Circle Line (Singapore)

Mass Rapid Transit line in Singapore

Circle Line (Singapore)

Mass Rapid Transit line in Singapore

FieldValue
box_widthwidth:12em;
name[[File:MRT Singapore Destination 8.svg25px]] [[File:MRT Singapore Destination 9.svg25px]] [[File:MRT Singapore Destination 10.svg25px]]
Circle Line
color
logoCircle Line logo.svg
logo_width250px
imageCC6 Stadium MRT Platforms 20201007 161358.jpg
image_width300px
captionC830 trainset at Stadium station.
native_name
地铁环线
statusOperational
Under construction (Stage 6)
ownerLand Transport Authority
localeSingapore
startDhoby Ghaut
Stadium
Prince Edward Road (From 2026, during peak hours)
endHarbourFront (Until 2026)
Marina Bay (Until 2026)
stations30 (operational)
3 (under construction)
mapcolorOrange (#)
typeRapid transit
Light metro
systemMass Rapid Transit (Singapore)
routes3
operatorSMRT Trains Ltd (SMRT Corporation)
depotKim Chuan
stockAlstom Metropolis C830
Alstom Metropolis C830C
Alstom Metropolis C851E (Future)
daily_ridership450,000 (2023)
planopen1H 2026 (Stage 6)
open(Stage 3)
(Stages 1 and 2)
(Stages 4 and 5)
(Circle Line Extension)
linelength35.5 km (Operational)
4 km (Under Construction)
tracklength35.5 km (Operational)
4 km (Under Construction)
characterFully underground
gauge
electrification
speedlimit of 78 km/h
map_nameRoute diagram
map
map_statehide

Circle Line 地铁环线

Under construction (Stage 6) Stadium Prince Edward Road (From 2026, during peak hours) Marina Bay (Until 2026) 3 (under construction) Light metro Alstom Metropolis C830C Alstom Metropolis C851E (Future) (Stages 1 and 2) (Stages 4 and 5) (Circle Line Extension) 4 km (Under Construction) 4 km (Under Construction)

The Circle Line (CCL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. It runs in a loop from Dhoby Ghaut station in the city-centre to HarbourFront station in the south via Bishan station in the centre of the country. It also has a branch line from Promenade station to Marina Bay station. Coloured orange on the rail map, the fully-underground line is approximately 35.5 km long with 30 stations. Travelling from one end of the line to the other takes about an hour.

The line was the fourth MRT line to open on the network, with its first stage, from Bartley to Marymount, commencing operations on 28 May 2009. At launch, the line operated Alstom Metropolis C830 electric multiple unit (EMU) trains. The next stage to Dhoby Ghaut opened on 17 April 2010, followed by the extension to HarbourFront on 8 October 2011. A two-station extension to Marina Bay was inaugurated on 14 January 2012. The final stage, running from HarbourFront to Marina Bay with stations at Keppel, Cantonment and Prince Edward Road, is scheduled for completion in 2026, at which point the line will form a complete loop.

It is the second line in Singapore after the North East Line to be completely automated and driverless and is among the world's longest driverless rapid transit lines. The Circle Line was Singapore's first medium-capacity rail line. Ridership exceeded projections for its three-car trains, resulting in overcrowding compared with higher-capacity MRT lines. Following the line's opening, additional trains, including the C830C and C851E, were procured to accommodate growing demand.

History

Original plans

The Marina MRT line as announced in 1997; 18 stations were planned for the line.

The Circle Line dates back to 1989, when then-Minister for Communications and Information, Yeo Ning Hong, stated that such a system would be "feasible when the population reaches four million", noting the slow population growth and demand.

In October 1997, the Land Transport Authority (LTA) announced the Marina line, a Light Rapid Transit (LRT) line. The 12 km line, mostly underground, would start from Kallang station, and serve Marina Centre and a new district at Marina South with multiple branches to People's Park and Dhoby Ghaut stations. The Marina line was planned to have 18 stations, with possible extensions to Tanjong Pagar and Paya Lebar stations. Plans for the line were confirmed and approved by the government on 12 June 1998. However, due to the high costs and lack of development in Marina South, the Chinatown branch was later removed in November 1999 and the line was reduced to 6 stations from the Dhoby Ghaut to Stadium stations. A part of the removed leg later became part of the Downtown Line. On the other hand, a further extension towards Upper Paya Lebar was announced on 28 April 2001.

