Chengdu Metro

Rapid transit system of Chengdu, Sichuan, China


Rapid transit system of Chengdu, Sichuan, China

FieldValue
nameChengdu Metro
imageChengdu Rail Transit icon.svg
imagesize120px
image2458 reversing at Xihe (20250404125547).jpg
caption2A line 4 train at Xihe station
imagesize2275px
ownerCity of Chengdu
localeChengdu, Sichuan, China
transit_typeRapid transit
lines17 (1 tram line excluded){{Cite newsdate=2024-12-19author=成都地铁title=8号线二期、27号线一期正式开通,成都都市圈轨道交通线网里程超670公里!url=
stations449 (36 tram stations excluded)
ridership5.967 million (Jan.-Jun. 2024)
8.322 million (Peak)
annual_ridership2.11 billion (2023)
began_operation
( Public Trial)
operatorChengdu Rail Transit Group
website
system_length721.3 km (excluding Chengdu Tram)
760.6 km (including Chengdu Tram)
track_gauge
eland
map[[File:Chengdu Metro Network en.png200px]]
map_statecollapsed

https://www.chengdurail.com/info/1151/56032.htm}} 8.322 million (Peak) ( Public Trial) 760.6 km (including Chengdu Tram) The Chengdu Metro is the rapid transit system of Chengdu, the capital of Sichuan, China. The system opened with Line 1 on 27 September 2010, and the system now has fifteen subway lines and one light rail line. It has subsequently undergone rapid expansion. Since the opening of Lines 6, 8, 9, and 17 on 18 December 2020, the Chengdu Metro is the 4th longest metro system in the world.

There are currently (September 2025) 17 operating subway lines totaling 721.3 km of track, and 1 tram line (Line T2) covering 39.3 km. The Chengdu Metro serves about 6 million trips per day. As of 2021, about 2.2 million and 4.6 million people live within 500 and 800 m of a subway station in Chengdu, respectively.

Operating network

There are 17 subway lines covering 721.3 km with 449 stations, and a light rail line with 36 stops (Line T2) covering 39.3 km.

[[File:Chengdu Metro Network en.png550pxthumbcenterChengdu Metro Network]]
LineTerminals
(District/County)CommencementNewest
ExtensionLength
kmStations
**Weijianian**
(Jinniu)**Science City**
(Shuangliu)2010201841.00
**Wugensong**
(Shuangliu)
**Xipu**
(Pidu)**Longquanyi**
(Longquanyi)2012201442.27
**Chengdu Medical College**
(Xindu)**Shuangliu West Station**
(Shuangliu)2016201849.89
**Wansheng**
(Wenjiang)**Xihe**
(Longquanyi)2015201743.48
****
(Xindu)****
(Shuangliu)201949.01
**Wangcong Temple**
(Pidu)**Lanjiagou**
(Shuangliu)202068.88
(loop line)**Cuijiadian**
(Chenghua)**Cuijiadian**
(Chenghua)201738.63
**Guilong Road**
(Chenghua)**Longgang**
(Shuangliu)2020202436.71
**Financial City East**
(Jinjiang)**Huangtianba**
(Qingyang)202022.18
****
(Wuhou)****
(Xinjin)2017202543.88
****
(Qingyang)**Long'an**
(Longquanyi)202529.07
**Jiujiang North**
(Shuangliu)****
(Chenghua)2020202531.47
**South Railway Station**
(Wuhou)****
(Jianyang)202069.99
**Jinxing**
(Wenjiang)**Tianfu Station / **
(Tianfu New Area) / (Jianyang)2020202363.31
**Shifo**
(Xindu)**Shuxin Road**
(Qingyang)202424.86
****
(Shuangliu)****
(Longquanyi)202527.96
**Futian**
(Jianyang)**Ziyang Bei Station**
(Yanjiang, Ziyang)202438.7
**Total****721.3****449**

Line 1

Main article: Line 1 (Chengdu Metro)

The first phase of Line 1 cost 7 billion yuan to construct. A natural ventilation system has been used in the underground section of Line 1 on the subway system from Southern Third Ring Road to Jincheng Plaza Station. Square ventilation units are built every 30 m along the subway top to allow fresh air from the ground enter the construction site underground. The method is used in subway construction in other countries as it cuts the construction cost and it saves energy. The subway system is the first in China to adopt such a ventilation system during construction. Chengdu Metro is planning to set up a section for subway fire control and introduce the latest fire fighting technologies and vehicles. Line 1's color is dark blue.

Line 2

Main article: Line 2 (Chengdu Metro)

Line 2 is a crosstown northwest–southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on 16 September 2012. An 11 km long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014. Line 2's color is orange.

Line 3

Main article: Line 3 (Chengdu Metro)

Line 3 runs in a northeast–southwest direction from Chengdu Medical College to Shuangliu West Station. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016. It was Chengdu's final line to use the lower capacity type B trains, subsequent lines favoring the longer and wider Type A cars. Line 3's color is magenta.

