Skip to content
Surf Wiki
Save to docs
general/ariane-rocket-family

From Surf Wiki (app.surf) — the open knowledge base

Ariane 5

European heavy-lift space launch vehicle (1996–2023)

Ariane 5

European heavy-lift space launch vehicle (1996–2023)

FieldValue
nameAriane 5
imageAriane 5 with James Webb Space Telescope Prelaunch (51773093465).jpg
captionAriane 5 flight VA-256 on the launch pad with the James Webb Space Telescope on December 2021
functionHeavy-lift launch vehicle
manufacturerArianeGroup
country-originEuropean multi-national
cpl(2016){{cite webtitle=Arianespace aims high in Asia-Pacificurl=https://www.flightglobal.com/news/articles/arianespace-aims-high-in-asia-pacific-425928/
publisherFlightglobalaccess-date=1 June 2016archive-url=https://web.archive.org/web/20160602105116/https://www.flightglobal.com/news/articles/arianespace-aims-high-in-asia-pacific-425928/archive-date=2 June 2016url-status=live}}
height46 -
diameter5.4 m
mass777000 kg
stages2.5
capacities{{Infobox rocket/payload
locationLEO
altitude260 km (circular)
inclination51.6°
kilosG: 16000 kg
ES: 20000 kg
locationGTO
kilos{{plainlist
* ECA: <ref namefinal-10
familyAriane
derived_fromAriane 4
derivativesAriane 6
comparable{{flatlist
statusRetired
sitesGuiana Space Centre, ELA-3
launches117 (G: 16, G+: 3, GS: 6, ES: 8, ECA: 72, ECA+: 12)
success112 (G: 13, G+: 3, GS: 6, ES: 8, ECA: 70, ECA+: 12)
fail2 (G: 1, ECA: 1)
partial3 (G: 2, ECA: 1)
first{{plainlist
last{{plainlist
payloads{{flatlist
stagedata{{Infobox rocket/stage
typebooster
diffG, G+
nameEAP P238
solidyes
number2
length31.6 m
diameter3.06 m
gross270000 kg
thrust6650 kN
total13300 kN
SI
burntime130 seconds
fuelAP, Al, HTPB
typebooster
diffGS, ECA, ES
nameEAP P241
solidyes
number2
length31.6 m
diameter3.06 m
empty33000 kg
gross273000 kg
thrust7080 kN
total14160 kN
SI
burntime140 seconds
fuelAP, Al, HTPB
stagenoFirst
typestage
diffG, G+, GS
nameEPC H158
length23.8 m
diameter5.4 m
empty12200 kg
gross170500 kg
enginesG/G+: 1 × Vulcain 1
GS: 1 × Vulcain 1B
thrustvac: 1015 kN
SIvac: 440 isp
burntime605 seconds
fuelLH2 / LOX
stagenoFirst
typestage
diffECA, ES
nameEPC H173
length23.8 m
diameter5.4 m
empty14700 kg
gross184700 kg
engines1 × Vulcain 2
thrustSL: 960 kN
vac: 1390 kN
SISL: 310 isp
vac: 432 isp
burntime540 seconds
fuelLH2 / LOX
typestage
diffG
stagenoSecond
nameEPS L9.7
length3.4 m
diameter5.4 m
empty1200 kg
gross10900 kg
engines1 × Aestus
thrust27 kN
SI
burntime1,100 seconds
fuelMMH / N2O4
typestage
diffG+, GS, ES
stagenoSecond
nameEPS L10
length3.4 m
diameter5.4 m
empty1200 kg
gross11200 kg
engines1 × Aestus
thrust27 kN
SI
burntime1,170 seconds
fuelMMH / N2O4
typestage
diffECA, ECA+
stagenoSecond
nameESC
length4.711 m
diameter5.4 m
empty4540 kg
gross19440 kg
engines1 × HM7B
thrust67 kN
SI446 seconds
burntime945 seconds
fuelLH2 / LOX

| country-origin = European multi-national

ES: 20000 kg

  • G: 6950 kg
  • G+: 6950 kg
  • GS: 6100 kg
  • ECA: 10865 kg
  • Atlas V
  • Delta IV Heavy
  • Falcon 9 Block 5
  • H-IIB
  • Long March 5
  • LVM3
  • Proton-M
  • G: 4 June 1996
  • G+: 2 March 2004
  • GS: 11 August 2005
  • ECA: 11 December 2002
  • ES: 9 March 2008
  • ECA+: 6 August 2019
  • G: 27 September 2003
  • G+: 18 December 2004
  • GS: 18 December 2009
  • ES: 25 July 2018
  • ECA: 26 November 2019
  • ECA+: 5 July 2023
  • XMM-Newton
  • Envisat
  • Rosetta
  • ATV
  • Herschel
  • Planck
  • Galileo
  • James Webb Space Telescope

GS: 1 × Vulcain 1B vac: 1390 kN vac: 432 isp

Ariane 5 () is a retired European heavy-lift space launch vehicle operated by Arianespace for the European Space Agency (ESA). It was launched from the Guiana Space Centre (CSG) in French Guiana. It was used to deliver payloads into geostationary transfer orbit (GTO), low Earth orbit (LEO) or further into space. The launch vehicle had a streak of 82 consecutive successful launches between 9 April 2003 and 12 December 2017. In development since 2014, Ariane 6, a direct successor system was first launched in 2024.

The system was designed as an expendable launch vehicle by the Centre National d'Études Spatiales (CNES), the French government's space agency, in cooperation with various European partners. Despite not being a direct derivative of its predecessor launch vehicle program, it was classified as part of the Ariane rocket family. Aérospatiale, and later ArianeGroup, was the prime contractor for the manufacturing of the vehicles, leading a multi-country consortium of other European contractors. Ariane 5 was originally intended to launch the Hermes spacecraft, and thus it was rated for human space launches.

Since its first launch, Ariane 5 was refined in successive versions: "G", "G+", "GS", "ECA", and finally, "ES". The system had a commonly used dual-launch capability, where up to two large geostationary belt communication satellites can be mounted using a SYLDA (Système de Lancement Double Ariane, meaning "Ariane Double-Launch System") carrier system. Up to three, somewhat smaller, main satellites are possible depending on size using a SPELTRA (Structure Porteuse Externe Lancement Triple Ariane, which translates to "Ariane Triple-Launch External Carrier Structure"). Up to eight secondary payloads, usually small experiment packages or minisatellites, could be carried with an ASAP (Ariane Structure for Auxiliary Payloads) platform.

Following the launch of 15 August 2020, Arianespace signed the contracts for the last eight Ariane 5 launches, before it was succeeded by the new Ariane 6 launcher, according to Daniel Neuenschwander, director of space transportation at the ESA.

Vehicle description

Cryogenic main stage

Vulcain engine

Ariane 5's cryogenic H173 main stage (H158 for Ariane 5G, G+, and GS) was called the EPC (Étage Principal Cryotechnique — Cryotechnic Main Stage). It consisted of a 5.4 m diameter by 30.5 m high tank with two compartments, one for liquid oxygen and one for liquid hydrogen, and a Vulcain 2 engine at the base with a vacuum thrust of 1390 kN. The H173 EPC weighed about 189 t, including 175 t of propellant. After the main cryogenic stage runs out of fuel, it re-entered the atmosphere for an ocean splashdown.