The Marina Line was eventually merged with a planned Light Rail Transit line that went from Paya Lebar to Buona Vista via Serangoon and Bishan to form Circle Line Stage 3 on 20 January 2003, and subsequently Circle Line Stage 4 and 5 on 12 December 2003 when Stage 4 was extended from Buona Vista to World Trade Centre to close up the link and to provide connectivity from the west to Sentosa, becoming the Circle Line. On 8 August 2001, SMRT won the bid and was appointed the operator of the Circle Line. Names for the stations for the first three stages of the Circle Line were finalised in July 2005 after the Land Transport Authority (LTA) conducted a public consultation exercise on the naming of stations.{{Cite web|title=Annex A Finalised Names For Circle Line (CCL) Stages 1-3 Stations

Construction of the initial stages

The construction of Bishan station

Construction started on 13 March 2002 for Stage 1, 5 September 2002 for Stage 2, May 2003 for Stage 3, and January 2005 for Stages 4 and 5. Initially planned to be opened in stages from 2006 to 2010, at an estimated cost of S$6.7 billion, the Nicoll Highway collapse delayed the opening of the first stage to 2009. When the line fully opened on 8 October 2011, the cost of construction had risen to nearly S$10 billion. Due to the collapse, the station was relocated to a new site two-thirds the size of the original 100 m away. Three stations on the Circle Line were initially designed as 'shell stations', but the decision was made to open two of them, Caldecott and Haw Par Villa (previously Thomson and West Coast respectively), leaving Bukit Brown as the only unopened station on the line.

The first section of the line, Stage 3, a 5 km five-station segment stretching from Bartley to Marymount, opened on 28 May 2009. Initial ridership on this section was lower than estimated, at 32,000 passengers per day (ppd) instead of the estimated 55,000 ppd. Tunneling works for the entire line were completed on 17 August 2009. Stages 1 and 2 started operations on 17 April 2010, followed by Stages 4 and 5 (from the Marymount to HarbourFront stations) on 8 October 2011. A two-station extension to Marina Bay opened on 14 January 2012.

Circle Line stage 6

On 17 January 2013, then-Minister for Transport, Lui Tuck Yew, announced Circle Line Stage 6 which would "close the circle", set to be completed by 2025. The 4 km extension will run between Marina Bay and HarbourFront. The extension will connect commuters between the HarbourFront to Marina Bay stations and expand the rail network to the southern edge of the Central Business District. On 29 October 2015, LTA announced the station locations for Stage 6, with the working names of the stations being Keppel, Cantonment, and Prince Edward. Tenders were called for construction between 2016 and 2017.

On 15 May 2017, the LTA invited the public to send in suggestions for names of the three MRT stations or propose to keep their current names. The Keppel and Cantonment stations kept their names, while Prince Edward station was changed to Prince Edward Road station.

Construction of Stage 6 commenced in late 2017. A joint venture – by China State Construction Engineering (the Singapore branch) and Nishimatsu Construction – won the contract to build the new Keppel station and its associated tunnels.

Stage 6 of the line is now expected to be completed by 2026 instead due to delays caused by the COVID-19 pandemic. Tunnelling works for the CCL6 were completed on 12 January 2022, with a final tunnel breakthrough from Prince Edward Road station into Cantonment station. The tunnels between Cantonment station and the adjacent Prince Edward Road station were constructed only 6.7 m below the former Tanjong Pagar Railway Station. Prior to the tunnelling works, an extensive survey was conducted to ensure that the tunnels do not cross through the building's foundations. Structures were erected to protect the railway station's facade and interior, and monitoring instruments were installed to watch out for any building settlement. To construct the tunnels to Keppel station, the Keppel viaduct had to be closely monitored while underpinning the viaduct with new micro piles. Three bored piles were removed for the tunnelling works.

On 6 December 2024, it was announced that Stage 6 will commence operation in the first half of 2026. During peak hours, trains will no longer terminate at either Pasir Panjang or Paya Lebar except for withdrawal trains; instead it will run from Dhoby Ghaut to Prince Edward Road. During off-peak hours, trains will only run up to Stadium, and the full loop will run all day (known as clockwise loop or counter-clockwise loop).