Line 4

Main article: Line 4 (Chengdu Metro)

Line 4 is the third line to enter revenue service on the metro network in Chengdu, Sichuan. Line 4 runs in an east–west direction, stretching from Wansheng in Wenjiang to Xihe in the Longquanyi. The first phase started construction on 22 July 2011, and began operation on 26 December 2015. Testing began on the east of west extensions of Line 4 as part of Phase II expansion on 10 December 2016. Line 4's color is green. It was the first line to use the longer and wider Type A trains, which are higher capacity.

Line 5

Main article: Line 5 (Chengdu Metro)

Line 5 is a crosstown north–south trunk line. Despite being numbered such, it was the seventh line to open, having started operation on 27 December 2019. Line 5's color is purple.

Line 6

Main article: Line 6 (Chengdu Metro)

Line 6 is a crosstown northwest–south-west pivotal line. It is the second longest metro line in Chengdu. It has more stations than any other metro line in China, with 54 currently plus two more infill stations coming later. It is one of the four lines to have started operation on 18 December 2020. Line 6's color is brown.

Line 7

Main article: Line 7 (Chengdu Metro)

Line 7 is a loop line which runs around downtown Chengdu. Despite the number, it was actually the sixth line to open, having started operation on 6 December 2017. Line 7's color is sky blue.

Line 8

Main article: Line 8 (Chengdu Metro)

Line 8 is a crosstown northeast–southwest metro line. It connects the Wangjiang and Jiang'an campuses of Sichuan University. Phase 1 began operation on 18 December 2020, the same day as lines 6, 9, and 18. Phase 2 opened on 19 December 2024. Line 8's color is chartreuse.

Line 9

Main article: Line 9 (Chengdu Metro)

Line 9 is planned to be the system's second circle line when it is fully completed according to plan. It is the first driverless metro line in Mid/West China. Phase 1 started operation on 18 December 2020. Line 9's color is bright orange.

Line 10

Main article: Line 10 (Chengdu Metro)

Line 10 serves Chengdu Shuangliu International Airport. It started operation on 6 September 2017. It was also the first line in the system to use the higher-capacity type A trains. Line 10's color is blue.

Line 13

Main article: Line 13 (Chengdu Metro)

Line 13 is a metro line in Central Chengdu. It started operation on 16 December 2025.

Line 17

Main article: Line 17 (Chengdu Metro)

Line 17 is a metro line in Central Chengdu. Phase 1, including phase 1 of line 19, started operation on 18 December 2020. On 22 September 2023, the Jinxing-Jiujiang North section was integrated into Line 19. Like line 18 is uses a special variant of Type A trains with one less door per side and using 25 kV AC overhead power, as opposed to the "standard" 1500 V DC most newer metros in China use. Line 17's color is pale green.

Line 18

Main article: Line 18 (Chengdu Metro)

Line 18 is the first express metro line in the city. It parallels the southern section of Line 1 serving Tianfu New Area. It started operation on 27 September 2020. Phase 2 started operation on 18 December 2020. It is the third longest metro line in China after Chongqing Line 6 being the longest and Shanghai Line 11 in second place. It is still however the longest line that does not have any branches. Like line 17, it uses a special variant of Type A trains with one less door per side and using 25 kV AC overhead power. Line 18's color is teal.

Line 19

Main article: Line 19 (Chengdu Metro)

Line 19 is an express metro line linking Shuangliu International Airport and Tianfu International Airport. It partly shares the track with Line 18 between Tianfu Station and Tianfu Airport North. It started operation on 22 September 2023. Line 19's color is light purple.

Line 27

Main article: Line 27 (Chengdu Metro)

Line 27 is connects several northern regions of the city. It's the city's second metro line that use driverless trains. Line 27's color is light blue.

Line 30

Main article: Line 30 (Chengdu Metro)

Line 30 links Shuangliu International Airport and Longquanyi Railway Station. The metro station (Longquanyi Railway Station South) is located at the south side of the Longquanyi Railway Station (formerly known as Shilingnan Railway Station). It started operation on 16 December 2025. Despite its number, it was only the sixteenth line to open.

Line S3

Main article: Line S3 (Chengdu Metro)

Line S3 is an express metro line linking Futian in Jianyang, Chengdu to Ziyang North Railway Station in Ziyang. It is the first intercity rapid transit line of Chengdu Metro system. It started operation on 29 September 2024. Line S3's color is grey.

Tram Line 2

Main article: Line 2 (Chengdu Tram)

Chengdu Tram Line 2 serves the north-west part of the city without a metro line. The line uses low-floor trams derived from the Alstom Citadis. Tram Line 2's color is light green.

History

Evolution of the Chengdu Metro

Inception

In 1985, the Chengdu Planning Bureau set up an integrated transportation planning office which began the process of the planning for a rapid transit network for Chengdu. By 1992, a proposal for the subway was sent to the National Planning Commission and was subsequently rejected. In 2004 before the approval of the National Development and Reform Commission Chengdu started reconstructing Tianfu Square with provisions for Tianfu Square station. The first phase of Chengdu Metro, consisting of Lines 1 and 2, were approved by the NDRC on 11 September 2005.

First phase projects

2005

  • Line 1 construction commenced on 28 December 2005.