Solid boosters

Attached to the sides were two P241 (P238 for Ariane 5G and G+) solid rocket boosters (SRBs or EAPs from the French Étages d'Accélération à Poudre — ), each weighing about 277 t full and delivering a thrust of about 7080 kN. They were fueled by a mix of ammonium perchlorate (68%) and aluminium fuel (18%) and HTPB (14%). They each burned for 130 seconds before being dropped into the ocean. The SRBs were usually allowed to sink to the bottom of the ocean, but, like the Space Shuttle Solid Rocket Boosters, they could be recovered with parachutes, and this was occasionally done for post-flight analysis. Unlike Space Shuttle SRBs, Ariane 5 boosters were not reused. The most recent attempt was for the first Ariane 5 ECA mission in 2009. One of the two boosters was successfully recovered and returned to the Guiana Space Center for analysis. Prior to that mission, the last such recovery and testing was done in 2003.

The French M51 submarine-launched ballistic missile (SLBM) shared a substantial amount of technology with these boosters.

In February 2000, the suspected nose cone of an Ariane 5 booster washed ashore on the South Texas coast, and was recovered by beachcombers before the government could get to it.

Second stage

EPS Upper Stage used on Ariane 5ES

The second stage was on top of the main stage and below the payload. The original Ariane — Ariane 5G — used the EPS (Étage à Propergols Stockables — Storable Propellant Stage), which was fueled by monomethylhydrazine (MMH) and nitrogen tetroxide, containing 10000 kg of storable propellant. The EPS was subsequently improved for use on the Ariane 5G+, GS, and ES.

The EPS upper stage was capable of repeated ignition, first demonstrated during flight V26 which was launched on 5 October 2007. This was purely to test the engine, and occurred after the payloads had been deployed. The first operational use of restart capability as part of a mission came on 9 March 2008, when two burns were made to deploy the first Automated Transfer Vehicle (ATV) into a circular parking orbit, followed by a third burn after ATV deployment to de-orbit the stage. This procedure was repeated for all subsequent ATV flights.

Ariane 5ECA used the ESC (Étage Supérieur Cryotechnique — Cryogenic Upper Stage), which was fueled by liquid hydrogen and liquid oxygen. The ESC used the HM7B engine previously used in the Ariane 4 third stage. The propellent load of 14.7 tonne allowed the engine to burn for 945 seconds while providing 6.5 tonne of thrust. The ESC provided roll control during powered flight and full attitude control during payload separation using hydrogen gas thrusters. Oxygen gas thrusters allowed longitudinal acceleration after engine cutoff. The flight assembly included the Vehicle Equipment Bay, with flight electronics for the entire rocket, and the payload interface and structural support.

Fairing

The payload and all upper stages were covered at launch by a fairing for aerodynamic stability and protection from heating during supersonic flight and acoustic loads. It was jettisoned once sufficient altitude has been reached, typically above 100 km. It was made by Ruag Space and since flight VA-238 it was composed of 4 panels.

Launch preparations

With the exception of the solid rocket boosters (for safety and cost reasons), the components were assembled in Europe, and then shipped to French Guyana by boat. Once at Kourou, the components were assembled in the Launcher Integration Building (BIL), then transferred into the Final Assembly Building (BAF) for mating the payload and fairing, before the completed rocket was transferred to the Launch Zone (ZL) for fueling and launch.

Variants

VariantDescription
GThe original version was dubbed Ariane 5G (Generic) and had a launch mass of 737 t. Its payload capability to geostationary transfer orbit (GTO) was 6900 kg for a single satellite or 6100 kg for dual launches. It flew 16 times with one failure and two partial failures.
G+The Ariane 5G+ had an improved EPS second stage, with a GTO capacity of 7100 kg for a single payload or 6300 kg for two. It flew three times in 2004, with no failures.
GSAt the time of the failure of the first Ariane 5ECA flight in 2002, all Ariane 5 launchers in production were ECA versions. Some of the ECA cores were modified to use the original Vulcain engine and tank volumes while the failure was investigated; these vehicles were designated Ariane 5GS. The GS used the improved EAP boosters of the ECA variant and the improved EPS of the G+ variant, but the increased mass of the modified ECA core compared to the G and G+ core resulted in slightly reduced payload capacity. Ariane 5GS could carry a single payload of 6600 kg or a dual payload of 5800 kg to GTO. The Ariane 5GS flew 6 times from 2005 to 2009 with no failures.
ECAThe Ariane 5ECA (Evolution Cryotechnique type A), first flown in 2002 but ending in failure, and first successfully flown in 2005, used an improved Vulcain 2 first-stage engine with a longer, more efficient nozzle with a more efficient flow cycle and denser propellant ratio. The new ratio required length modifications to the first-stage tanks. The EPS second stage was replaced by the ESC-A (Etage Supérieur Cryogénique-A), which had a dry weight of 4540 kg and was powered by an HM-7B engine burning 14900 kg of cryogenic propellant. The ESC-A used the liquid oxygen tank and lower structure from the Ariane 4's H10 third stage, mated to a new liquid hydrogen tank. Additionally, the EAP booster casings were lightened with new welds and carry more propellant. The Ariane 5ECA started with a GTO launch capacity of 9100 kg for dual payloads or 9600 kg for a single payload. Later batches: PB+ and PC, increased the max payload to GTO to 11115 kg. The Ariane 5 ECA flew 72 times from 2002 to 2019 with one failure and one partial failure.
ECA+The Ariane 5ECA+ (Evolution Cryotechnique type A+), first successfully flown in 2019, used an improved ESC-D (Etage Supérieur Cryogénique-D).
ESThe Ariane 5ES (Evolution Storable) had an estimated LEO launch capacity of 21000 kg. It included all the performance improvements of Ariane 5ECA core and boosters but replaced the ESC-A second stage with the restartable EPS used on Ariane 5GS variants. It was used to launch the Automated Transfer Vehicle (ATV) into a 260 km circular low Earth orbit inclined at 51.6° and was used 3 times to launch 4 Galileo navigation satellites at a time directly into their operational orbit. The Ariane 5ES flew 8 times from 2008 to 2018 with no failures.
ME
(cancelled)The Ariane 5ME (Mid-life Evolution) was under development until December 2014 when funding was cut in favour of developing Ariane 6. Last activities for Ariane 5ME were completed at the end of 2015. Vinci upper stage engine, under development for the 5ME, transferred to Ariane 6.

Launch pricing and market competition

, the Ariane 5 commercial launch price for launching a "midsize satellite in the lower position" was approximately €50 million, competing for commercial launches in an increasingly competitive market.

The heavier satellite was launched in the upper position on a typical dual-satellite Ariane 5 launch and was priced higher than the lower satellite, on the order of €90 million .

Total launch price of an Ariane 5 – which could transport up to two satellites to space, one in the "upper" and one in the "lower" positions – was around €150 million .

Cancelled plans for future developments

Belgian components produced for the Ariane 5 European heavy-lift launch vehicle explained

Ariane 5 ME

The Ariane 5 ME (Mid-life Evolution) was in development into early 2015, and was seen as a stopgap between Ariane 5ECA/Ariane 5ES and the new Ariane 6. With first flight planned for 2018, it would have become ESA's principal launcher until the arrival of the new Ariane 6 version. ESA halted funding for the development of Ariane 5ME in late 2014 to prioritize development of Ariane 6.

The Ariane 5ME was to use a new upper stage, with increased propellant volume, powered by the new Vinci engine. Unlike the HM-7B engine, it was to be able to restart several times, allowing for complex orbital maneuvers such as insertion of two satellites into different orbits, direct insertion into geosynchronous orbit, planetary exploration missions, and guaranteed upper stage deorbiting or insertion into graveyard orbit. The launcher was also to include a lengthened fairing up to 20 m and a new dual launch system to accommodate larger satellites. Compared to an Ariane 5ECA model, the payload to GTO was to increase by 15% to 11500 kg and the cost-per-kilogram of each launch was projected to decline by 20%.