Incidents

Nicoll Highway collapse

Main article: Nicoll Highway collapse

On 20 April 2004, a section of the tunnel being built for the Circle Line collapsed, when a retaining wall used in the tunnel's construction gave way. This incident occurred near the proposed site of the Nicoll Highway station, not far from the Merdeka Bridge. The accident left a collapse zone that was 150 m wide, 100 m long, and 30 m deep. Four workers were killed, and three were injured.

A criminal inquiry found the main contractor Nishimatsu Construction Company and joint venture partner firm Lum Chang Construction Company and their officers, as well as key Land Transport Authority officers responsible for the collapse. Several other officers and subcontractors were reprimanded and issued warnings in connection with the accident.

As a result of this accident, the first phase of the Circle Line, previously scheduled to open in 2008, was completed in 2009 instead. The affected station has been shifted about 100 m away from the accident site and is now located at Republic Avenue.

This accident also resulted in stricter safety regulations for the construction of all future MRT lines. The shifting of the Nicoll Highway station also meant it can no longer serve as a terminus for the Bukit Timah Line, partially influencing the creation of the current Downtown Line.

Other incidents during construction

On 16 August 2007, the Building and Construction Authority (BCA) issued a stop-work order and revoked the contractor's tunnelling permit after a 7 m stretch of two lanes close to the junction of Telok Blangah Road and Alexandra Road sank about 20 cm that evening.

A section of the road above a construction site near Holland Road caved in on the morning of 24 May 2008, creating a hole. The hole, directly in front of two private houses along Cornwall Gardens, measured 8 by 7 metres and was 3 metres deep. No one was injured, but the road was temporarily closed to traffic.

Major disruptions

From 17 January 2026 to 19 April 2026, a three-month scheduled service disruption is taking place on sections of the Circle Line for tunnel strengthening works. During this period, trains are to run on a single platform on the eastern stretch between three stations – Mountbatten, Dakota and Paya Lebar. This disruption was deemed necessary for longer engineering hours due to a phenomenon called "tunnel squatting". This is because portions of the Circle Line were constructed in soft marine clay, a material that naturally compresses over time. This ongoing soil settlement subjects the tunnels to external pressure, leading to the circular structure gradually deforming into an elliptical or oval shape that needs to be reinforced with steel plates.

Network and operations

Network

The Circle Line is the second line in Singapore to be completely automated and driverless, following the North East Line, and is among the world's longest driverless rapid transit lines. It is also the first medium capacity line in Singapore.

Capacity and overcrowding

In 2011, the Circle Line was projected to reach a final ridership of 400,000 passengers per day upon full completion. However, the line quickly surpassed expectations due to population growth and rising commuter demand, with reports of overcrowding emerging as early as October 2011 when Stages 4 and 5 opened. By May 2015, daily ridership had reached 398,000, and by 2023, the line averaged over 450,000 passengers per day.

Key interchanges such as in Serangoon and Bishan in particular have frequently experienced overcrowding especially during peak hours due to the stations' narrow platforms and the operational constraint of running only three-car trains. Commuters have reported waiting times of up to 30 minutes during peak hours to board a train. In response, the LTA has announced that 23 new trains will be added to the line in 2026 to further reduce headway.

Route

Refer to caption.
url-status=live }}</ref>

The 35.5 km Circle Line forms an incomplete loop from Dhoby Ghaut in the Central Region of Singapore, north to Serangoon and Bishan, and south to HarbourFront, with a branch from Promenade to Marina Bay station which will be extended to HarbourFront in 2026. The fully-underground circular route also makes several links with the other MRT lines. The line begins at Dhoby Ghaut station, which has an interchange with the North–South Line and North East Line, going eastwards and paralleling Bras Basah Road and Raffles Boulevard, before joining the Circle Line extension at Promenade station, which also interchanges with the Downtown Line. From Promenade station, the line goes northwards and towards the east, passing beneath the Kallang Basin. Between the Stadium and Dakota stations, the line parallels Stadium Boulevard and Old Airport Road, then the line continues northwards and follows the route of Paya Lebar Road and Upper Paya Lebar Road between the Paya Lebar (which interchanges with the East–West Line) and Tai Seng stations.