2007

  • Construction of Line 2 began on 29 December 2007.

2009

  • In May 2009, the National Development and Reform Commission (NDRC) approved western and eastern extensions of Line 2, along with the first phase of Lines 3 and 4.

2010

  • Line 1 opened on 27 September 2010.

2011

  • Construction of the first phase of Line 4 started on 22 July 2011.

2012

  • On 25 April 2012, Line 3 received approval from the NDRC.
  • On 16 January 2012, the NDRC officially approved the southern extension of Line 1.
  • Line 3 construction began on 28 April 2012.

2013

  • On 8 June 2013, Line 2 West Extension to Xipu and Ocean Park Station on Line 1 opened; Ocean Park was later renamed Jincheng Plaza.

2014

  • On 26 October 2014, Line 2 East Extension to Longquanyi opened.

2015

  • On 25 July 2015, Line 1 South Extension opened.
  • On 10 December 2015, Line 4 Phase 1 opened.

2016

  • On 31 July 2016, Line 3 Phase 1 was opened, marking the completion of the first phase.

Second phase projects

2009

  • In May 2009, the National Development and Reform Commission (NDRC) approved the second phase of expansion for the Chengdu Metro, encompassing Line 1 Phase 3, Line 3 Phase 2 and 3, Line 4 Phase 2, Line 5 Phase 1 and 2, Line 6 Phase 1, Line 7, Line 10 Phase 1, and Line 18. The total length of Phase 2 amounted to 183.3 km of new subway infrastructure.

2014

  • On 4 June 2014, construction commenced for Line 10 Phase 1.

2015

  • In August 2015, construction began for Line 5 Phase 1.

2017

  • On 28 February 2017, the first tunnel boring machine for Line 18 was launched.
  • On 2 June 2017, Line 4 Phase 2 was opened.
  • On 6 September 2017, Line 10 Phase 1 was opened.
  • On 6 December 2017, Line 7 was opened.

2018

  • On 18 March 2018, Line 1 Phase 3 was opened.
  • On 26 December 2018, Line 3 Phase 2 and 3 were opened.

2019

  • In November 2019, Chengdu Metro introduced new signage branding coinciding with the opening of Line 5.
  • On 27 December 2019, Line 5 and Line 10 Phase 2 were opened.

2020

  • On 27 May 2020, Line 6 began testing.
  • On 2 June 2020, Line 18, the largest Public-Private Partnership (PPP) project in China, commenced its 3-month trial operation.
  • On 6 August 2020, Line 18 completed its fire-prevention assessment.
  • On 27 September 2020, Line 18 Phase 1 was opened.
  • On 18 December 2020, Line 6 Phases 1 to 3, Line 8 Phase 1, Line 9 Phase 1, Line 17 Phase 1, and Line 18 Phase 2 were opened, marking the completion of Phase 2 and 3 projects. With these openings, Chengdu Metro updated the wayfinding in all stations, introducing alpha-numeric station identifiers, and installed new LCD passenger information systems.
  • In 2020, with the opening of Line 6, Line 18 and other lines, Chengdu Metro refreshed the wayfinding in all stations with alpha-numeric station identifiers. In addition, new LCD passenger information systems, such as "comprehensive information screen" LCD, in station concourses and on screen doors at some stations.

2022

  • On 16 February 2022, in response to noise issues on Line 5, operational speed limits were imposed on the to to sections, with an average speed of 60 km/h, to minimize noise impact on the environment and neighboring areas.

Third phase projects

2016

  • On 11 July 2016, the National Development and Reform Commission (NDRC) approved the third phase of Chengdu Metro's expansion plan. This phase included Line 6 Phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1, and Line 18. Simultaneously with the second phase, the construction of the third phase commenced.
  • On 16 August 2016, Line 18's construction officially started.
  • On 31 December 2016, construction began for Lines 8, Line 9, and Line 10 Phase 2.

2017

  • On 27 February 2017, Line 17 Phase 1 construction was initiated.

2019

  • On 19 February 2019, Chengdu received its first-ever subway train capable of GoA4 ATO for Line 9.
  • On 30 July 2019, the tunnel boring machine completed tunneling for Line 9 between Chengdu West Railway and Huangtianba Stations.
  • On 5 August 2019, all stations on Line 17 Phase 1 completed the construction of main structures and roofing.

2020

  • On 14 January 2020, the last section of track was laid for all of Line 9 Phase 1, between Sanyuan Station to Jincheng Avenue Station.
  • On 11 April 2020, Chengdu Metro reported the completion of track-laying for Line 8.
  • On 19 June 2020, both Line 9 and Line 17 started their 3-month trial operations.
  • On 24 June 2020, the construction of Wutongmiao Temple Depot for Line 17 was completed.
  • On 8 July 2020, Line 6 Phase 1 and 2 were officially powered on.
  • On 17 July 2020, the construction officially started for the 4 stations on Line 30 in Longquanyi District.
  • On 8 August 2020, Line 8's whole line power network passed quality assessment.
  • On 18 December 2020, Line 6 Phase 1/2/3, Line 8 Phase 1, Line 9 Phase 1, Line 17 Phase 1, and Line 18 Phase 2 were opened, marking the completion of Phase 2 and 3 projects. This milestone also positioned the Chengdu Metro as the fourth largest subway system globally with over 500 km of operating subway routes after 15 years of rapid growth.

