Golfech Nuclear Power Plant
Nuclear power plant in France
Nuclear power plant in France
| Field | Value |
|---|---|
| name | Golfech Nuclear Power Plant |
| name_official | Centrale Nucléaire de Golfech |
| image | Golfech NPP cropped.jpg |
| image_caption | Golfech Nuclear Power Plant |
| coordinates | |
| country | France |
| location | Golfech (Tarn-et-Garonne) |
| status | O |
| construction_began | 1982 |
| commissioned | |
| operator | EDF |
| ps_units_operational | 2 × 1363 MW |
| np_reactor_type | PWR |
| np_reactor_supplier | Framatome |
| ps_cooling_source | Garonne |
| ps_cooling_towers | 2 × Natural Draft |
| ps_units_manu_model | Alstom |
| ps_electrical_capacity | 2726 |
| ps_annual_generation | 17,992 |
| ps_electrical_cap_fac | 75.3% |
The Golfech Nuclear Power Plant is located in the commune of Golfech (Tarn-et-Garonne), on the border of Garonne between Agen (30 km downstream) and Toulouse (90 km upstream) on the river Garonne, from where it gets cooling water, it is approximately 40 km west of Montauban.
The station has two operating nuclear reactors that are both pressurized water reactors of the French P'4 design. The plant also has two 178.5-metre-tall cooling towers that get water from the Garonne River, only using water to compensate for evaporation; the cooling loop is closed and water is never released back into the river.
In 2002 the plant produced nearly half of the electricity used in the area. It employs nearly 700 full-time workers.
History
In 1965, the Midi-Pyrénées announced its intention to construct a nuclear plant near Malause. EDF then went about securing a site for the station. In 1967 a board of inquiry initially laid out plans for two UNGG reactors with an output of 800 MWe each.
Due to falling petroleum prices and conflicts between EDF and CEA, the project was delayed, with a decision made between 1967 and 1969. In 1969 after the departure of Charles de Gaulle, CEA gave up on the UNGG plans.
In 1973, a nearby hydroelectric plant of 63 MW was completed and the regional manager for EDF announces plans for PWRs at the same site to be finished by 1985.
In 1978, EDF announces that Golfech would be the site for 4 PWRs eventually of 1300 MWe each.
On 17 June 1979, 5,000 protesters walked on the future site and released balloons.
During summer heatwaves the power plant output had to be reduced repeatedly because the Garonne had exceeded the statutory temperature limit of 28 °C which serves to protect the aquatic ecosystem.
Events
These are all 1 on the INES scale and occurred in 1998.
- on 28 September 1998 at the time of an operation check of the measuring equipment of the neutron flux in the middle of the reactor, the operator did not respond to one of the signals that should have been investigated.
- on 4 November the Autorité de sûreté nucléaire discovered that on 14 October, EDF ran the reactor with an overpower of 7% for 30 hours.
- on 27 November the containment building is evacuated following an alarm due to an atmospheric detection of radioactivity. Ten workers are slightly contaminated.
References
References
- (1989). "Hydraulic works study of Golfech cooling towers".
- Jammet, Géraldine. (30 July 2024). "Un réacteur nucléaire de la centrale de Golfech mis à l'arrêt à cause de la chaleur". La Depeche.
- Duchampt, Sylvain. (25 June 2025). "Golfech sous tension : 'les fortes chaleurs nous obligent à réduire la production', EDF adapte sa centrale pour préserver la Garonne". France Info.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Golfech Nuclear Power Plant — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report