Skip to content
Surf Wiki
Save to docs
geography/united-states

From Surf Wiki (app.surf) — the open knowledge base

19th Street Oakland station

Metro station in Oakland, California, US

19th Street Oakland station

Metro station in Oakland, California, US

FieldValue
name19th St/Oakland
styleBART
imageTrains at 19th Street Oakland station, July 2025.jpg
image_captionNorthbound Orange Line and Yellow Line trains at the upper platform in 2025
address1900 Broadway
boroughOakland, California
coordinates
lineBART K-Line
structureUnderground
platform1 island platform (upper level)
1 side platform (lower level)
tracks3 (2 on upper level, 1 on lower level)
connectionsAC Transit: NL, Tempo, 6, 12, 18, 51A, 72, 72L, 72M, 88 800, 802, 805, 851
bicycleRacks, bike station, lockers
accessibleYes
architectGerald McCue & Associates
code
opened
rebuilt1980–1986, 2019
passengers
pass_year
services{{Adjacent stations
system1BART
line1Orangeleft1=12th Street Oakland City Centerright1=MacArthur
line2Redleft2=12th Street Oakland City Centerright2=MacArthur
line3Yellowleft3=12th Street Oakland City Centerright3=MacArthur
system4AC Transit
line4Tempoleft4=14th Streetto-left4=San Leandro BART
mapframeyes
mapframe-zoom14

1 side platform (lower level) | mapframe-zoom = 14

19th Street Oakland station (signed as 19th St/Oakland) is an underground Bay Area Rapid Transit (BART) station located under Broadway between 17th Street and 20th Street in the Uptown District of Oakland, California. It is a timed transfer point between northbound trains to Richmond and to Antioch. The station has three underground levels, with tracks on the second and third levels. It is served by the , , and , as well as by AC Transit buses on the surface at the Uptown Transit Center.

The station opened in 1972 as part of the first section of BART. In 1980–1986, the KE Track project added the third track to the station. Changes during the 2010s included public art at one entrance, a new canopy at another entrance, and opening of a bike station. A 2019–2023 modernization project included a new elevator and reopened public restrooms. Tempo bus rapid transit service began in 2020.

Station layout

AC Transit bus at Uptown Transit Center

The station has three underground levels. The first level is a concourse with ticket machines and faregates. An island platform and two main tracks (C1 and CX) for northbound trains (bound for and ) are on the second level. A side platform with one track (C2) for southbound trains (bound for or San Francisco) is on the third level.

The station has six public entrances: two at 20th Street, two at 19th Street, and two at 17th Street (one in an alley connecting to Telegraph Avenue). A surface elevator is located near 17th Street on the east side of Broadway; platform elevators are located at both ends of the station. There is a direct entrance from the mezzanine level to the 1970 Broadway building, as well as a disused entrance to 1955 Broadway.

The surface streets around 19th Street Oakland station are a major transfer point for AC Transit buses. The Uptown Transit Center, located on 20th Street west of Broadway, consists of six large shelters built in September 2006 to improve the ease of transfers. A number of routes stop on 20th Street shelters and/or on Broadway at the station:

  • Transbay: NL
  • Local: 6, 12, 18, 51A, 72, 72L, 72M, 88
  • All-Nighter: 800, 802, 805, 851

Tempo route 1T service uses dedicated platforms on Broadway. The southbound platform is just south of 20th Street; the northbound (terminating) platform is between 17th Street and 19th Street.

History

A 1960s model of the station
The 2015-built canopy at the 20th Street entrance

19th Street Oakland station, along with and stations, was designed by Gerard McCue and Associates. By August 1965, the city wanted to called the station "Oakland Downtown North", while BART preferred "Oakland-19". In October 1965, a BART committee recommended "19th Street". The BART Board approved 19th Street Oakland as the name that December. The station opened on September 11, 1972, as part of the first section of BART to open; service was extended to Richmond the next year. Service to Concord was added on May 21, 1973, and extended to San Francisco through the Transbay Tube on September 16, 1974. Richmond–San Francisco service was added on April 19, 1976.

The station was initially built without an elevator between the mezzanine and street level because the city of Oakland refused to allow elevator kiosks on the sidewalks. In March 1972, BART reached an agreement with The Bank of Tokyo for an easement to build an elevator in the building the bank was constructing at 1750 Broadway. The bank building and elevator opened on April 30, 1973; a remote teller window at the mezzanine level opened soon afterwards.