Fourth phase projects

2019

  • On 17 June 2019, the NDRC approved the fourth phase expansion for the Chengdu Metro. It includes Line 8 Phase 2, Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1. The Fourth Phase encompasses 176.65 km of new lines.

2020

  • On 18 March 2020, construction commenced on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.
  • On 11 April 2020, construction began on Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, and Line 19 Phase 2.
  • On 18 May 2020, Line 8 Phase 2, Line 27 Phase 1, and Line 30 Phase 1 started construction, marking the commencement of all Fourth Phase projects.
  • On 17 July 2020, construction officially began for the last 4 stations on Line 30 in Longquanyi District.
  • On 27 November 2020, construction officially started for Line S3, a connection line between Chengdu and Ziyang.

2021

  • On 2 April 2021, Chengdu Metro reached a ridership of 7 million per day for the first time.

2022

  • On 16 December 2022, Line 13 Phase 1 completed the tunnel construction from Sanguantang to Jiuyanqiao Section, marking the success of the longest underwater/river tunnel work in Chengdu Metro history.
  • On 22 December 2022, Line 30 Phase 1 completed the structure construction of Jiaozi Flyover.
  • In December 2022, Line 30 Phase 1 completed the water/cable/pipe reroute for Financial City North station, marking the station's main structure construction entering the next stage.
  • In December 2022, Chengdu Metro's deepest and first 4-line transfer station, Luomashi, finished digging. Line 18 Phase 1's platform is 45.5 meters deep, with Chengdu North to Luomashi's deepest tunnel at 48.8 meters, equivalent to 16 floors underground. Luomashi serves Line 1, Line 4, Line 10, and Line 18.

2023

  • On 13 January 2023, all 15 stations of Line 13 Phase 1 finished structural construction. The line's tunnel is 62% complete, and the railroad is 10% complete.
  • On 12 February 2023, Line 19 Phase 2 was officially powered on.
  • On 17 February 2023, Line 30 Phase 1 from Terminal 2 of Shuangliu International Airport East to Sisheng section's left tunnel was finished, marking the completion of the 18th tunnel.
  • On 21 February 2023, Line 19 Phase 2's signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.
  • On 22 February 2023, Line 17 Phase 2 finished Jinxing station's main power centre's land clearance.
  • On 20 March 2023, Line 19's Changshun Villige Depot (长顺村停车场) was handed over to the operation.
  • On 21 March 2023, Line 27 finished all station construction.
  • On 26 March 2023, Line 18 increased express service from 6 to 16 trains to meet the increasing needs for Chengdu Tianfu International Airport and daily commuters. Line 18 also increased 58 trains daily, with 36 trains for Airport Express Service.
  • On 27 March 2023, Line 8 Phase 2 finished tunnel work for the Longgang to Lianhua section. Line 8 Phase 2 entered the railroad construction, electrics, and refurbishment stage.
  • On 28 March 2023, Line 19 Phase 2 finished the 160 km/h high-speed train testing, entering 1–2 months of systematic testing.
  • On 28 March 2023, the Chengdu Rail Transit 2023 Annual Media Gala was held in Wenjiashan Station on Line 19.
  • On 29 March 2023, construction for the left tunnel between Baotai Avenue and Changhong Square on Line S3 finished.
  • On 30 March 2023, the tunnel boring machine used for the Jiuyanqiao-Xinnanmen section of Line 13 makes a breakthrough.
  • On 30 March 2023, Line 19 Phase 2 finished construction and is handed over to the operation team for operational testing.
  • On 30 March 2023, Chengdu Metro and Shanghai Metro's QR Code ticketing systems were officially unified and connected.
  • On 31 March 2023, Line 30 Phase 1's Gaobeiba Depot (高碑坝车辆段) was powered on.
  • From January to March 2023, Chengdu Metro TOD initiated four new land projects covering 200,000 square meters, along with 23 TOD projects and 38 new construction project sections.
  • On 26 May 2023, all 45 trains of Line 19 Phase 2 were delivered.
  • On 31 May 2023, Line S3 (Ziyang Line) began mechanical and electrical work after completing line construction.
  • On 11 September 2023, Line 30 Phase 1's longest station - - finished structure construction, marking the 23rd station to complete structure contraction.
  • On 17 September 2023, the original Line 17 Phase 1 (Jinxing - Jitouqiao) split into Line 19 Phase 1 (Jinxing - Jiujiang North) and new Line 17 (Jiujiang North - Jitouqiao). A 4-Car A-Train started operating on Line 17, and all passengers were required to transfer at the same platform at Jiujiang North between lines 17 and 19.
  • On 20 September 2023, Line 13's first train was finished. This marked Chengdu's second metro line to use driverless automatic trains.
  • On 22 September 2023, Line 30 Phase 1 finished tunnel construction.
  • On 26 September 2023, Line 18 and Line 19 began co-operational testing.
  • On 30 September 2023, Line 17 Phase 2's People's Park Station finished structure construction.
  • On 3 October 2023, Line 17 Phase 2's Qingshuihedaqiao-Huanhuali stations completed both tunnel construction.
  • On 28 November 2023, Line 19 Phase 2 opens, extending the line from Jiujiang North to Tianfu Station.