Development

Originally known as the Ariane 5ECB, Ariane 5ME was to have its first flight in 2006. However, the failure of the first ECA flight in 2002, combined with a deteriorating satellite industry, caused ESA to cancel development in 2003. Development of the Vinci engine continued, though at a lower pace. The ESA Council of Ministers agreed to fund development of the new upper stage in November 2008.

In 2009, EADS Astrium was awarded a €200 million contract, and on 10 April 2012 received another €112 million contract to continue development of the Ariane 5ME with total development effort expected to cost €1 billion.

On 21 November 2012, ESA agreed to continue with the Ariane 5ME to meet the challenge of lower priced competitors. It was agreed the Vinci upper stage would also be used as the second stage of a new Ariane 6, and further commonality would be sought. Ariane 5ME qualification flight was scheduled for mid-2018, followed by gradual introduction into service.

On 2 December 2014, ESA decided to stop funding the development of Ariane 5ME and instead focus on Ariane 6, which was expected to have a lower cost per launch and allow more flexibility in the payloads (using two or four P120C solid boosters depending on total payload mass).

Solid propellant stage

Work on the Ariane 5 EAP motors was continued in the Vega programme. The Vega 1st stage engine – the P80 engine – was a shorter derivation of the EAP. The P80 booster casing was made of filament wound graphite epoxy, much lighter than the current stainless steel casing. A new composite steerable nozzle was developed while new thermal insulation material and a narrower throat improved the expansion ratio and subsequently the overall performance. Additionally, the nozzle had electromechanical actuators which replaced the heavier hydraulic ones used for thrust vector control.

These developments could maybe have made their way back into the Ariane programme, but this was most likely an inference based on early blueprints of the Ariane 6 having a central P80 booster and 2-4 around the main one. The incorporation of the ESC-B with the improvements to the solid motor casing and an uprated Vulcain engine would have delivered 27000 kg to LEO. This would have been developed for any lunar missions but the performance of such a design might not have been possible if the higher Max-Q for the launch of this launch vehicle would have posed a constraint on the mass delivered to orbit.

Ariane 6

Main article: Ariane 6

The design brief of the next generation launch vehicle Ariane 6 called for a lower-cost and smaller launch vehicle capable of launching a single satellite of up to 6500 kg to GTO. However, after several permutations the finalized design was nearly identical in performance to the Ariane 5, focusing instead on lowering fabrication costs and launch prices. , Ariane 6 was projected to be launched for about €70 million per flight, about half of the Ariane 5 price.

Initially development of Ariane 6 was projected to cost €3.6 billion. In 2017, the ESA set 16 July 2020 as the deadline for the first flight. The Ariane 6 successfully completed its maiden flight on 9 July 2024.

Notable launches

Launch of the 34th Ariane 5 from [[Guiana Space Centre

Ariane 5's first test flight (Ariane 5 Flight 501) on 4 June 1996 failed, with the rocket self-destructing 37 seconds after launch because of a malfunction in the control software. A data conversion from 64-bit floating-point value to 16-bit signed integer value to be stored in a variable representing horizontal bias caused a processor trap (operand error) because the floating-point value was too large to be represented by a 16-bit signed integer. The software had been written for the Ariane 4 where efficiency considerations (the computer running the software had an 80% maximum workload requirement) led to four variables being protected with a handler while three others, including the horizontal bias variable, were left unprotected because it was thought that they were "physically limited or that there was a large margin of safety". The software, written in Ada, was included in the Ariane 5 through the reuse of an entire Ariane 4 subsystem despite the fact that the particular software containing the bug, which was just a part of the subsystem, was not required by the Ariane 5 because it has a different preparation sequence than the Ariane 4.

The second test flight (L502, on 30 October 1997) was a partial failure. The Vulcain nozzle caused a roll problem, leading to premature shutdown of the core stage. The upper stage operated successfully, but it could not reach the intended orbit. A subsequent test flight (L503, on 21 October 1998) proved successful and the first commercial launch (L504) occurred on 10 December 1999 with the launch of the XMM-Newton X-ray observatory satellite.

Another partial failure occurred on 12 July 2001, with the delivery of two satellites into an incorrect orbit, at only half the height of the intended GTO. The ESA Artemis telecommunications satellite was able to reach its intended orbit on 31 January 2003, through the use of its experimental ion propulsion system.

The next launch did not occur until 1 March 2002, when the Envisat environmental satellite successfully reached an orbit of 800 km above the Earth in the 11th launch. At 8111 kg, it was the heaviest single payload until the launch of the first ATV on 9 March 2008, at 19360 kg.

The first launch of the ECA variant on 11 December 2002 ended in failure when a main booster problem caused the rocket to veer off-course, forcing its self-destruction three minutes into the flight. Its payload of two communications satellites (STENTOR and Hot Bird 7), valued at about €630 million, was lost in the Atlantic Ocean. The fault was determined to have been caused by a leak in coolant pipes allowing the nozzle to overheat. After this failure, Arianespace SA delayed the expected January 2003 launch for the Rosetta mission to 26 February 2004, but this was again delayed to early March 2004 due to a minor fault in the foam that protects the cryogenic tanks on the Ariane 5. The failure of the first ECA launch was the last failure of an Ariane 5 until flight 241 in January 2018.

On 27 September 2003, the last Ariane 5G boosted three satellites (including the first European lunar probe, SMART-1), in Flight 162. On 18 July 2004, an Ariane 5G+ boosted what was at the time the heaviest telecommunication satellite ever, Anik F2, weighing almost 6000 kg.

The first successful launch of the Ariane 5ECA took place on 12 February 2005. The payload consisted of the XTAR-EUR military communications satellite, a 'SLOSHSAT' small scientific satellite and a MaqSat B2 payload simulator. The launch had been scheduled for October 2004, but additional testing and a military launch (of a Helios 2A observation satellite) delayed the attempt.

On 11 August 2005, the first Ariane 5GS (featuring the Ariane 5ECA's improved solid motors) boosted Thaicom 4, the heaviest telecommunications satellite to date at 6505 kg, into orbit.

On 16 November 2005, the third Ariane 5ECA launch (the second successful ECA launch) took place. It carried a dual payload consisting of Spaceway F2 for DirecTV and Telkom-2 for PT Telekomunikasi of Indonesia. This was the launch vehicle's heaviest dual payload to date, at more than 8000 kg.

On 27 May 2006, an Ariane 5ECA launch vehicle set a new commercial payload lifting record of 8200 kg. The dual-payload consisted of the Thaicom 5 and Satmex 6 satellites.

On 4 May 2007, the Ariane 5ECA set another new commercial record, lifting into transfer orbit the Astra 1L and Galaxy 17 communication satellites with a combined weight of 8600 kg, and a total payload weight of 9400 kg. This record was again broken by another Ariane 5ECA, launching the Skynet 5B and Star One C1 satellites, on 11 November 2007. The total payload weight for this launch was of 9535 kg.

On 9 March 2008, the first Ariane 5ES-ATV was launched to deliver the first ATV called Jules Verne to the International Space Station (ISS). The ATV was the heaviest payload ever launched by a European launch vehicle, providing supplies to the space station with necessary propellant, water, air and dry cargo. This was the first operational Ariane mission which involved an engine restart in the upper stage. The ES-ATV Aestus EPS upper stage was restartable while the ECA HM7-B engine was not.

