Variable gauge

System used by trains to cross a break of gauge


title: "Variable gauge" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["track-gauges", "rolling-stock", "vehicle-technology", "international-rail-transport"] description: "System used by trains to cross a break of gauge" topic_path: "sports" source: "https://en.wikipedia.org/wiki/Variable_gauge" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

::summary System used by trains to cross a break of gauge ::

Variable gauge systems allow railway vehicles to travel between two railways with different track gauges. Vehicles are equipped with variable gauge axles (VGA). The gauge is altered by driving the train through a gauge changer installed at the break of gauge which moves the wheels to the gauge desired.

Variable gauge systems exist within the internal network of Spain, and are installed on international links between Spain/France (Spanish train), Sweden/Finland (Swedish train), Poland/Lithuania (Polish train) and Poland/Ukraine (Polish train).

A system for changing gauge without the need to stop is in widespread use for passenger traffic in Spain, for services run on a mix of dedicated high-speed lines (using Standard gauge) and older lines (using Iberian gauge). Similar systems for freight traffic are still in their infancy, as the higher axle weight increases the technological challenge. Although several alternatives exist, including transferring freight, replacing individual wheels and axles, bogie exchange, transporter flatcars or the simple transshipment of freight or passengers, they are impractical, thus a cheap and fast system for changing gauge would be beneficial for cross-border freight traffic.

Alternative names include Gauge Adjustable Wheelsets (GAW), Automatic Track Gauge Changeover Systems (ATGCS/AGCS), Rolling Stock Re-Gauging System (RSRS), Rail Gauge Adjustment System (RGAS), Shifting wheelset, Variable Gauge Rolling Truck, track gauge change and track change wheelset.

Overview

Variable gauge axles help solve the problem of a break-of-gauge without having to resort to dual gauge tracks or transshipment. Systems allow the adjustment between two gauges. No gauge changer designs supporting more than two gauges are used.

Systems

::figure[src="https://upload.wikimedia.org/wikipedia/commons/8/8d/Spurwechselradsatz_DR_III.jpg" caption="1524mm}} gauge, developed in 1957"] ::

There are several variable gauge axle systems:

Compatibility

The variable gauge systems are not themselves all compatible. The SUW 2000 and Rafil Type V systems are interoperable, as are TALGO-RD and CAF-BRAVA.

In 2009, at Roda de Barà near Tarragona, a Unichanger capable of handling four different VGA systems was under development.

International traffic

VGA is particularly important with international railway traffic because gauge changes tend to occur more often at international borders.

Features

Different systems have different limitations, for example, some can be used on carriages and wagons only and are unsuitable for motive power, while others require that rolling stock is unloaded before going through the gauge changer. When one of the gauges is narrow there may not be enough space between the wheels for the Brakes, Gauge Changer and the Traction Motors. ::data[format=table] | Country | Spain | Poland | Germany | Japan || Switzerland | System(s) | TALGO | CAF | SUW 2000 | Rafil V | RTRI | Stadler

  • Prose | |---|---|---|---|---|---|---|---|---|---|---|---| | Railways for which suitable | .es .eu | .es .eu | .eu .ua | .de .ru | .jp | .ch MOB | | | | | | | Passenger carriages | | | | | | | | | | | | | Goods wagons | | | | | | | | | | | | | Motive power (driven axles) | | | | | | | | | | | | | Under load (change with load on wheels) | | | | | | | | | | | | | Standard Gauge/Broader Gauge | | | | | | | | | | | | | Standard Gauge/Narrower Gauge | | | | | | | | | | | | ::
Maximum speed

The maximum speed of the trains equipped with the different technologies varies. Only CAF and Talgo produce high-speed VGA, allowing speeds up to 330 km/h.

Speed changing

The Talgo RD GC changes gauge at a speed of 15 km/h so a 100 m train takes only 24 seconds to convert.

Gauge changer

::figure[src="https://upload.wikimedia.org/wikipedia/commons/b/b1/A1-15v_Spurwechselanlage_Lérida.jpg" caption="A ''Talgo'' gauge changing system in [[Lleida]], Spain"] ::

A gauge changer is a device which forces the gauge adjustment in the wheels. Designs consist of a pair of running rails that gradually vary in width between the two gauges, combined with other rails and levers to perform the following steps, using Talgo RD as an example:

  1. Verify that all vehicles in train are suitable for Gauge Change.
  2. Support on – takes weight off lock and on the guide rails.
  3. Unlock.
  4. Move wheels to new position.
  5. Relock.
  6. Support off – put weight back on lock from the guide rails.
  7. Verify correct operation and generate statistics. Use ECPB power, supervisory or Digital automatic coupling (DAC) cables.

