From Surf Wiki (app.surf) — the open knowledge base
Alstom Metropolis C830C
Class of electric multiple units in Singapore
Class of electric multiple units in Singapore
| Field | Value | |||||
|---|---|---|---|---|---|---|
| name | {{SMRT Rolling Stock Infobox Colour | |||||
| enname | Alstom Metropolis C830C | |||||
| line | Circle | |||||
| image | C830C train at Kim Chuan Depot.jpg | |||||
| caption | A C830C train (Set 841) at Kim Chuan Depot | |||||
| interiorimage | C830C-Interior.JPG | |||||
| interiorcaption | Interior of C830C. | |||||
| stocktype | Electric multiple unit | |||||
| service | – present | |||||
| manufacturer | Shanghai Alstom Transport (Alstom and Shanghai Electric) | |||||
| factory | Shanghai, China | |||||
| family | Metropolis | |||||
| yearconstruction | 2014 – 2015 | |||||
| yearservice | ||||||
| numberbuilt | 72 vehicles (24 sets) | |||||
| numberservice | 72 vehicles (24 sets) | |||||
| formation | 3 per trainset | |||||
| Mc1–T–Mc2 | ||||||
| fleetnumbers | 841 – 864 | |||||
| capacity | 931 passengers | |||||
| operator | SMRT Trains Ltd (SMRT Corporation) | |||||
| depots | Kim Chuan | |||||
| lines | Circle Line | |||||
| carbody | Welded aluminium | |||||
| trainlength | 70.1 m | |||||
| carlength | {{plainlist | |||||
| * {{convert | 23.65 | m | ftin | frac | 8 | abbr=on}} (Mc) |
| * {{convert | 22.8 | m | ftin | frac | 8 | abbr=on}} (T) |
| width | 3.2 m | |||||
| height | 3.7 m | |||||
| doors | 1450 mm, 8 per car, 4 per side | |||||
| maxspeed | {{plainlist | |||||
| * {{convert | 90 | km/h | abbr | on}} (design) | ||
| * {{convert | 78 | km/h | abbr | on}} (service) | ||
| traction | Alstom OPTONIX IGBT–VVVF | |||||
| traction motors | 8 × 150 kW 3-phase AC induction motor | |||||
| poweroutput | 1.2 MW | |||||
| acceleration | 1.1 m/s2 | |||||
| deceleration | ||||||
| * {{convert | ?.? | m/s2 | abbr | on}} (Service) | ||
| * -->{{convert | 1.3 | m/s2 | abbr | on}} (Emergency) | ||
| electricsystem | ||||||
| collectionmethod | Collector shoe | |||||
| uicclass | Bo′Bo′+2′2′+Bo′Bo′ | |||||
| brakes | Regenerative and pneumatic | |||||
| safety | Alstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI | |||||
| coupling | Scharfenberg | |||||
| gauge |
Mc1–T–Mc2
- 23.65 m (Mc)
- 22.8 m (T) | art-sections =
- 90 km/h (design)
- 78 km/h (service)
- ?.? m/s2 (Service)
- --1.3 m/s2 (Emergency)
The Alstom Metropolis C830C is the second generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the Circle Line of Singapore's Mass Rapid Transit (MRT) system. 24 trainsets of three cars were manufactured by Shanghai Alstom Transport Co Ltd (a joint venture between Alstom and Shanghai Electric), with deliveries from end June 2014.
Tender
The tender for trains under the contract 830C was opened together with another contract C751C for an additional 18 North East Line trains which closed on 18 July 2011 with five bids. The Land Transport Authority shortlisted all of them, and the tender results were published on 1 February 2012.
