From Surf Wiki (app.surf) — the open knowledge base
79th station
Chicago "L" station
Chicago "L" station
| Field | Value | |||
|---|---|---|---|---|
| custom_header | ||||
| image | Northbound track at 79th, looking north.jpg | |||
| address | 15 West 79th Street | |||
| Chicago, Illinois 60620 | ||||
| coordinates | ||||
| style | CTA | |||
| line | Dan Ryan Branch | |||
| other | CTA bus | |||
| platform | 1 Island platform | |||
| structure | Expressway median | |||
| tracks | 2 | |||
| parking | No | |||
| bicycle | Yes | |||
| opened | September 26, 1969 (formal opening) | |||
| September 28, 1969 (full service) | ||||
| rebuilt | 1977–80 (new entrance, elevator added) | |||
| 2005–06 (renovation) | ||||
| 2013 (refurbished) | ||||
| accessible | Yes | |||
| owned | Chicago Transit Authority | |||
| former | 79th/State (station sign) | |||
| pass_year | 2024 | |||
| passengers | 1,017,614 | |||
| pass_percent | 7.1 | |||
| pass_rank | ||||
| services | ||||
| mapframe | yes | |||
| mapframe-zoom | 15 | |||
| mapframe-marker-color | #c60c30 | |||
| mapframe-marker | rail-metro | |||
| map_state | collapsed | |||
| route_map | {{Routemap | legend=track | inline=1 | map= |
| RP4!~POINTERg@fq\uSTR\uSTR\RP4!~POINTERg@fq~~ ~~ ~~{{jctrdt | state | IL | I | 94}} (Dan Ryan Expy.) |
Chicago, Illinois 60620
September 28, 1969 (full service)
2005–06 (renovation)
2013 (refurbished)
| mapframe-zoom = 15
| mapframe-marker-color = #c60c30
| mapframe-marker = rail-metro
RP4!~MFADEg\uSTR!~MFADEg\uSTR!~MFADEg\RP4!~MFADEg
RP4\uSTRf\uSTRg!~POINTERf@gq\RP4~~ ~~ ~~ *north to *
RP4uhRP4\uSKRZ-G4h\uSKRZ-G4h\RP4uhRP479th St.
RP4\uPSTR(L)\uPSTR(R)\RP4
RP4\uPSTR(L)\uPSTR(R)\RP4
RP4\uPSTR(L)\uPSTR(R)\RP4
RP4!~POINTERg@fq\uSTR\uSTR\RP4!~POINTERg@fq ~~ ~~ (Dan Ryan Expy.)
RP4\uSTRf!~POINTERg@fq\uSTRg\RP4~~ ~~ ~~ *south to *
RP4!~MFADEf\uSTR!~MFADEf\uSTR!~MFADEf\RP4!~MFADEf
79th is a station on the Chicago Transit Authority's 'L' system, serving the Dan Ryan branch of the Red Line. The station is located in the median of the Dan Ryan Expressway. It was the first station on the Dan Ryan branch to feature an elevator for accessibility. The station's location is between the Greater Grand Crossing and Chatham neighborhoods.
79th closed from May 19, 2013, to October 20, 2013, for the Red Line South Reconstruction Project.
Bus connections
CTA
- South Halsted
- Wentworth (Weekdays only)
- State
- 74th/75th
- 79th (Owl Service)
References
References
- (September 25, 1969). "New 'L' Route to Open With a Free Ride". [[The Chicago Tribune]].
- (September 27, 1969). "Dedicate Ryan's CTA". [[The Daily Calumet]].
- (January 22, 2025). "Annual Ridership Report – Calendar Year 2024". [[Chicago Transit Authority]].
- "Archived copy".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about 79th station — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report