The line curves and continues westwards between the Bartley and Marymount stations, also interchanging with the North East and North–South lines at Serangoon and Bishan stations respectively, and then it continues in a general southwest direction between Caldecott and Kent Ridge, the former having an interchange with the Thomson–East Coast Line, passing through Bukit Brown Cemetery between the Caldecott and Botanic Gardens stations. The line also interchanges with the Downtown Line at Botanic Gardens station and the East–West Line at Buona Vista station. After Kent Ridge station, the line curves eastwards, paralleling the West Coast Highway and then terminating at HarbourFront station, where it interchanges with the North East Line.

From 2026, upon the completion of Stage 6, the Circle Line will continue eastwards from HarbourFront, paralleling Keppel Road and Ayer Rajah Expressway, and joins the Circle Line extension at Marina Bay station. The Circle Line extension from Marina Bay to Promenade station generally parallels the Downtown Line and Bayfront Avenue, also passing underneath Marina Bay Sands at Bayfront station, which it serves and has cross-platform interchange with the Downtown Line. Also, end-destination number 8 and 9 will be replaced by clockwise and counter-clockwise loops.

Stations

Station codes for the line are orange, corresponding to the line's colour on the system map. All stations have island platforms, with the exception of Promenade and future infill station Bukit Brown.

DateProjectDescription
28 May 2009Stage 3Bartley – Marymount
17 April 2010Stage 1Dhoby Ghaut – Stadium
Stage 2Mountbatten – Tai Seng
8 October 2011Stage 4Caldecott – Kent Ridge
Stage 5Haw Par Villa – HarbourFront
14 January 2012Circle Line ExtensionBayfront – Marina Bay
1H 2026Stage 6Keppel – Prince Edward Road
FutureFuture infill stationsBukit Brown station, between Caldecott and Botanic Gardens

Legend

[[File:Aiga escalator down.svg15pxlink=]]
Underground[[File:ISO 7010 W003.svg15pxlink=]]
Civil Defence Shelter[[File:Aiga carrental cropped.svg10pxlink=]] [[File:BSicon Mono-CHN.svg10pxlink=]] [[File:BSicon AETRAM.svg10pxlink=]] [[File:Aiga watertransportation.svg10pxlink=]] [[File:20 airtransportation.svg10pxlink=]] [[File:Aiga immigration.svg10pxlink=]]
Other transportation modes