2024

  • On 8 April 2024, Line 6's Qingdao Road station was put into operation.
  • On 29 September 2024, Line S3 started operation.
  • On 19 December 2024, Line 27 and phase 2 of Line 8 started operation.

2025

  • On 17 September 2025, Line 10 Phase 3 (initial section) entered service, extending the line from Taipingyuan to Wuhou Shrine. Line 17 Phase 2 entered service, extending the line from Jitouqiao to Gaohong.
  • On 16 December 2025, Line 13 Phase 1 and Line 30 Phase 1 entered service.

Fifth phase projects

2023

  • On 13 January 2023, the Chengdu Government published the fifth phase expansion and the environmental assessment for Chengdu Metro. The Fifth Phase plan consists of 199.8 km of 10 new lines, including Line 5 Phase 3, Line 9 Phase 2, Line 10 Phase 4, Line 12 Phase 1, Line 16 Phase 1, Line 18 Phase 4, Line 20 Phase 1, Line 22 Phase 1, Line 23 Phase 1, and Line 27 Phase 2.
  • On 15 February 2023, Line S11 was approved by the Sichuan Development and Reform Commission.
  • On 30 March 2023, Line S11 (Chengdu - Deyang Line) started construction. This line is planned to open in 2026, consisting of a 70.84 km route with a 45.30 km elevated section, a 23.91 km underground section, and a 1.63 km transit section.
  • On 31 March 2023, Chengdu Metro reached 1 billion ridership, as a rider entered the gate at 15:29:16.
  • On 6 September 2023, Line S11 started construction at Banzhuyuan Station in Xindu.
  • On 6 September 2023, Chengdu Metro debuted Train Maintenance Bots (车辆巡检机器人), AI-Railway Maintenance Bots (轨道智能巡检机器人), and Power-line Surveillance AI (弓网在线监测装置) on Line 19. This marks the world's first AI-Maintenance Robot & System. Chengdu Metro aims to implement full AI-Operation by 2025.

Network expansion

Lines under construction

Map of Chengdu Metro plan (2025)

As of December 2025, these are the lines that have been approved and are under construction.

Est. OpeningLinePhaseTerminalsLength (km)StationsNotes
2025Phase 3Wuhou ShrineLuomashi0.573
Phase 3 North SectionNorth Railway StationSouth Railway Station10.994
Phase 3 Guanyan SectionTianfu International Airport NorthGuanyan2.571
2026Phase 1HonglianMeishan East Railway Station59.31513
2027Phase 1Deyang Railway StationWeijianian70.84516

Lines yet to start construction

The Chengdu Metro Phase 5 construction plan (2024-2029) was announced in 2023.

LinePhaseTerminalsLength (km)Stations
Phase 3HuilongYongan6.5
Phase 2Financial City EastHuangtianba45.0
Phase 4People's ParkBailianchi10.1
Phase 1DeyuanYujialaofangzi38.75
Phase 1HuaxibaShaba'er37.5
Phase 4North Railway StationFengtai 3rd Road7.1
GuanyanJianyang South Station
Phase 1YinglongBaihelin18.3
Phase 1LinjiangcunYinglong9.7
Phase 1Tianfu 1st RoadPanda Paradise24.8
Phase 2Shuxin RoadHuangtianba2.08

Long-term planning

In December 2020, Chengdu Municipal Bureau of Planning and Natural Resources announced the long-term planning including Lines 1-33, D1-D6 and S1-S19.

Fares

Single ride card

Single Ride Card is an IC card for one trip. Riders can buy it through attendants in station's Service Centers or use ticket-vending machines. One ticket allows only one rider in with validity of the same day. If riders have not used the Single Ride Card, they may refund it at the same day at the same station.

From its opening until 1 June 2017, Chengdu Metro used a fare system based on station counts. With a 2-hour grace period in the subway system. In October 2016, Chengdu Metro held public meeting for price changing issues and set new pricing plans.

Since 2 June 2017, Chengdu Metro has used a new fare system based on distance.

Distance (km)Distance to next price level (km)Total Price (CNY 元)
0~44¥2
4~84¥3
8~124¥4
12~186¥5
18~246¥6
24~328¥7
32~408¥8
40~5010¥9
When the trip is longer than 50 km, each additional 20 km requires another ¥1
Each rider has a 3-hour grace period in the system.

Reloadable IC cards

The Tianfutong Pass is a reloadable IC Card accepted by the Chengdu Metro. Normal Tianfutong Passes provide 10% discounts. Student Tianfutong Passes provide 50% discounts. Senior Tianfutong Passes have special discounts depending on time of use. Additionally, passengers can pay for single rides directly using Debit IC cards offered by participating banks.