On 1 July 2009, an Ariane 5ECA launched TerreStar-1 (now EchoStar T1), which was then, at 6910 kg, the largest and most massive commercial telecommunication satellite ever built at that time until being overtaken by Telstar 19 Vantage, at 7080 kg, launched aboard Falcon 9. The satellite was launched into a lower-energy orbit than a usual GTO, with its initial apogee at roughly 17900 km.

On 28 October 2010, an Ariane 5ECA launched Eutelsat's W3B (part of its W Series of satellites) and Broadcasting Satellite System Corporation (B-SAT)'s BSAT-3b satellites into orbit. But the W3B satellite failed to operate shortly after the successful launch and was written off as a total loss due to an oxidizer leak in the satellite's main propulsion system. The BSAT-3b satellite, however, is operating normally.

The VA253 launch on 15 August 2020 introduced two small changes that increased lift capacity by about 85 kg; these were a lighter avionics and guidance-equipment bay, and modified pressure vents on the payload fairing, which were required for the subsequent launch of the James Webb Space Telescope. It also debuted a location system using Galileo navigation satellites.

On 25 December 2021, VA256 launched the James Webb Space Telescope towards a Sun–Earth L2 halo orbit. The precision of trajectory following launch led to fuel savings credited with potentially doubling the lifetime of the telescope by leaving more hydrazine propellant on board for station-keeping than was expected. According to Rudiger Albat, the program manager for Ariane 5, efforts had been made to select components for this flight that had performed especially well during pre-flight testing, including "one of the best Vulcain engines that we've ever built."

GTO payload weight records

On 22 April 2011, the Ariane 5ECA flight VA-201 broke a commercial record, lifting Yahsat 1A and Intelsat New Dawn with a total payload weight of 10064 kg to transfer orbit. This record was later broken again during the launch of Ariane 5ECA flight VA-208 on 2 August 2012, lifting a total of 10182 kg into the planned geosynchronous transfer orbit, which was broken again 6 months later on flight VA-212 with 10317 kg sent towards geosynchronous transfer orbit. In June 2016, the GTO record was raised to 10730 kg, on the first rocket in history that carried a satellite dedicated to financial institutions. The payload record was pushed a further 5 kg, up to 10735 kg on 24 August 2016 with the launch of Intelsat 33e and Intelsat 36. On 1 June 2017, the payload record was broken again to 10865 kg carrying ViaSat-2 and Eutelsat-172B. In 2021 VA-255 put 11,210 kg into GTO.

VA241 anomaly

Main article: Ariane flight VA241

On 25 January 2018, an Ariane 5ECA launched SES-14 and Al Yah 3 satellites. About 9 minutes and 28 seconds after launch, a telemetry loss occurred between the launch vehicle and the ground controllers. It was later confirmed, about 1 hour and 20 minutes after launch, that both satellites were successfully separated from the upper stage and were in contact with their respective ground controllers, but that their orbital inclinations were incorrect as the guidance systems might have been compromised. Therefore, both satellites conducted orbital procedures, extending commissioning time. SES-14 needed about 8 weeks longer than planned commissioning time, meaning that entry into service was reported early September instead of July. Nevertheless, SES-14 is still expected to be able to meet the designed lifetime. This satellite was originally to be launched with more propellant reserve on a Falcon 9 launch vehicle since the Falcon 9, in this specific case, was intended to deploy this satellite into a high inclination orbit that would require more work from the satellite to reach its final geostationary orbit. The Al Yah 3 was also confirmed healthy after more than 12 hours without further statement, and like SES-14, Al Yah 3's maneuvering plan was also revised to still fulfill the original mission. As of 16 February 2018, Al Yah 3 was approaching the intended geostationary orbit, after series of recovery maneuvers had been performed. The investigation showed that invalid inertial units' azimuth value had sent the vehicle 17° off course but to the intended altitude, they had been programmed for the standard geostationary transfer orbit of 90° when the payloads were intended to be 70° for this supersynchronous transfer orbit mission, 20° off norme. This mission anomaly ended the 82 consecutive launch success streak from 2003.

Launch history

Launch statistics

Ariane 5 launch vehicles had accumulated 117 launches, 112 of which were successful, yielding a success rate. Between April 2003 and December 2017, Ariane 5 flew 83 consecutive missions without failure, but the launch vehicle suffered a partial failure in January 2018.

Rocket configurations

Launch outcomes

List of launches

All launches are from Guiana Space Centre, ELA-3.