List

SMRTCircle}}"Station codeSMRTCircle}}"Station nameSMRTCircle}}"ImagesSMRTCircle}}"Interchange;
Adjacent transportationSMRTCircle}}"OpeningSMRTCircle}}"CostStage 6 (under construction, to be ready by 1H 2026)Circle Line ExtensionContinues onto Promenade.
Dhoby Ghaut[[File:DhobyGhaut-CCLPlatform.JPG120px]]
S$343.94 million
Stage 1 (CCL1)Contract 825
Bras Basah[[File:Bras Basah MRT Station, 2014 (04).JPGframeless120px]]rowspan="2"
Esplanade[[File:Esplanade-CCLStation.JPG120px]]
Promenade[[File:Promenade-CCLPlatform.JPG120px]]
[[File:Bus-logo.svg15pxlink=]]Marina Centre
Nicoll Highway[[File:NicollHighway-CCLPlatform.JPG120px]]rowspan="4"S$573 million
Contracts 824 and 828
S$273 million in sunk costs for Contract 824 (pre-collapse)
S$300 million for post-collapse works footed by Nishimatsu Construction Co. Ltd.
Stadium[[File:Stadium MRT station 110220.jpg120px]]
Mountbatten[[File:Mountbatten-CCLPlatform.JPG120px]]S$322 million
Stage 2 (CCL2)Contract 823
Dakota[[File:Dakota-CCLPlatform.JPG120px]]
Paya Lebar[[File:PayaLebar-CCLPlatform-TopView.JPG120px]]
MacPherson[[File:MacPherson-CCLPlatform.JPG120px]]S$356.1 million
Contract 822
S$338.6 million allocated to original contractors, S$17.5 million for completion works
Tai Seng[[File:CC11 Tai Seng MRT Platform.jpg120px]]rowspan="2"
Bartley[[File:CC12 Bartley MRT Platforms 20211002 124904.jpg120px]]S$63.5 million
Serangoon[[File:CCL Platform of Serangoon MRT Station.jpgframeless120px]]
[[File:Bus-logo.svg15pxlink=]]SerangoonS$155.95 million
Lorong Chuan[[File:CC14 Lorong Chuan MRT Platforms 20211009 124608.jpg120px]]S$65.0 million
Bishan[[File:CC15 Bishan MRT Platforms 20201213 144736.jpg120px]]
[[File:Bus-logo.svg15pxlink=]]Bishantitle=$313m Circle Line contracts awardedwork=The Straits Timesdate=1 August 2003page=10}}
Marymount[[File:CC16 Marymount Platform A.jpg120px]]S$167.7 million
Caldecott[[File:CC17 Caldecott Platform.jpgframeless120px]]S$391.59 million
Stage 4 (CCL4)Contract 854
*Bukit Brown*[[File:CC18 Bukit Brown shell station tunnel 2.jpgframeless120px]]
Botanic Gardens[[File:CC19 Botanic Gardens MRT Station platform.jpg120px]]
Farrer Road[[File:CC20 Farrer Road Platform level.jpg120px]]rowspan="2"
Holland Village[[File:Interior of Holland Village MRT Station - 20111008.jpg120px]]S$399.91 million
Contract 855
Buona Vista[[File:Interior of the Circle Line section of Buona Vista MRT Station, Singapore - 20110820.jpg120px]]
[[File:Bus-logo.svg15pxlink=]]Buona Vista
[[File:Bus-logo.svg15pxlink=]]Ghim Moh
one-north[[File:CC23 one-north MRT Platforms 20201213 152045.jpg120px]]
Kent Ridge[[File:CC24 Kent Ridge Platform A.jpg120px]](early 2040s)
Haw Par Villa[[File:CC25 Haw Par Villa MRT Platforms 20220908 091744.jpg120px]]rowspan="4"S$335 million
Stage 5 (CCL5)Contract 856
Pasir Panjang[[File:Platform level of Pasir Panjang MRT Station, Singapore - 20111002.jpg120px]]
Labrador Park[[File:CC27 Labrador Park Platform B.jpg120px]]
Telok Blangah[[File:CC28 Telok Blangah Platform A.jpg120px]]
HarbourFront[[File:CC29 Harbourfront MRT Platform B 20210426 173317.jpg120px]]
[[File:Bus-logo.svg15pxlink=]]HarbourFront
Keppel[[File:CC30 Keppel MRT construction 20201030 155444.jpg120px]]rowspan="2"url=https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/9/2/lta-awards-first-three-civil-contracts-for-circle-line-6.htmlarchive-url=https://web.archive.org/web/20200305132849/https://www.lta.gov.sg/content/ltagov/en/newsroom/2017/9/2/lta-awards-first-three-civil-contracts-for-circle-line-6.htmlurl-status=deadarchive-date=5 March 2020title=LTA News Room News Releases LTA Awards First Three Civil Contracts for Circle Line 6date=5 March 2020access-date=5 March 2020}}Contract 882
Cantonment[[File:CC31_Cantonment_MRT_construction_site_20201030_152717.jpg120px]]S$205 million
Contract 883
Prince Edward Road[[File:CC32 Prince Edward Road MRT construction site 20201030 145716.jpg120px]][[File:Bus-logo.svg15pxlink=]]Shenton WayS$310.8 million
Contract 885
Marina Bay[[File:CE2 Marina Bay Platform A.jpg120px]]
S$348.4 million
Contract 901
Bayfront[[File:CE1 Bayfront Platform B.jpg120px]]S$463 million
Contract 906; cost shared with DTL

The Circle Line's numbering scheme reserves station code "CC18" for future use.

Depots

SMRTCircle}}"Depot name;
LinesSMRTCircle}}"LocationSMRTCircle}}"ImagesSMRTCircle}}"Line-specific
stabling capacitySMRTCircle}}"CostSMRTCircle}}"Opening
Hougang[[File:CCL Kim Chuan MRT Depot entrance 20201024 122424.jpg100px]]70 trains *(until 2026)*
133 trains *(from 2026)*S$1.507 billion4 March 2009;