EMV cards

On 28 July 2025, Chengdu Metro started accepting EMV payments for both domestic and international bank cards on all lines. Cards issued by Visa, Mastercard, American Express, and UnionPay are supported. Only Visa, MasterCard, American Express cards issued outside Mainland China are accepted. .This makes Chengdu only the third city in the Chinese mainland (after Beijing and Shanghai) that provides this ‘tap and ride’ service using both domestic and international bank cards.

Train types and technology

All "standard" Chengdu Metro lines in operation run on 1,500 V DC supplied by overhead lines. Express lines meanwhile run on 25 kV AC to get to top speed quicker. Trains on Lines 3, 4, 7, 10 and some of the newer Line 2 trains have a Golden Sun Bird insignia. New trains are equipped with LCD passenger information systems.

Signalling system

All Chengdu Metro lines are equipped with CBTC. Chengdu Metro Line 1, which opened to traffic in 2010, used a CBTC signaling system provided by Zhejiang Zhonghe Technology, a subsidiary of Zhejiang University, in collaboration with Ansaldo STS. This system is also used on Chengdu Metro Line 6 and 10. Chengdu Metro Line 3, which opened in 2016, was one of the first adoptions of a domestic CBTC signal system implementation by Beijing Traffic Control Technology. Beijing Traffic Control Technology's CBTC system is also used in Line 5. Alstom's Urbalis 888 CBTC signal system in collaboration with CASCO is used on Line 18, 19, Chengdu Light Rail Line 2 and the fully automated GoA4 Line 9.

Type A trains

In response to congestion and high ridership, Lines 7, 8 and 10 are equipped with higher capacity 6-car aluminum alloy Type A trains. The total length of 140 m and width is 3 m. All trains have a maximum operating speed of 80 km/h. The capacity of a 6-car train is 1,828 passengers with a crush load capacity of 2,488 passengers. Line 7 trains are designed and managed by CRRC Qingdao Sifang with CRRC Chengdu performing manufacturing and assembly. Lines 5, 6 and 9 are equipped with even higher capacity eight car aluminum alloy Type A trains. The capacity of an eight car trainset is 2,480 passengers with a crush load capacity of 3,456 passengers.

Type B trains

Lines 1, 2, 3 and 4 use six car stainless steel Type B trains with a total length of 120 m and width 2.8 m. The capacity of each train set is 1,460 people with a crush load capacity of 1,880 passengers. All trains have a maximum operating speed of 80 km/h. Lines 1 and 2 use CRRC Qingdao Sifang and CRRC Chengdu trains. Trains on Line 3 and 4 are manufactured by CRRC Changchun Railway Vehicles and CRRC Chengdu. In 2008, Chengdu Metro in anticipation of the opening of Line 1, purchased and initial order of 17 six car trains sets from CRRC Qingdao Sifang. In April 2011, a further order was announced for trains from CRRC for Line 2, taking the total to 59 six car sets.

Light rail trains

Currently, only Chengdu Light Rail Line 2 is in operation. Light Rail Line 2 uses low floor light rail trains provided by domestic manufacturer CRRC. The tram system uses light rail trains, of each having 5 cars and 8 doors. Chengdu Light Rail Line R2 opened to public on 26 December 2018 and extended on 27 December 2019. It is 39.3 km long, with 35 stations (47 station when completed). In early 2020, this line is included in the latest Chengdu Metro's official system map.

Other rail transit

High-speed intercity rail

There are also two high-speed intercity railways in Chengdu, not part of Chengdu Metro system: the Chengdu–Dujiangyan intercity railway and Chengdu–Pujiang intercity railway. They are operated by Chengdu Metropolitan Railway Company Limited, which is China's first joint venture between a local government and China's national rail operator. The city and the Ministry of Railways worked together in building high-speed intercity rail lines.

Network map

| frame-lat = 30.57 | frame-long = 104.02 | frame-width = 750 | frame-height = 470