#Flight no.Date
Time (UTC)Rocket type
Serial no.PayloadTotal payload mass (including launch adapters and SYLDA)OrbitCustomersLaunch
outcomeV-88V-101V-112V-119V-128V-130V-135V-138V-140V-142V-145V-153V-155V-157V-160V-161V-162V-158V-163V-165V-164V-166V-168V-167V-169V-170V-171V-172V-173V-174V-175V-176V-177V-178V-179V-180V-181V-182V-183V-184V-185V-186V-187V-188V-189V-190V-191V-192V-193V-194V-195V-196V-197V-198V-199V-200VA-201VA-202VA-203VA-204VA-205VA-206VA-207VA-208VA-209VA-210VA-211VA-212VA-213VA-214VA-215VA-217VA-216VA-219VA-218VA-220VA-221VA-223VA-224VA-225VA-226VA-227VA-228VA-229VA-230VA-232VA-231VA-233VA-234VA-235VA-236VA-237VA-238VA-239VA-240VA-241VA-242VA-244VA-243VA-245VA-246VA-247VA-248VA-249VA-250VA-251VA-252VA-253VA-254VA-255VA-256VA-257VA-258VA-259VA-260VA-261
14 June 1996
12:34G
501Cluster
Maiden flight of Ariane 5, guidance system failed due to programming error, destroyed by range safety.
230 October 1997
13:43G
502MaqSat-H, TEAMSAT, MaqSat-B, YES
First Ariane 5 flight to reach orbit. Upper stage underperformed, placed satellites in lower orbit than planned.
321 October 1998
16:37G
503MaqSat 3, ARD~6,800 kgGTO
First fully successful Ariane 5 launch. Contained ARD as a rideshare, designed to test reentry.
410 December 1999
14:32G
504XMM-Newton3,800 kgHEO
Part of Horizon 2000 program, a space telescope designed to perform x-ray astronomy.
521 March 2000
23:28G
505INSAT-3B
AsiaStar~5,800 kgGTO
First Ariane 5 night launch.
614 September 2000
22:54G
506Astra 2B
GE-7~4,700 kgGTO
716 November 2000
01:07G
507PanAmSat-1R
Amsat-P3D
STRV 1C
STRV 1D~6,600 kgGTO
820 December 2000
00:26G
508Astra 2D
GE-8
LDREX~4,700 kgGTO
98 March 2001
22:51G
509Eurobird-1
BSAT-2a~5,400 kgGTO
1012 July 2001
21:58G
510Artemis
BSAT-2b~5,400 kgGTO (planned)
MEO (achieved)
Upper stage underperformed, payloads were placed in an unusable orbit. Artemis was raised to its target orbit at the expense of operational fuel; BSAT-2b was not recoverable.
111 March 2002
01:07G
511Envisat8,111 kgSSO
Earth observation satellite designed to succeed the two European Remote-Sensing Satellites. Largest civilian observation satellite launched.
125 July 2002
23:22G
512Stellat 5
N-STAR c~6,700 kgGTO
1328 August 2002
22:45G
513Atlantic Bird 1
MSG-1
MFD~5,800 kgGTO
1411 December 2002
22:22ECA
517Hot Bird 7
STENTOR
MFD-A
MFD-BGTO (planned)
Maiden flight of Ariane 5ECA, first stage engine failure, rocket destroyed by range safety.
159 April 2003
22:52G
514INSAT-3A
Galaxy 12~5,700 kgGTO
1611 June 2003
22:38G
515Optus C1
BSAT-2c~7,100 kgGTO
1727 September 2003
23:14G
516INSAT-3E
eBird-1
SMART-1~5,600 kgGTO
Final flight of Ariane 5G
182 March 2004
07:17G+
518Rosetta
Philae3,011 kgHeliocentric
Maiden flight of Ariane 5G+. Part of the Horizon 2000 program, designed to explore comet 67P/Churyumov–Gerasimenko. First spacecraft to orbit (and with Philae, first to land on) a comet, and first non-NASA spacecraft to reach the outer solar system. First Ariane 5 launch into heliocentric orbit.
1918 July 2004
00:44G+
519Anik F25,950 kgGTO
2018 December 2004
16:26G+
520Helios 2A
Essaim-1
Essaim-2
Essaim-3
Essaim-4
PARASOL
Nanosat 014,200 kgSSO
Final flight of Ariane 5G+
2112 February 2005
21:03ECA
521XTAR-EUR
Maqsat-B2
Sloshsat-FLEVO~8,400 kgGTO
2211 August 2005
08:20GS
523Thaicom 46,485 kgGTO
Maiden flight of Ariane 5GS
2313 October 2005
22:32GS
524Syracuse 3A
Galaxy 15~6,900 kgGTO
2416 November 2005
23:46ECA
522Spaceway-2
Telkom-2~9,100 kgGTO
2521 December 2005
23:33GS
525INSAT-4A
MSG-26,478 kgGTO
2611 March 2006
22:33ECA
527Spainsat
Hot Bird 7A~8,700 kgGTO
2727 May 2006
21:09ECA
529Satmex-6
Thaicom 59,172 kgGTO
2811 August 2006
22:15ECA
531JCSAT-10
Syracuse 3B~8,900 kgGTO
2913 October 2006
20:56ECA
533DirecTV-9S
Optus D1
LDREX-2~9,300 kgGTO
308 December 2006
22:08ECA
534WildBlue-1
AMC-18~7,800 kgGTO
3111 March 2007
22:03ECA
535Skynet 5A
INSAT-4B~8,600 kgGTO
324 May 2007
22:29ECA
536Astra 1L
Galaxy 179,402 kgGTO
3314 August 2007
23:44ECA
537Spaceway-3
BSAT-3a8,848 kgGTO
345 October 2007
22:02GS
526Intelsat 11
Optus D25,857 kgGTO
3514 November 2007
22:03ECA
538Skynet 5B
Star One C19,535 kgGTO
3621 December 2007
21:41GS
530Rascom-QAF1
Horizons-2~6,500 kgGTO
379 March 2008
04:03ES
528Jules Verne ATVLEO (ISS)
Maiden flight of Ariane 5ES. First flight of the Automated Transfer Vehicle, going to the International Space Station. Made Kourou the third launch site (after Baikonur and Cape Canaveral/KSC) to launch a payload to the ISS.
3818 April 2008
22:17ECA
539Star One C2
Vinasat-17,762 kgGTO
3912 June 2008
22:05ECA
540Skynet 5C
Türksat 3A8,541 kgGTO
407 July 2008
21:47ECA
541ProtoStar-1
Badr-68,639 kgGTO
4114 August 2008
20:44ECA
542Superbird-7
AMC-218,068 kgGTO
4220 December 2008
22:35ECA
543Hot Bird 9
Eutelsat W2M9,220 kgGTO
4312 February 2009
22:09ECA
545Hot Bird 10
NSS-9
Spirale-A
Spirale-B8,511 kgGTO
4414 May 2009
13:12ECA
546Herschel Space Observatory
Planck3,402 kgSun–Earth
Both part of the Horizon 2000 program, both space telescopes. Herschel designed to perform infrared astronomy, Planck designed to measure the cosmic microwave background.
451 July 2009
19:52ECA
547TerreStar-17,055 kgGTO
4621 August 2009
22:09ECA
548JCSAT-12
Optus D37,655 kgGTO
471 October 2009
21:59ECA
549Amazonas 2
COMSATBw-19,087 kgGTO