Rolling stock

The rolling stock for the Circle Line uses electric multiple unit (EMU) trains operating in a three-car configuration, with four doors per side on each carriage and can accommodate of up to 931 passengers in each trainsets. It consists of 40 first-generation Alstom Metropolis trains were supplied under contract C830. They are built in France by Alstom between 2006 and 2008. They are stabled at Kim Chuan Depot, which was the world's largest underground depot when it opened in 2009. To increase the capacity of the Circle Line, an additional 24 second-generation Alstom Metropolis trains were supplied under contract C830C, a similar in design to the first-generation trains, were delivered to Singapore from July 2014. They are also built in Shanghai, China by Alstom between 2014 and 2016. To facilitate the extension of the line with the construction of Stage 6, a tender for additional trains for the line was published on 31 March 2017. To increase the capacity of the Circle Line for Circle Line Stage 6, an additional 23 third-generation Alstom Metropolis trains were supplied under contract C851E with the first train set arrived in Singapore on 11 March 2022.

The automated CBTC system on board relies on "continuous two-way digital communication" between each controlled train and the control centre.

Train control

The Circle Line is equipped with Alstom Urbalis 300 Communications-based train control (CBTC) moving block signalling system on the MASTRIA system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO). The subsystems consist of Automatic train protection (ATP) to govern train speed, Iconis Automatic Train Supervision (ATS) to track and schedule trains and Smartlock Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.

Train Data Management System (TDMS) which concentrate and dispatch the rolling stock information with fixed equipment. The IAGO Waveguide communications network has the capability to transmit video and is almost maintenance-free. Base stations are located within the signalling equipment room.

Automatic platform screen doors supplied by Westinghouse provide safety for commuters, offering protection from arriving and departing trains.