| S/N | Name of tenderer | Amount ($S) | |||||||
|---|---|---|---|---|---|---|---|---|---|
| **1** | **Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium** | url=https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5qmktlgi52sor9rc5r00c6xm8pg371lwhgx5hvtwu8381p6o95 | title=LTA and SMRT Award Contracts for New Trains. | date=1 February 2012 | access-date=16 November 2013 | publisher=Land Transport Authority | archive-date=26 October 2014 | archive-url=https://web.archive.org/web/20141026101256/http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=5qmktlgi52sor9rc5r00c6xm8pg371lwhgx5hvtwu8381p6o95 | url-status=live }} (Base Tender 1 - Offered in mixed currencies, and hence the differences of amount shown in the tender document.) |
| 2 | Kawasaki Heavy Industries, Ltd. / Kawasaki Heavy Industries(Singapore) Pte Ltd & CSR Qingdao Sifang Consortium / Singapore CSR Sifang Railway Vehicles Service Pte. Ltd. Consortium | 198,321,046.16 (Base Tender 1) | |||||||
| 3 | Hyundai Rotem Company | 149,121,600.00 (Base Tender 1) | |||||||
| 4 | Construcciones y Auxiliar de Ferrocarriles, S.A. | 115,576,832.68 (Base Tender 1) | |||||||
| 5 | CRRC Zhuzhou Locomotive (formerly CSR Zhuzhou Electric Locomotive Co., Ltd.) / Siemens Pte Ltd, Singapore Consortium | 121,842,307.69 (Base Tender 1) |
Design
The body shell of the C830C is identical to that its predecessor, the C830, with slight differences such as a larger SMRT logo up front and a different interior. The reserved seats are coloured red to distinguish them from normal seats. dark blue- and lemon yellow-coloured seats are installed in the driving motor cars (end carriages) while the seats in the middle car are khaki. The train is equipped with traction motors louder than its predecessor, identical to those found on the M5 Series of the Amsterdam Metro.
Other changes include the inner layer of the doors finished in bluish-grey, a dynamic route map display, similar to that of C951(A), located above the doors and a new gangway design similar to that of the C751C.
The headlights on C830Cs are also brighter than those on the C830s.
Features

The C830C features a dynamic route map display, letting commuters know what the current and next station is, as well as green blinking lights which indicate on which side the doors will open when the train reaches the station.
There is also a dynamic in-train route display, which provides commuters with their route information throughout their journey, and also indicates which side the doors will open. DRMD panels are installed in these trains, which will be slightly modified in 2026 to include Keppel, Cantonment and Prince Edward Road stations on the Circle Line Stage 6.
At most stations on the Circle Line, the train doors open on the right side, but at some stations like Promenade (Towards HarbourFront) and Bayfront (Towards Stadium) as well as the terminal stations like Dhoby Ghaut and Marina Bay, some trains may open their doors on the left.
Driverless operation
The C830C is fully driverless under normal circumstances, using CBTC which do not require traditional "fixed-block track circuits" for determining train position. Instead, they rely on "continuous two-way digital communication" between each controlled train and a wayside control center, which may control an area of a railroad line, a complete line, or a group of lines. Recent studies consistently show that CBTC systems reduce life-cycle costs for the overall rail property and enhance operational flexibility and control.
Operational issues
Trainset 846 suffered from a faulty signalling hardware, resulting in intermittent signaling issues which caused widespread disruptions to the Circle MRT line for a week in both August and November 2016.
Train formation
The coupling configuration of a C830C in revenue service is Mc1–T–Mc2.
| Car type | Quantity | Driver cab | Motor | Collector shoe | Car length | Wheelchair bay | m | ft in |
|---|---|---|---|---|---|---|---|---|
| **Mc** | 2 | ✓ | ✓ | ✓ | 23.65 m | ✗ | ||
| **T** | 1 | ✗ | ✗ | ✓ | 22.8 m | ✓ |
The car numbers of the trains range from 841x to 864x, where x depends on the carriage type. Individual cars are assigned a 4 digit serial number by the rail operator SMRT Trains. A complete three-car trainset consists of one trailer (T) and two driving motor (Mc) cars permanently coupled together. For example, set 841 consists of carriages 8411, 8412, 8413.
- The first digit is always an 8.
- The second and third digits identify the set number.
- The fourth digit identifies the car number, where the first car has a 1, the second has a 2 and the third has a 3.
- Alstom built sets 841 – 864.
References
References
- (23 July 2014). "Driverless trains delivered to Singapore". Railway Gazette.
- "Alstom to supply 34 Metropolis trains and signalling upgrade to Singapore metro".
- "Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world".
- "URBALIS Evolution: Controlling the Performance".
- (23 July 2014). "Alstom delivers the first two metros built in Asia for LTA in Singapore".
- link. (2016-11-30 - Land Transport Authority, 1 Feb 2012)
- [https://www.lta.gov.sg/data/apps/tender/doc/484/751C_830C_Tender_Schedule_Financial.pdf CONTRACT 751C & 830C] {{Webarchive. link. (2016-11-30 - Land Transport Authority)
- (1 February 2012). "LTA and SMRT Award Contracts for New Trains.". Land Transport Authority.
- "Alstom Metropolis C830C".
- "Urbalis control system".
- (11 November 2016). "Mystery of Circle Line's signalling woes solved, train with faulty signalling hardware to blame: LTA". Straits Times.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Alstom Metropolis C830C — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report