Skip to content
Surf Wiki
Save to docs
geography/spain

From Surf Wiki (app.surf) — the open knowledge base

El Atazar Dam

El Atazar Dam

FieldValue
nameEl Atazar Dam
imagePresa de El Atazar - 01.jpg
image_size300px
image_captionThe dam in 2014
locationCommunity of Madrid
coordinates
countrySpain
statusCompleted
construction_began1968
dam_height_foundation134 m (440 ft)
dam_length52.3 m (171.6 ft)
res_nameEl Atazar Reservoir
res_capacity_total426 hm3
res_surface10.7 km²
The reservoir

El Atazar Dam is an arch dam built near Madrid, Spain on the Lozoya River, very close to where the Lozoya joins the Jarama. The curved design of the dam is optimum for the narrow gorge in which it was built to retain water in the reservoir. Arch dams are thin and require less material to construct than other dam types.{{cite web |url=https://www.pbs.org/wgbh/buildingbig/dam/basics.html#arch

When the dam was built, the decision was made to use the dam to store and regulate water only and not to provide energy. Construction started on the dam in 1968 and finished in 1972.

Design

The dam is 134 m (440 ft) high and 52.3 m (171.6 ft) wide at the foundation. The reservoir capacity is 424,000,000 m3 (344,000 acre feet). It is a double curvature concrete arch buttress design.{{cite web |url-status = dead

Problems

Monitoring of the dam revealed abnormal movement. Although dams normally move, the left side of the El Atazar Dam was moving more than the right because a support built on the dam's right made that side less flexible. In 1977 a crack was noticed in the dam. By 1979 the crack had grown to 46 m (150 ft) in length and was repaired. Inspection in 1983 revealed that the settling in the foundations and the movements of the dam had caused fracturing in the rock, resulting in significantly increasing the foundation's permeability. The crack has been treated and since then the problems have abated.{{cite web |url-status=live

Power plant

The dam supports a hydroelectric power plant with a nameplate capacity of 9,56 MW. Its annual generation lies between 18,66 (2012) and 44,49 (1998) GWh. The power station contains 2 Francis turbine-generators with 4,78 MW (5,4 MVA) each. The turbine rotation is 500 rpm. The hydraulic head is 56 m. Maximum flow per turbine is 8 m³/s.

Notes

Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about El Atazar Dam — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report