References

  1. "Rail Reliability".
  2. (25 September 2025). "First JRL train arrives in Singapore; has wider doors, smaller carriages: LTA". The Straits Times.
  3. (20 February 2002). "ALSTOM chosen for the world's longest fully automated metro line in Singapore". railway-technology.com.
  4. (4 November 1989). "Circle line 'needed with 4 million people'".
  5. Lam, Jenny. (16 October 1997). "Plans for new Marina train line are rolling". [[The Business Times (Singapore).
  6. (12 June 1998). "Signing of E&M contracts ceremony".
  7. (25 November 1999). "6 stations". The New Paper.
  8. (25 November 1999). "6 stations for Marina line's first phase". The Straits Times.
  9. (25 November 1999). "Marina rail line to be scaled back". The Business Times.
  10. (2012). "The Circle Line, Linking All Lines". Land Transport Authority.
  11. (28 April 2001). "Circle Line and Kallang/Paya Lebar Expressway".
  12. (20 January 2003). "Circle Line Stage 3".
  13. (13 December 2003). "Completing the Circle via Holland V".
  14. "News 5 Tonight (12 December 2003)".
  15. (8 August 2001). "Appointment Of Operator For The Circle Line".
  16. "Circle Line Station Names LTA Announces Finalised Names For Circle Line Stages 1-3 Stations And Seeks Views On Names For Circle Line Stages 4 And 5 Stations".
  17. "Finalised Names For Circle Line (CCL) Stages 4&5 Stations".
  18. (7 November 2005). "Station Names For Circle Line Stages 4 And 5".
  19. "MOT Singapore – Gain new perspectives on land, sea & air transport".
  20. (2012). "The Circle Line, Linking All Lines". Land Transport Authority.
  21. "Circle Line could cost taxpayers $10 billion". AsiaOne Motoring.
  22. [http://www.straitstimes.com/Free/Story/STIStory_157967.html "Circle Line will exceed $6.7b budget"] {{Webarchive. link. (13 November 2007 Christopher Tan, [[The Straits Times]], 15 September 2007)
  23. (28 May 2009). "Part of Circle Line opens today". ChannelNewsAsia.
  24. "Early Opening for Circle Line from Bartley to Marymount".
  25. (17 August 2009). "LTA completes final tunnelling work on Circle Line". Channel News Asia.
  26. (17 August 2009). "Circle Line: The longest dig". The Straits Times.
  27. "Welcome Remarks By Mr Raymond Lim At The Opening Of The Circle Line From Dhoby Ghaut To Bartley on 16 April 2010".
  28. "Circle Line from Bartley to Dhoby Ghaut to Open 17 April".
  29. "Connect - October 2011".
  30. "Speech by Mr Tharman Shanmugaratnam at the Circle Line Opening Ceremony on 7 Oct 2011".
  31. "Circle Line from Marymount to HarbourFront to open".
  32. (2 August 2011). "Train crowding to ease with launch of full Circle Line: Minister Lui".
  33. "The extension on Circle Line opens with two events held concurrently at Bayfront Station and Esplanade Xchange".
  34. "Speech by Mr Lui Tuck Yew at the Opening Ceremony of the Circle Line Extension on 13 January 2012".
  35. "Circle Line and Tuas West Extension updates".
  36. (May 2023). "Speech by Mr Lui Tuck Yew at the Downtown Line 3 Groundbreaking Ceremony".
  37. "Factsheet: Completion of Circle Line 6 Tunnelling Works".
  38. (17 January 2013). "Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013".
  39. "Circle Line 6 - Projects - Public Transport - Land Transport Authority".
  40. "Tender information {{!}} Land Transport Authority".
  41. "Tender information {{!}} Land Transport Authority".
  42. "Tender information {{!}} Land Transport Authority".
  43. "LTA Invites Public to Suggest MRT station Names for Circle Line 6 stations {{!}} Press Room {{!}} Land Transport Authority".
  44. (15 May 2017). "Wanted: Names for 3 new Circle Line stations".
  45. (28 September 2018). "Excavation for Circle Line 6 to start in middle of next year". The Straits Times.
  46. "First CCL6 contracts awarded by LTA". ChannelNewsAsia.
  47. (8 September 2017). "Construction of Circle Line 6 to start by end of 2017, first three civil contracts awarded". [[The Straits Times]].
  48. "Speech by Minister For Transport Mr Ong Ye Kung at MOT Committee of Supply Debate 2021 on A Tale of Three Connections".
  49. Tan, Christopher. (12 January 2022). "Tunnelling works for Circle Line MRT extension completed".
  50. (12 January 2022). "Circle Line 6 tunnelling works complete, 3 new stations set to open in 2026".
  51. (12 January 2022). "Factsheet: Completion of Circle Line 6 Tunnelling Works".
  52. Kok, Yufeng. (6 December 2024). "Hume MRT station to open in Q2 2025; Circle Line Stage 6 to be ready in first half of 2026". [[The Straits Times]].
  53. (13 May 2005). "COMMITTEE OF INQUIRY CONCLUDES STRING OF CRITICAL DESIGN ERRORS CAUSED COLLAPSE AT NICOLL HIGHWAY.".
  54. (2012). "The Circle Line, Linking All Lines". Land Transport Authority.
  55. [http://www.straitstimes.com/Free/Story/STIStory_150531.html "Stop-work order at Telok Blangah site is fourth this year on $6.7b MRT project"] {{Webarchive. link. (9 June 2008 T. Rajan, [[The Straits Times]], 22 August 2007)
  56. [http://www.channelnewsasia.com/stories/singaporelocalnews/view/349771/1/.html "Road above Circle Line construction site caves in"] {{Webarchive. link. (26 May 2008 CNA Live, [[Channel NewsAsia]], 24 May 2008)