Notes

References

References

  1. "1—6月成都地铁客运量10.86亿人次同比增长8.1%".
  2. (2025-01-01). "832.18万!启航新篇章!".
  3. (2024-03-08). "剑指3万亿!这个超大城市,凭什么?".
  4. "1—6月成都地铁客运量10.86亿人次同比增长8.1%".
  5. 袁弘. link. (2021-08-23)
  6. (2025-03-31). "干货分享丨城市轨道交通2024年度统计和分析报告".
  7. (2025-12-05). "成都轨道交通13号线一期、30号线一期工程以最高标准通过初期运营前安全评估".
  8. (2025-09-16). "官宣!9月17日,成都地铁双线齐开_四川在线".
  9. "13号线一期、30号线一期开通!成都轨道交通运营总里程突破750公里".
  10. Huang Zhiling and Bao Xinyan, ''[http://www.chinadaily.com.cn/english/doc/2005-12/29/content_507628.htm Work begins on new metro schemes]'', [[China Daily]], 2005-12-29
  11. link. (30 September 2007 '', Retrieved on 2007-03-13)
  12. link
  13. link
  14. link
  15. link
  16. link
  17. (27 September 2010). Xinhua News Agency. link
  18. (13 September 2012). link. Sichuan Online
  19. link
  20. http://www.chinadaily.com.cn/china/2010-09/27/content_11355596.htm, [[China Daily]], 2010-09-27
  21. (24 August 2010). link. Sichuan Online
  22. (22 July 2011). link. Sichuan Online
  23. (27 April 2012). link. 华西都市报
  24. (29 August 2012). link. 四川新闻网
  25. (27 April 2012). 新华网四川频道. link
  26. "地铁1号线南延线今日正式开通 天府新区半小时到市中心_本网最新_新闻首页_成都全搜索".
  27. link
  28. link
  29. link
  30. (2017-02-28). "国内设计时速最快 成都轨道交通18号线首台盾构机始发". 四川新闻网.
  31. (2017-06-02). link. Chengdu Metro
  32. (2017-09-06). [[163.com]] news Sichuan. link
  33. (2017-12-06). Sichuan Online. link
  34. (2018-03-18). Sichuan Online. link
  35. (2018-12-26). Sina Sichuan. link
  36. ""妈妈再也不用担心我'打不到方向'了"!".
  37. (2019-12-26). "明日 成都轨道交通三线齐开".
  38. 成都商报 (严丹 闫宇恒). "成都地铁6号线三期工程轨行区全面转入列车动车调试阶段".
  39. "成都轨道交通18号线首开段实现空载".
  40. 成都商报. (2020-08-07). "6号线、8号线、9号线、17号线、18号线 这些地铁线路今年开通". Sichuan Online.
  41. 中國新聞网. (2020-12-18). "成都地铁新开5条线 运营里程558公里".
  42. 爱你的. "迎接大运会,成都地铁每个车站有了"身份证号"!".
  43. 爱你的. "为了迎接18号线开通,火车南站再添新装备!(放大招,送票卡)".
  44. (2020-08-07). "关于成都地铁5号线幸福桥至廖家湾地铁噪音问题,已降低列车运行".
  45. link
  46. link
  47. 网易. link
  48. (2017-02-28). "成都地铁17号线一期开建 预计2020年通车". 网易.
  49. "厉害!成都首条无人驾驶地铁要来了!全自动无人驾驶列车亮相!".
  50. "中国西部首条全自动无人驾驶地铁线路——成都轨道交通9号线全线"洞通"".
  51. (2019-08-07). ["成都地铁17号线一期全线车站封顶"](http://www.wenjiang.gov.cn/wjzzw/wjxw/2019-08/07/content_e5853693078941c6b98defd90d00625d.shtml}}{{Dead link). 成都市温江区人民政府.
  52. (2020-01-24). "成都地铁9号线一期工程长轨通". 中国中铁.
  53. "8号线一期全线"轨通"!还有其他在建线路最新进展!".
  54. "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
  55. "成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
  56. "成都地铁6号线一二期工程"通电"啦".
  57. "喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点".
  58. 新浪网. (2020-08-12). "成都地铁8号线建设最新进展".
  59. (2019-06-17). "国家发展改革委关于成都市城市轨道交通第四期建设规划(2019-2024年)的批复".
  60. "成都市城市轨道交通第四期建设规划全面启动 未来5年再建8个地铁新项目-新闻-上海证券报·中国证券网".
  61. "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线".
  62. "成都地铁8号线二期、27号线一期、30号线一期开工 轨道交通第四期建设规划全部开工".
  63. "轨道交通资阳线年底前开工建设 预计2024年底通车试运营".
  64. (3 April 2021). "成都地铁单日客运量首次突破700万".
  65. (2022-12-21). "成都地铁再上新!首个四线换乘车站揭秘".
  66. (2022-12-21). "「四川全"拼"图」成都地铁30号线娇子立交站顺利封顶".
  67. "10号线三期、17号线二期、18号线三期……成都轨道交通9条在建线路进展→".
  68. "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"".
  69. (2022-12-21). "地铁19号线二期年内试运营!成都轨交建设最新进展".
  70. "成都地铁27号线一期全线车站主体结构顺利封顶".
  71. "赶飞机注意!成都地铁18号线快线时刻表公布→".
  72. "成都地铁18号线运力增长18%,还提供"地铁+机场"无障碍预约服务".