4829 October 2009
20:00ECA
550NSS-12
Thor-69,462 kgGTO
4918 December 2009
16:26GS
532Helios 2B5,954 kgSSO
Final flight of Ariane 5GS
5021 May 2010
22:01ECA
551Astra 3B
COMSATBw-29,116 kgGTOSES
MilSat Services
5126 June 2010
21:41ECA
552Arabsat-5A
Chollian8,393 kgGTOArabsat
KARI
524 August 2010
20:59ECA
554Nilesat 201
RASCOM-QAF 1R7,085 kgGTONilesat
RASCOM
5328 October 2010
21:51ECA
555Eutelsat W3B
BSAT-3b8,263 kgGTOEutelsat
Broadcasting Satellite System Corporation
Eutelsat W3B suffered a leak in the propulsion system shortly after launch and was declared a total loss. BSAT-3b is operating normally.
5426 November 2010
18:39ECA
556Intelsat 17
HYLAS-18,867 kgGTOIntelsat
Avanti Communications
5529 December 2010
21:27ECA
557Koreasat 6
Hispasat-1E9,259 kgGTOKT Corporation
Hispasat
5616 February 2011
21:50ES
544Johannes Kepler ATV20,050 kgLEO (ISS)ESA
ISS resupply flight.
5722 April 2011
21:37ECA
558Yahsat 1A
New Dawn10,064 kgGTOAl Yah Satellite Communications
Intelsat
Launch was scrubbed from 30 March 2011, aborted in the last seconds before liftoff due to a gimbal malfunction in the Vulcain main engine.
5820 May 2011
20:38ECA
559ST-2
GSAT-89,013 kgGTOSingapore Telecom
ISRO
596 August 2011
22:52ECA
560Astra 1N
BSAT-3c / JCSAT-110R9,095 kgGTOSES
Broadcasting Satellite System Corporation
6021 September 2011
21:38ECA
561Arabsat-5C
SES-28,974 kgGTOArab Satellite Communications Organization
SES
6123 March 2012
04:34ES
553Edoardo Amaldi ATV20,060 kgLEO (ISS)ESA
ISS resupply flight.
6215 May 2012
22:13ECA
562JCSAT-13
Vinasat-28,381 kgGTOSKY Perfect JSAT
VNPT
635 July 2012
21:36ECA
563EchoStar XVII
MSG-39,647 kgGTOEchoStar
EUMETSAT
642 August 2012
20:54ECA
564Intelsat 20
HYLAS 210,182 kgGTOIntelsat
Avanti Communications
6528 September 2012
21:18ECA
565Astra 2F
GSAT-1010,211 kgGTOSES
ISRO
6610 November 2012
21:05ECA
566Eutelsat 21B
Star One C39,216 kgGTOEutelsat
Star One
6719 December 2012
21:49ECA
567Skynet 5D
Mexsat-38,637 kgGTOAstrium
Mexican Satellite System
687 February 2013
21:36ECA
568Amazonas 3
Azerspace-1/Africasat-1a10,350 kgGTOurl=http://www.arianespace.com/mission-update/azerspaceafricasat-1a-is-prepared-for-arianespaces-first-ariane-5-launch-in-2013-2title=Azerspace/Africasat-1a is prepared for Arianespace's first Ariane 5 launch in 2013access-date=29 August 2018archive-url=https://web.archive.org/web/20180829212128/http://www.arianespace.com/mission-update/azerspaceafricasat-1a-is-prepared-for-arianespaces-first-ariane-5-launch-in-2013-2/archive-date=29 August 2018url-status=live}}
695 June 2013
21:52ES
592Albert Einstein ATV20,252 kgLEO (ISS)ESA
ISS resupply flight.
7025 July 2013
19:54ECA
569Alphasat I-XL
INSAT-3D9,760 kgGTOInmarsat
ISRO
7129 August 2013
20:30ECA
570Eutelsat 25B/Es'hail 1
GSAT-79,790 kgGTOEutelsat
ISRO
726 February 2014
21:30ECA
572ABS-2
Athena-Fidus10,214 kgGTOABS (satellite operator)
DIRISI
7322 March 2014
22:04ECA
571Astra 5B
Amazonas 4A9,579 kgGTOSES
Hispasat
7429 July 2014
23:47ES
593Georges Lemaître ATV20,293 kgLEO (ISS)ESA
ISS resupply flight. Final launch of the Automated Transfer Vehicle.
7511 September 2014
22:05ECA
573MEASAT-3b
Optus 1010,088 kgGTOMEASAT Satellite Systems
Optus
7616 October 2014
21:43ECA
574Intelsat 30
ARSAT-110,060 kgGTOIntelsat
ARSAT
776 December 2014
20:40ECA
575DirecTV-14
GSAT-1610,210 kgGTODirecTV
ISRO
7826 April 2015
20:00ECA
576Thor 7
SICRAL-29,852 kgGTOBritish Satellite Broadcasting
French Armed Forces
7927 May 2015
21:16ECA
577DirecTV-15
SKY Mexico 19,960 kgGTODirecTV
Sky México
8015 July 2015
21:42ECA
578Star One C4
MSG-48,587 kgGTOStar One
EUMETSAT
8120 August 2015
20:34ECA
579Eutelsat 8 West B
Intelsat 349,922 kgGTOEutelsat
Intelsat
8230 September 2015
20:30ECA
580NBN Co 1A
ARSAT-210,203 kgGTONational Broadband Network
ARSAT
8310 November 2015
21:34ECA
581Arabsat 6B
GSAT-159,810 kgGTOArabsat
ISRO
8427 January 2016
23:20ECA
583Intelsat 29e6,700 kgGTOIntelsat
859 March 2016
05:20ECA
582Eutelsat 65 West A6,707 kgGTOEutelsat
8618 June 2016
21:38ECA
584EchoStar 18
BRISat10,730 kgGTOEchoStar
Bank Rakyat Indonesia
This mission carried the first satellite owned by a financial institution.
8724 August 2016
22:16ECA
586Intelsat 33e
Intelsat 3610,735 kgGTOIntelsat
Intelsat 33e's LEROS apogee engine, which supposed to perform orbit raising, failed soon after its successful launch, forcing to use the experimentation of low-thrust reaction control system which extended the commissioning time 3 months longer than expected. Later, it suffered other thruster problems which cut its operational lifetime by about 3.5 years. On 19 October 2024 Intelsat 33e disintegrated in orbit and was declared a total loss by Intelsat.
885 October 2016
20:30ECA
585NBN Co 1B
GSAT-1810,663 kgGTONational Broadband Network
INSAT
8917 November 2016
13:06ES
594Galileo FOC-M6
(satellites FM-7, 12, 13, 14)3,290 kgMEOESA
Part of the Galileo satellite navigation system. First Galileo launch on Ariane 5 and from a launch vehicle besides Soyuz.
9021 December 2016
20:30ECA
587Star One D1
JCSAT-1510,722 kgGTOStar One
SKY Perfect JSAT
9114 February 2017
21:39ECA
588Intelsat 32e / SkyBrasil-1
Telkom-3S10,485 kgGTOIntelsat, DirecTV Latin America
Telkom Indonesia
This mission carried the first Intelsat EpicNG high-throughput satellite based on the Eurostar E3000 platform, while other Intelsat EpicNG satellites were based on BSS-702MP platform.