  57. (13 January 2026). "Commuters urged to plan alternative routes ahead of scheduled 3-month Circle Line disruption". [[CNA (TV network).
  58. (8 January 2026). "Train service changes on Circle Line as tunnel strengthening works begin on Jan 17". [[The Straits Times]].
  59. "Train Service Adjustments to Circle Line for Tunnel Works". [[Land Transport Authority]].
  60. (2 December 2025). "CNA Explains: What is 'tunnel squatting' and how does it affect MRT operations?". [[CNA (TV network).
  61. Sim, Fann. (2 August 2011). "Train crowding to ease with launch of full Circle Line: Minister Lui".
  62. "Bishan MRT Circle Line 'human flood' photo sparks buzz".
  63. "Four more trains for Circle Line as ridership rises (27 June 2015)".
  64. (12 March 2025). "Forum: Look at rejuvenating Circle Line too".
  65. (10 May 2022). "Bishan Circle Line MRT platform was filled with morning rush hour commuters".
  66. (24 March 2025). "More trains and system upgrades for Circle Line".
  67. "Circle Line 6 tunnelling works complete, 3 new stations set to open in 2026".
  68. "LTA {{!}} Getting Around {{!}} Public Transport {{!}} Rail Network {{!}} Circle Line".
  69. "Is the Circle Line yellow or orange? LTA & SMRT have an answer.".
  70. "Project LTA C825 {{!}} STECS".
  71. "LTA Annual Safety Award Convention 2005".
  72. (7 August 2001). "Award Of Second Civil Works Contract For The Marina Line".
  73. "Civil Works Contract Awarded For The Marina Line".
  74. "Marina Mass Rapid Transit (MRT) Line (C824 – Design and Build Tender)".
  75. "Lum Chang - Civil & Infrastructure".
  76. "CPG Consultants - Circle Line Stage 2 - Geotechnical and Structural Engineering Consultancy Services (Contract 823)".
  77. (4 February 2009). "Projects - Rail".
  78. "Lum Chang Technical Brochure".
  79. (4 Feb 2009). "Projects - Rail".
  80. "LTA may replace Circle Line contractor".
  81. Yeo, Richard. (2007-09-19). "Property Highlights of Singapore: Local Firm To Finish 2 Circle Line Stations".
  82. (5 Aug 2008). "Projects - Rail".
  83. (31 July 2003). "Award Of Contracts For Stage 3 Of Circle Line".
  84. "Project LTA C852".
  85. (27 June 2003). "Award Of Contracts For Stage 3 Of Circle Line".
  86. (5 August 2008). "Projects - Rail".
  87. (1 August 2003). "$313m Circle Line contracts awarded". The Straits Times.
  88. "Award Of Contract For Construction And Completion Of Adam And Farrer Stations".
  89. "Singapore LTA CCL4 C855".
  90. "Award of Contract for Construction And Completion of Holland, Buona Vista And NUH Stations".
  91. "Senior Planning Engineer, Shimizu, Taisei, SK E&C, Mass Rapit Transit Project - Construction of Station and Tunnel | dedicated to Project Controls".
  92. (5 March 2020). "LTA {{!}} News Room {{!}} News Releases {{!}} LTA Awards First Three Civil Contracts for Circle Line 6".
  93. (5 March 2020). "First Circle Line 6 contracts worth S$1.75b awarded by LTA - CNA".
  94. "Circle Line 6".
  95. (20 September 2019). "Circle Line's Cantonment MRT station contract goes to China State Construction for $205m, Transport News & Top Stories - The Straits Times".
  96. (10 November 2017). "News Room - News Releases - LTA Awards Final Construction Contract for Circle Line 6".
  97. (12 June 2020). "Upcoming Projects - Rail Expansion - Circle Line 6".
  98. (5 March 2020). "LTA {{!}} News Room {{!}} News Releases {{!}} LTA Awards Construction Contract for Circle Line 6 Prince Edward Station and Tunnels".
  99. (5 March 2020). "Prince Edward MRT station contract awarded to China Railway Tunnel Group, Transport News & Top Stories - The Straits Times".
  100. "Award Of Contract For CCL Marina Bay Station".
  101. "Projects".
  102. "List of contracts awarded for Downtown Line 1".
  103. Shereena Sajeed. (4 March 2009). "World's largest underground depot opens in Singapore". Channel News Asia.
  104. (5 March 2020). "LTA {{!}} News Room {{!}} News Releases {{!}} Joint Release by the Land Transport Authority (LTA) & SLA - Circle Line 6 – Becoming A Full Circle".
  105. (5 March 2020). "Biggest underground train depot set to become even bigger, Transport News & Top Stories - The Straits Times".
  106. (8 December 2019). "Alstom in Singapore".
  107. (4 May 2012). "Tuas West Extension Groundbreaking Ceremony Speech". Land Transport Authority.
  108. link. (27 May 2011)
  109. (30 October 2015). "Biggest underground train depot set to become even bigger".
  110. (1 February 2012). "LTA and SMRT Award Contracts for New Trains and Re-Signalling Project". Land Transport Authority.
  111. (3 February 2012). "Alstom to supply 34 Metropolis trains and upgrade signaling on the system".
  112. "Tender information {{!}} Land Transport Authority".
  113. (11 March 2022). "New train for Circle Line MRT arrives in Singapore; first of 23 to be shipped here {{!}} The Straits Times". The Straits Times.
  114. "Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world".
  115. "URBALIS Evolution: Controlling the Performance".
  116. "Global Project Portfolio".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Circle Line (Singapore) — get instant answers, deeper analysis, and related topics.

Research with Mako