban Development Programme in Hanoi Capital City: Final Report". Japan International Cooperation Agency; ALMEC Corp; Nippon Koei; Yachiyo Engineering.
  15. (20 April 2017). "Hanoi Metro".
  16. Tô, Thế. (9 October 2025). "Hà Nội khởi công tuyến metro số 2, hình thành TOD đầu tiên tại Thủ đô".
  17. (14 April 2014). "Hanoi metro Line 3 contractor chosen". Railway Gazette International.
  18. NITTA, YUJI. (8 August 2024). "Vietnam opens 2nd Hanoi metro line after 9-year delay".
  19. (8 November 2021). "First metro line opened in Hanoi". Metro Report International.
  20. (25 September 2010). "Khởi công tuyến đường sắt đô thị đầu tiên tại Hà Nội". Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh.
  21. (10 October 2011). "中铁六局承建河内城市轨道建设项目开工". 经济日报社.
  22. (2017-12-11). "Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng". Bộ Khoa học Công nghệ.
  23. (29 October 2019). "Hanoi's First Metro Line Begins 20-Day Trial Run".
  24. Doan Loan. (2018-12-26). "Four major transport projects on track for completion next year". VN Express.
  25. (2021-04-30). "Hanoi metro receives safety clearance from French consultant".
  26. Burroughs, David. (9 November 2021). "Hanoi opens Vietnam's first metro line".
  27. "Masterplan of 8 metro lines in Hanoi in 2030 and vision to 2050".
  28. (2021-06-10). "Khai thác thương mại đường sắt Cát Linh - Hà Đông vào quý III/2021".
  29. "Hà Nội khởi công tuyến metro số 2, hình thành TOD đầu tiên tại Thủ đô".
  30. Tuệ, Nhân. (20 December 2025). "Hà Nội khởi công tuyến Metro số 5 Văn Cao - Hòa Lạc".
  31. "Test ride of metro line 2A Cat Linh - Ha Dong".
  32. (11 December 2017). "Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng". Bộ Khoa học Công nghệ.
  33. "Đường sắt Cát Linh – Hà Đông lùi tiến độ lần thứ 10".
  34. (10 December 2015). "Ha Noi Metro Rail System Project (Line 3: Nhon-Ha Noi Station Section)".
  35. "Hanoi 2nd metro line likely to be delayed by 5 years - VnExpress International".
  36. "Metro Nhổn - ga Hà Nội dự kiến vận hành đoạn trên cao dịp 30/4".
  37. [[:vi:Đường sắt đô thị Hà Nội]]
  38. (9 June 2022). "Xin Bộ Chính trị chủ trương đầu tư đường sắt tốc độ cao Bắc - Nam". Thanh niên Online.
  39. (18 August 2022). "Ga Hà Nội, Giáp Bát sẽ chuyển đổi để làm đường sắt Yên Viên - Ngọc Hồi". VOV Online.
  40. (22 August 2022). "Hanoi train station infrastructure to be relocated for metro project". VnExpress.
  41. (19 February 2017). "Hình ảnh đoàn tàu đầu tiên tuyến đường sắt Cát Linh - Hà Đông". Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh.
  42. (18 January 2017). "Năm 2021, Hà Nội có tàu điện ngầm". Đoàn Thanh niên Cộng sản Hồ Chí Minh.
  43. (14 September 2020). "Alstom ships first train for Hanoi metro".
  44. (8 September 2018). "Hanoi Reveals Train Designs for Metro Line 3, Seeks Public Feedback". Urbanist Hanoi.
  45. "Types of metro tickets".
  46. Báo điện tử Tiền Phong. (2025-09-23). "Trải nghiệm mới: Người dân đi tàu điện chỉ với CCCD, thẻ VISA hoặc QR".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Hanoi Metro — get instant answers, deeper analysis, and related topics.

Research with Mako