The station initially had one side platform on each level, with one track on the east side of each platform. The KE Track project, begun in 1980 and completed on March 17, 1986, converted the upper platform to an island platform with a new west track (Track CX). The new track was originally used for peak hour service (southbound towards San Francisco in the morning, and northbound in the evening).

Schedule changes on June 22, 1992, introduced timed transfers between Richmond–Fremont line and Concord–Daly City line trains; Oakland City Center/12th Street was the transfer point between northbound (Richmond-bound and Concord-bound) trains, while MacArthur station was the transfer point between southbound trains.

The Telegraph Avenue entrance was closed from October 14, 2013, to September 30, 2014, for renovations by the City of Oakland. The work included the installation of a kinechromatic sculpture, Shifting Topographies, by Dan Corson. The artwork consists of topographic contour layers of high-density foam coated with a color-shifting paint, which changes hue based on the sun angle and viewing angle. The entrance was closed again from February 3 to March 6, 2015, for the installation of colored glass panels covering vent shafts adjacent to the entrance.

In 2013, BART began design of a prototype glass canopy for the station entrance on the northeast corner of 20th Street and Broadway. The canopy would protect the escalator from weather damage, improve lighting, and allow the escalator to be fully closed off when the station is not open. The BART board voted to construct the canopy in January 2014; it was completed in March 2015 and includes real-time train arrival information screens at street level. The canopy reduced escalator downtime by one-third, prompting the installation of similar canopies at downtown San Francisco stations beginning in 2017.

Construction of the Oakland–San Leandro East Bay Bus Rapid Transit line (later branded Tempo) began in August 2016. Original plans had called for the line to use surface stops on 20th Street at the Uptown Transit Center. However, with the Berkeley leg on Telegraph Avenue cancelled, the stops were instead built on Broadway. Tempo route 1T service began on August 9, 2020.

A bike station in a storefront at 19th Street opened in February 2015. By 2017, the station filled on most weekday mornings; construction of a larger station on BART-owned land at 21st Street was recommended.

A 2014 study produced a conceptual design for modernization of the station. A $32.7 million contract for a renovation project was awarded in July 2019. The three separate paid areas were consolidated, a new platform elevator added to the north end of the station, and the 2001-closed public restrooms rebuilt and reopened. The consolidation placed the elevator to the platforms inside paid area.

Construction began on January 25, 2020. Several entrances were closed from April 13, 2020, to June 12, 2021, due to low ridership during the COVID-19 pandemic. The entrance at the northwest corner of 20th Street and Broadway closed on June 15, 2021, for about six months as part of construction work. The Telegraph Avenue entrance was closed prior to this. The remodeled restrooms opened on February 25, 2022. A ribbon-cutting ceremony for the completed project was held on January 21, 2023.