924 May 2017
21:50ECA
589Koreasat 7
SGDC-110,289 kgGTOKT Corporation
SGDC
The launch was delayed from March 2017 due to transportation to the launch site being restricted by a blockade erected by striking workers.
931 June 2017
23:45ECA
590ViaSat-2
Eutelsat 172B10,865 kgGTOViaSat
Eutelsat
Heaviest and most expensive commercial payload ever put into orbit, valued at approximately €675 million (~€844 million including the launch vehicle), until 12 June 2019, when Falcon 9 delivered RADARSAT Constellation with three Canadian satellites, valued almost €844 million (not including the launch vehicle), into orbit. ViaSat-2 suffered antenna glitch, which cut about 15% of its intended throughput.
9428 June 2017
21:15ECA
591EuropaSat / Hellas Sat 3
GSAT-1710,177 kgGTOInmarsat / Hellas Sat
ISRO
9529 September 2017
21:56ECA
5100Intelsat 37e
BSAT-4a10,838 kgGTOIntelsat
B-SAT
Launch was scrubbed from 5 September 2017 due to electrical fault in one of the solid rocket boosters that caused launch abort in the last seconds before liftoff.
9612 December 2017
18:36ES
595Galileo FOC-M7
(satellites FM-19, 20, 21, 22)3,282 kgMEOESA
Part of the Galileo satellite navigation system.
9725 January 2018
22:20ECA
5101SES-14 with GOLD
Al Yah 39,123 kgGTOSES, NASA
AlYahsat
Telemetry from the launch vehicle was lost after 9 minutes 30 seconds into the flight, after launch vehicle trajectory went off course due to invalid inertial units' azimuth value. Satellites later found to have separated from the upper stage and entered an incorrect orbit with large inclination deviations. However, they were able to reach the planned orbit with small loss of on board propellant for SES-14 and still expected to meet the designed lifetime, but with significant loss on Al Yah 3 (up to 50% of its intended operational life).
985 April 2018
21:34ECA
5102Superbird-8 / Superbird-B3
HYLAS-410,260 kgGTOJapanese MoD, SKY Perfect JSAT
Avanti Communications
Return-to-flight mission after VA-241 mishap on 25 January 2018.
9925 July 2018
11:25ES
596Galileo FOC-M8
(satellites FM-23, 24, 25, 26)3,379 kgMEOESA
Final flight of Ariane 5ES. Part of the Galileo satellite navigation system.
10025 September 2018
22:38ECA
5103Horizons-3e
Azerspace-2 / Intelsat 3810,827 kgGTOIntelsat, SKY Perfect JSAT
Azercosmos
Hundredth Ariane 5 mission. Flight VA-243 was delayed from 25 May 2018 due to issues with GSAT-11, which was eventually replaced by Horizons-3e.
10120 October 2018
01:45ECA
5105BepiColombo4,081 kgHeliocentricESA
JAXA
Part of the Horizon 2000 Plus program, designed to explore Mercury and study its magnetic field, magnetosphere, and composition. Joint mission between ESA and JAXA. First non-NASA spacecraft to visit the planet.
1024 December 2018
20:37ECA
5104{{plainlist10,298 kgGTO{{plainlist
1035 February 2019
21:01ECA
5106{{plainlist10,018 kgGTO{{plainlist
10420 June 2019
21:43ECA
5107{{plainlist10,594 kgGTO{{plainlist
1056 August 2019
19:30ECA
5108{{plainlist10,594 kgGTO{{plainlist
10626 November 2019
21:23ECA
5109Inmarsat-5 F5 (GX 5)
TIBA-110,495 kgGTOInmarsat
Government of Egypturl=https://www.arianespace.com/mission/ariane-flight-va250/title=Ariane Flight VA 250publisher=Arianespacedate=26 November 2019access-date=26 November 2019archive-url=https://web.archive.org/web/20191126234043/https://www.arianespace.com/mission/ariane-flight-va250/archive-date=26 November 2019url-status=live}}
10716 January 2020
21:05ECA
5110url=https://space.skyrocket.de/doc_sdat/eutelsat-konnect.htmtitle=Eutelsat Konnectpublisher=Gunter's Space Pagefirst=Gunterlast=Krebsdate=25 February 2020access-date=23 October 2021}}
GSAT-307,888 kgGTOEutelsat
ISRO
10818 February 2020
22:18ECA
5111JCSAT-17
GEO-KOMPSAT 2B9,236 kgGTOSKY Perfect JSAT
KARI
10915 August 2020
22:04ECA
5112Galaxy 30
MEV-2
BSAT-4b10,468 kg
including 765 kg of support structures.GTOIntelsat
Northrop Grumman
B-SAT
11030 July 2021
21:00ECA
5113Eutelsat Quantum
Star One D210,515 kgGTOEutelsat
Star One
11124 October 2021
02:10ECA
5115SES-17
Syracuse 4A11,210 kgGTOSES
DGA
11225 December 2021
12:20ECA
5114James Webb Space Telescope6161.4 kgSun–EarthNASA / ESA / CSA / STScI
Part of the Large Strategic Science Missions, a space telescope aimed to perform visible light astronomy and infrared astronomy. Joint mission between NASA, ESA, and the CSA. Designed to act as a successor to the Hubble Space Telescope and the Spitzer Space Telescope.
11322 June 2022
21:50ECA
5116MEASAT-3d
GSAT-249,829 kgGTOMEASAT
NSIL / Tata Play
1147 September 2022
21:45ECA
5117Eutelsat Konnect VHTS6,400 kgGTOEutelsat
11513 December 2022
20:30ECA
5118Galaxy 35
Galaxy 36
MTG-I110,972 kgGTOIntelsat
EUMETSAT
11614 April 2023
12:14ECA
5120Jupiter Icy Moons Explorer (JUICE)5,963 kgHeliocentricESA
Part of the Cosmic Vision program, designed to explore Jupiter and its moons such as Europa, Ganymede, and Callisto. Complements NASA's Europa Clipper. Slated to be first Non-NASA spacecraft to visit an outer Solar System planet and the first to orbit a moon besides the Moon. Last Ariane 5 flight into heliocentric orbit.
1175 July 2023
22:00ECA
5119Syracuse 4B (Comsat-NG 2)
Heinrich Hertz (H2Sat)7,679.8 kgGTODGA
DLR
Ariane 5's last mission.