  73. "成都地铁8号线龙莲盾构区间顺利通过验收".
  74. "热滑完成!成都地铁19号线二期提前通车有望".
  75. "成都轨道交通19号线二期举办"开门评风"媒体交流活动".
  76. "成都地铁S3资阳线宝台大道站~苌弘广场站盾构区间左线顺利洞通!".
  77. "#成都轨道交通建设进展# 3月29日上午10时左右,伴随着盾构机刀盘缓缓破除玻纤桩驶入车站,轨道交通资阳线"同城一号"盾构机在苌弘广场站顺利出洞,标志着宝台大道站~苌弘广场站盾构区间左线顺利洞通,取得了阶段性的胜利。". weibo.
  78. (2023-01-13). "成成都地铁13号线九新区间顺利完成盾构吊装".
  79. "成都轨道交通19号线二期轨行区正式移交运营".
  80. "成都、上海轨道交通二维码实现互联互通".
  81. "#成都轨道交通建设进展# 30号线一期工程高碑坝车辆段110kV铜牧线顺利完成迁改送电。". weibo.
  82. "成都轨道交通19号线二期45列电客车全数交付".
  83. "轨道交通资阳线,预计明年9月通车!".
  84. "成都轨道线路最新进展:已有109座车站封顶 盾构累计掘进占总量的89%".
  85. (18 September 2023). "地铁17号线"一拆为二" 来看看会有哪些变化".
  86. (19 September 2023). "成都地铁19号线二期开通在即 17号线将在九江北站"分家"".
  87. "成都地铁13号线有最新消息 不止是一条全自动地铁线路".
  88. "成都地铁30号线一期工程全线洞通".
  89. "离开通再近一步!成都地铁19号线二期最新消息".
  90. 中铁广州工程局城建公司. (2023-09-29 ). "中铁广州局重点项目之成都地铁10号线项目". 中铁广州工程局城建公司.
  91. (2023-10-09). "【e周发声】第247期-成都轨道交通17号线清水河大桥站~浣花里站区间双线贯通".
  92. sina_mobile. (2023-11-27). "官宣!11月28日,成都地铁19号线二期开通初期运营!".
  93. (2024-04-08). "4月8日!6号线青岛路站正式开启运营服务".
  94. (2024-09-29). "今天!S3(资阳)线开门迎客!".
  95. (2024-12-19). "8号线二期、27号线一期正式开通,成都都市圈轨道交通线网里程超670公里!".
  96. (2025-09-16). "明天,成都地铁17号线二期、10号线三期齐开".
  97. (2025-12-16). "成都地铁13号、30号线一期正式通车!".
  98. (2023-01-13). "成都轨道交通第五期规划最新公示".
  99. "成德市域铁路S11线30日开工".
  100. "四川成都轨道交通线网累计客运量突破100亿人次".
  101. "S11线新都段正式开工".
  102. "成都:创新引领科技赋能轨道交通高质量发展".
  103. (2019-06-21). "关于成都轨道交通18号线三期工程环境影响报告书的批复".
  104. (2019-12-09). "成都轨道交通18号线三期工程首次环境影响评价信息公开".
  105. (2023-01-12). "《成都市城市轨道交通第五期建设规划(2024-2029年)》环境影响评价第二次公示".
  106. "正在公示!成都轨道交通线网规划拟优化,首次出现D字头编号".
  107. "单程票". 成都地铁 Chengdu Metro.
  108. (2013-05-07). "下月起 成都将现6元地铁票". 新浪.
  109. (2013-05-15). "地铁公交免费换乘暂不实施". 新浪.
  110. (2016-10-19). "成都地铁票价调整听证,八成代表赞成方案一,你会赞成吗?". 四川省人民政府.
  111. (2017-05-27). "6月2日起成都地铁票价改里程计价 起步价4公里2元". 腾讯.
  112. "天府通". 成都天府通 Chengdu Tianfutong.
  113. (2017-07-31). "天府通持卡乘车须知". 成都地铁 Chengdu Metro.
  114. (2017-07-31). "长城华西银行". 长城华西银行.
  115. (2017-07-31). "金融IC卡". 成都地铁 Chengdu Metro.
  116. (2025-08-06). "Chengdu eases city navigation to offer more convenience ahead of World Games".
  117. (2025-07-29). "Facilitating Global Visitors, Chengdu Become First City in Central and West China to Enable Contactless Subway Fare Payment via Foreign Bank Cards".
  118. (2025-07-29). "Use Foreign Bank Cards to Ride the Chengdu Metro".
  119. (2014-12-16). link. 中国中铁
  120. (2015-01-13). Sichuan Online. link
  121. (2016-12-10). link. 成都地铁
  122. (2015-12-22). "揭秘地铁"最强大脑"控制发车 最短间隔90秒".
  123. (2011-09-27). "成都地铁声称1号线所用信号系统是安全的".
  124. "众合机电与意大利军工巨头签3700万欧元采购备忘-搜狐财经".
  125. (2017-08-28). "众合科技:7.12亿地铁信号系统项目中标公示结束_证券_腾讯网".
  126. (2017-09-07). "两年磨一剑,众合欲争先 —— 成都地铁10号线一期工程文化主题列车首发仪式".
  127. "系统集成业绩_交控科技".
  128. "交控科技中标成都地铁5号线信号系统项目_交控科技".
  129. "7号线开通 卡斯柯助力成都地铁进入"井+环"时代".
  130. link
  131. 北京报道, □记者 王璐. (2019-12-27). "成都最长地铁建成通车在即".
  132. link
  133. link
  134. link
  135. 网易. link
  136. (7 April 2011). "Chengdu Metro orders more cars".
  137. 成都头条. "成都地铁线路图更新,你家在哪条新线附近". 新浪网.
  138. 成都地铁规划建设. "官方发布的成都地铁2020年线网图,快来围观".
  139. "成都地铁线路图".
  140. Chengdu Post. (4 September 2010). link
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Chengdu Metro — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.