References

References

  1. Cerny, Susan Dinkelspiel. (2007). "An Architectural Guidebook to San Francisco and the Bay Area". Gibbs Smith.
  2. Burks, John. (September 12, 1972). "1st Day Smash Hit With Happy BART Riders". San Francisco Examiner.
  3. (July 6, 2022). "Station Map: 19th Street Oakland Station". Metropolitan Transportation Commission.
  4. Environmental Science Associates. (February 2019). "1750 Broadway Project CEQA Checklist/Exemption Report". City of Oakland.
  5. (June 2017). "BART Bicycle Program Capital Plan". San Francisco Bay Area Rapid Transit District.
  6. "Approved Projects: Uptown Transit Center". Alameda-Contra Costa Transit District.
  7. "Uptown Transit Center Project". NTK Construction.
  8. (June 8, 2023). "Transit Stops: 19th Street/Oakland Station". Metropolitan Transportation Commission.
  9. (2007). "An Architectural Guidebook to San Francisco and the Bay Area". Gibbs Smith.
  10. (August 24, 1965). "Differences On Transit Stop Names". Oakland Tribune.
  11. (October 20, 1965). "A Name For BART Station?". Oakland Tribune.
  12. (December 10, 1965). "Names Approved for 38 Rapid Transit Stations Around Bay". Oakland Tribune.
  13. {{BART History
  14. Demoro, Harre W.. (November 7, 1973). "BART Board Gives Nod To Oakland Station Job". Oakland Tribune.
  15. (September 10, 1972). "Strike Delays Elevator Service at Some Stations". Oakland Tribune.
  16. Kusserow, H.W.. (March 10, 1972). "BART Pay Hike Delay". The San Francisco Examiner.
  17. Demoro, Harre W.. (March 8, 1972). "Transit Elevator Plan Threatened". Oakland Tribune.
  18. Bank of Tokyo. (April 30, 1973). "[Advertisement]". Oakland Tribune.
  19. "Annual Report 1985–86". San Francisco Bay Area Rapid Transit District.
  20. Mahon, Vincent P.. "Track Rehabilitation and New Construction in An Operating Environment at BART". Transportation Research Record.
  21. Marino, Frank. (July 1986). "BART".
  22. Chin, Steven A.. (June 12, 1992). "More, faster service slated by BART". San Francisco Examiner.
  23. (August 25, 2010). "Minor BART schedule changes on Monday, September 13". San Francisco Bay Area Rapid Transit District.
  24. (July 1, 2014). "CITY OF OAKLAND TO IMPROVE 17TH STREET GATEWAY ENTRANCE AT 19TH STREET STATION". San Francisco Bay Area Rapid Transit District.
  25. "Current Public Art Projects". City of Oakland.
  26. Corson, Dan. "Shifting Topographies".
  27. (January 28, 2015). "17th St. entrance to 19th Street Station closed until March 6, 2015". San Francisco Bay Area Rapid Transit District.
  28. "Public Art in Oakland". City of Oakland.
  29. (June 27, 2013). "BART designing prototype escalator canopy to protect customers, employees and machinery". San Francisco Bay Area Rapid Transit District.
  30. (January 9, 2014). "BART to Build New Station Entrance Canopy at 19th Street Station". San Francisco Bay Area Rapid Transit District.
  31. (March 6, 2015). "BART unveils new glass canopy entrance". San Francisco Bay Area Rapid Transit District.
  32. (2017). "SF BART and Muni Escalator/Entrance Project". San Francisco Bay Area Rapid Transit District.
  33. (August 26, 2016). "AC Transit Announces the Groundbreaking Ceremony for the East Bay Bus Rapid Transit". Alameda-Contra Costa Transit District.
  34. (January 2012). "AC Transit East Bay BRT Project: Final Environmental Impact Statement/ Environmental Impact Report".
  35. (August 7, 2020). "AC TRANSIT TEMPO OPENS TO RIDERS SUNDAY, AUGUST 9". Alameda-Contra Costa Transit District.
  36. (February 25, 2015). "New Uptown Oakland Bike Station now open". San Francisco Bay Area Rapid Transit District.
  37. "19th St Oakland Bike Station". San Francisco Bay Area Rapid Transit District.
  38. AECOM. (October 31, 2014). "Final Report: 19th Street Oakland Station Modernization Program Conceptual Design Plan". San Francisco Bay Area Rapid Transit District.
  39. (July 25, 2019). "BART Board Moves Forward with Quality of Life Initiatives and Station Modernization". San Francisco Bay Area Rapid Transit District.
  40. (2016). "GO Uptown Gateway to Oakland Uptown: 2016 TIGER Grant Project Summary". San Francisco Bay Area Rapid Transit District.
  41. (April 3, 2023). "Art at BART: The stories of the new artworks at modernized 19th Street Station in Oakland". San Francisco Bay Area Rapid Transit District.
  42. (January 31, 2020). "Construction for 19th Street Oakland Station modernization set to begin". San Francisco Bay Area Rapid Transit District.
  43. (June 12, 2021). "BART opens all entrances/exits that were previously closed due to pandemic". San Francisco Bay Area Rapid Transit District.
  44. (May 28, 2021). "19th St. Station entrance closed for improvements starting June 15". San Francisco Bay Area Rapid Transit District.
  45. (February 25, 2022). "Congresswoman Barbara Lee joins BART in reopening long-closed restrooms at 19th Street/Oakland Station Friday". San Francisco Bay Area Rapid Transit District.
  46. (January 21, 2023). "Transformation of 19th Street Station celebrated with a ribbon cutting". San Francisco Bay Area Rapid Transit District.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about 19th Street Oakland station — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report