Notes

References

References

  1. "Arianespace begins building final 10 Ariane 5s ahead of Ariane 6 operational debut". Space Daily.
  2. Berger, Eric. (21 June 2021). "The Ariane 6 debut is slipping again as Europe hopes for a late 2022 launch". Ars Technica.
  3. Krebs, Gunter D.. "MTG-S 1, 2 (Meteosat 13, 16 / Sentinel 4A, 4B)". Gunter's Space Page.
  4. (15 August 2020). "Debuting upgrades, Ariane 5 rocket deploys three U.S.-built satellites in orbit". Spaceflight Now.
  5. Svenson, Adam. (2023-07-06). "Last Ariane 5 Mission Leaves Europe Without Launch Capacity".
  6. "Ariane 5 Data Sheet". Space Launch Report.
  7. "France in Space #387". Office of Science and Technology Embassy of France in the USA.
  8. Vavasseur. (12 June 2020). "French Navy SSBN 'Le Téméraire' Test Fired M51 SLBM In Operational Conditions".
  9. (29 February 2000). "Government Loses Unidentified Floating Object".
  10. European Space Agency, "Ariane 5ECA": http://www.esa.int/Enabling_Support/Space_Transportation/Launch_vehicles/Ariane_5_ECA2 Discussed in context of other launch vehicles in Gérard Maral, Michel Bousquet, and Zhili Sun, ''Satellite Communications Systems: Systems, Techniques and Technology'', sixth edition, London: Wiley, 2020 {{ISBN. 9781119382072
  11. "ESC-A – Cryogenic upper stage".
  12. "Ariane 5 launch proves reliability and flies new fairing".
  13. (May 2014). "Ariane 5 production and integration operations: ten years of continuous efficiency and quality improvement".
  14. (12 December 2017). "Ariane 5G". Gunter's Space Page.
  15. (12 December 2017). "Ariane-5G+". Gunter's Space Page.
  16. "Ariane 5 Evolution".
  17. (12 December 2017). "Ariane-5GS". Gunter's Space Page.
  18. (20 February 2020). "Ariane-5ECA". Gunter's Space Page.
  19. Krebs, Gunter D.. "Ariane-5ECA+".
  20. "Ariane 5ES". ESA.
  21. Svitak, Amy. (1 March 2014). "SpaceX Says Falcon 9 To Compete For EELV This Year". Aviation Week.
  22. de Selding, Peter B.. (2 November 2013). "SpaceX Challenge Has Arianespace Rethinking Pricing Policies". SpaceNews.
  23. Amos, Jonathan. (3 December 2013). "SpaceX launches SES commercial TV satellite for Asia". BBC News.
  24. (5 January 2015). "With Eye on SpaceX, CNES Begins Work on Reusable Rocket Stage". SpaceNews.
  25. "ESA – Adapted Ariane 5ME".
  26. "ESA cancels plans for uprated Ariane 5 ECB".
  27. "ESA's Council of Ministers decides the future of European space exploration".
  28. "ESA signs contract for Ariane 5 rocket enhancements".
  29. "ESA Gives Astrium US$150 million To Continue Ariane 5ME Work". SpaceNews.
  30. Messier, Dough. (18 January 2014). "ESA Faces Large Cost for Ariane 5 Upgrade". Parabolic Arc.
  31. (3 December 2014). "Ariane 6". Space Launch Report.
  32. (2010). "European Space Policy and Programs Handbook". Int'l Business Publications.
  33. Clark. (21 November 2012). "European ministers decide to stick with Ariane 5, for now". Spaceflight Now.
  34. (30 November 2006). "Successful firing of Vega's first-stage motor in Kourou". ESA.
  35. Iranzo-Greus. (23 March 2005). "Ariane 5—A European Launcher for Space Exploration". EADS SPACE Transportation.
  36. Clark, Stephen. (27 March 2014). "Germany calls for redesign of next-generation Ariane". Spaceflight Now.
  37. "Ariane 6". Arianespace.
  38. (27 November 2014). "Media backgrounder for ESA Council at Ministerial Level". ESA.
  39. (22 June 2017). "Full thrust on Europe's new rocket". BBC News.
  40. "History's Worst Software Bugs".
  41. (December 10, 2019). "X-ray Satellite XMM-Newton Celebrates 20 Years in Space". NASA.
  42. (6 February 2018). "iPStar 1 (Thaicom 4, MEASAT 5, Synertone 1)". Gunter's Space Page.
  43. (27 May 2006). "Ariane lifts record dual payload". BBC News.
  44. (5 May 2007). "Ariane 5 – second launch of six in 2007". ESA.
  45. (11 November 2007). "Ariane 5 – fifth launch of six in 2007". ESA.
  46. (2 June 2009). "Integration of Ariane 5 is completed for its upcoming heavy-lift launch with TerreStar-1". Arianespace.
  47. (21 July 2018). "SpaceX Falcon 9 sets new record with Telstar 19V launch from SLC-40". NASASpaceFlight.com.
  48. (29 October 2010). "EUTELSAT STATEMENT on LOSS OF W3B SATELLITE". Eutelsat Communications.
  49. (4 November 2010). "All Systems Are Nominal Aboard Lockheed Martin Bsat-3b Satellite Following 28 October 2010 Launch". Lockheed Martin.
  50. Clark, Stephen. (15 August 2020). "Debuting upgrades, Ariane 5 rocket deploys three U.S.-built satellites in orbit". Spaceflight Now.
  51. Amos, Jonathan. (January 9, 2022). "James Webb telescope completes epic deployment sequence". [[BBC News]].
  52. Berger, Eric. (10 January 2022). "All hail the Ariane 5 rocket, which doubled the Webb telescope's lifetime". [[Ars Technica]].
  53. (22 April 2011). "Arianespace launch a success: Yahsat Y1A and Intelsat New Dawn in orbit". Arianespace.
  54. (2 August 2012). "Arianespace launch a success: Ariane 5ECA orbits INTELSAT 20 and HYLAS 2 satellites". Arianespace.
  55. (7 February 2013). "Arianespace orbits Amazonas-3 and Azerspace/Africasat-1a satellites; First Ariane 5ECA mission in 2013 a success". Arianespace.
  56. (18 June 2016). "Arianespace makes history on its latest Ariane 5 mission". Space Daily.
  57. "BRI Launches BRISat: First Satellite Owned and Operated by a Bank".
  58. (24 August 2016). "Intelsat Pair lifted into Orbit in Record-Setting Ariane 5 Launch". Spaceflight 101.
  59. (1 June 2017). "Arianespace marks its 2017 mid-year launch milestone with a record-setting Ariane 5 mission at the service of ViaSat and Eutelsat". Arianespace.
  60. Clark. (2 January 2018). "Live coverage: Ariane 5 launches with SES 14 and Al Yah 3 telecom satellites". Spaceflight Now.
  61. (26 January 2018). "Ariane 5 satellites in orbit but not in right location". Yahoo! News.
  62. (4 September 2018). "SES-14 Goes Operational to Serve the Americas". SES.
  63. (28 August 2018). "SES Swaps SES-12 and SES-14 Launches". SES.
  64. "Yahsat confirms launch of Al Yah 3 mission Satellite to greatly increase its global coverage".
  65. McDowell. (16 February 2018). "The Al Yah 3 satellite put in the wrong orbit by the last Ariane launch is now approaching GEO; current orbit 22.5 hr period, 20828 x 47262 km x 6.2°".
  66. "Independent Enquiry Commission announces conclusions concerning the launcher trajectory deviation during Flight VA241". Arianespace.
  67. (29 January 2018). "After 16 years, Ariane 5 finally fails". The Avion.
  68. "Investigation Pinpoints Cause of Ariane 5 Partial Failure". Parabolic Arc.
  69. (1997). "V88 Ariane 501".
  70. (8 April 1998). "Ariane 502—Results of detailed data analysis". ESA.
  71. (21 July 2019). "Eutelsat W3B, W3C, W3D / Eutelsat 3D, 16A". Gunter's Space Page.
  72. (5 September 2017). "Ariane 5 Suffers Rare On-Pad Abort after Engine Ignition". Spaceflight 101.
  73. "Azerspace/Africasat-1a is prepared for Arianespace's first Ariane 5 launch in 2013".
  74. (20 June 2016). "BRI Launches BRISat: First Satellite Owned and Operated by a Bank". Jakarta Globe.
  75. (30 January 2017). "Intelsat satellite in service after overcoming engine trouble". Spaceflight Now.
  76. (1 September 2017). "Intelsat-33e propulsion problems to cut service life by 3.5 years". SpaceNews.
  77. Rainbow, Jason. (2024-10-20). "Intelsat 33e breaks up in geostationary orbit". SpaceNews.
  78. "SkyBrasil-1 (Intelsat 32e)". Gunter's Space Page.
  79. (23 March 2017). "A rocket's launch from French Guiana has been delayed indefinitely due to protests". The Verge.
  80. (2 June 2017). "Ariane 5 succeeds in launch of two high-value communications satellites". Spaceflight Now.
  81. (1 June 2017). "Two high-power broadband satellites set for record-breaking launch on Ariane 5 rocket".
  82. (5 June 2019). "SpaceX Falcon 9 and US$1 billion satellite trio set for first California launch in months". Teslarati.
  83. (15 February 2018). "Viasat says ViaSat-2 business plan intact despite antenna glitch". Space News.
  84. (9 September 2017). "Electrical problem prompted Ariane 5 countdown abort". Spaceflight Now.
  85. "Launch VA241: Ariane 5 delivers SES-14 and Al Yah 3 to orbit". Arianespace.
  86. (26 January 2018). "Probe into off-target Ariane 5 launch begins, SES and Yahsat payloads healthy". Spaceflight Now.
  87. (26 January 2018). "SES-14 in good health and on track despite launch anomaly". SES.
  88. (12 March 2018). "YahSat to make 50% insurance claim". Advanced Television.
  89. (20 March 2018). "Yahsat expected to file US$108 million claim for loss of life on Al Yah 3 satellite because of @Arianespace @ArianeGroup Ariane 5 off-target orbital injection".
  90. (5 April 2018). "Ariane 5 to return with DSN-1/Superbird-8 and HYLAS 4". NASASpaceFlight.com.
  91. Clark, Stephen. (3 July 2018). "Arianespace aims for busy second half of 2018". Spaceflight Now.
  92. (24 April 2018). "Launch delay for VA243". Arianespace.
  93. (26 December 2018). "GSat 11". Gunter's Space Page.
  94. Krebs, Gunter. (19 February 2020). "GEO-KOMPSAT 2A (GK 2A, Cheollian 2A)". Gunter's Space Page.
  95. "Geostationary Korea Multi Purpose Satellite (GEO-KOMPSAT, Cheollian)". Korea Aerospace Research Institute.
  96. (29 April 2015). "Arabsat contracts go to Lockheed Martin, Arianespace and SpaceX". Spaceflight Now.
  97. Krebs, Gunter. (19 February 2020). "EDRS C / HYLAS 3". Gunter's Space Page.
  98. (19 March 2015). "Arianespace selected by Airbus Defence and Space to launch EDRS-C satellite". Arianespace.
  99. (4 January 2017). "Arianespace to launch Intelsat 39". Arianespace.
  100. Henry, Caleb. (26 November 2019). "Ariane 5 launches satellites for Egypt, Inmarsat". SpaceNews.
  101. (27 October 2017). "Arianespace to launch Inmarsat's fifth Global Xpress satellite". Arianespace.
  102. Krebs, Gunter. (3 December 2019). "Inmarsat-5 F5 (GX 5)". Gunter's Space Page.
  103. (2 October 2019). "Fifth Global Xpress satellite readied for Ariane 5 launch". Arianespace.
  104. (26 November 2019). "Ariane Flight VA 250". Arianespace.
  105. Krebs, Gunter. (25 February 2020). "Eutelsat Konnect". Gunter's Space Page.
  106. [https://www.spacedaily.com/reports/Ariane_5s_third_launch_of_2020_999.html third launch of 2020]
  107. "Ariane Flight VA255".
  108. "DutchSpace on Twitter".
  109. Foust, Jeff. (10 September 2019). "Airbus and Telespazio to sell excess capacity on Syracuse 4 satellites".
  110. "DutchSpace on Twitter".
  111. "Ariane 5 Flight 501 Failure, Report by the Inquiry Board".
  112. "Ariane 5".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Ariane 5 — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report