In the Spanish Talgo-RD system, a constant spray of water is used to lubricate the metal surfaces, to reduce heat and wear. A Talgo RD gauge changer is 20 m long and 6 m wide.

Limitations

At present the choice of gauge is limited to two out of three of and broad gauges and . With narrow gauges such as as found at Zweisimmen, Switzerland, there is less room between the wheels for the gauge change mechanism, the traction motors, and the brakes. The diameter of the wheels also limits the axleload to no more than 22.5 tonnes.

Operation

A variable gauge multiple unit, or a train including a variable gauge locomotive (e.g. Talgo 250) and rolling stock, may drive straight across a gauge changer. Normally the locomotive will not be able to change gauge, meaning that it must move out of the way whilst the remainder of the train itself passes through. On the opposite side, a new locomotive of the other gauge will couple to the train.

A Talgo train with a locomotive can drive across a gauge change at 1 axle per second at a speed of about 10-15 km/h.

A train (or an individual car) can be pushed halfway across the gauge-changer, uncoupled, and then (once far enough across) coupled to the new locomotive and pulled the rest of the way. A long length of wire-rope with hooks on the end means that the process can be asynchronous, with the rope used to bridge across the length of the gauge changer (to temporarily couple the arriving cars and receiving locomotive, although without braking control from the locomotive to the train vehicles).

On long-distance trains in Spain and night trains crossing from Spain into France, the arriving locomotive stops just short of the gauge changer, uncouples and moves into a short siding out of the way. Gravity then moves the train through the gauge changer at a controlled low speed. The new locomotive is coupled onto the front only after the full train has finished passing through the changer.

From 2014 gauge changing systems for freight wagons were being developed.

Countries

Australia

In 1933, as many as 140 inventions were offered to Australia railways to overcome the breaks of gauge between the different states. None was accepted. About 20 of these devices were adjustable wheels/axles of some kind or another, which may be analogous to the modern VGA. VGA systems were mostly intended for Broad Gauge and Standard Gauge lines.

Break of Gauge stations were installed at Port Pirie, Peterborough and Albury; these were fairly manual in operation. The newest installation was at Dry Creek and was of a more automatic design. The Talgo RD design is even more automatic and efficient.

Belarus/Poland

A Talgo gauge changing facility is installed at Brest near the Belarusian-Polish border. It is used by Russian Railways' fast trains connecting Moscow and Berlin.

Orders for 7 Talgo VGA trainsets placed were placed in 2011. The trains under the brand "Strizh" are in service since 2016.

Canada

Variable gauge axles were used for a while on the Grand Trunk Railway in the 1860s in Canada to connect and standard gauge without transshipment. Five hundred vehicles were fitted with "adjustable gauge trucks" but following heavy day-in, day-out use the system proved unsatisfactory, particularly in cold and snowy weather. The system used telescoping axles with wide hubs that allowed the wheels to be squeezed or stretched apart through a gauge-changer, after holding pins had been manually released.

Railway operations over the Niagara Bridge were also complicated.

Finland/Sweden

In 1999, a gauge-changer was installed at Tornio at the Finnish end of the dual-gauge section between Haparanda and Tornio, for use with variable gauge freight wagons. The Tornio gauge changer is a Rafil design from Germany; a similar Talgo-RD gauge changer at the Haparanda end used to exist, but was removed as it required de-icing in winter.

Train ferry traffic operated by SeaRail and arriving from Germany and Sweden by sea used bogie exchange facilities in the Port of Turku.

Georgia

A new gauge changer has been put in place in Akhalkalaki for Baku-Tbilisi-Kars railway. Northwestern end has rails apart, southeastern end has rails apart. Both bogie exchange and variable gauge adapters are provided.

Japan

::figure[src="https://upload.wikimedia.org/wikipedia/commons/8/86/FGT-9000_Matsubase_20141118.jpg" caption="The Japanese third-generation GCT "Gauge Change Train" EMU on a test run in November 2014"] ::

Main article: Gauge Change Train

The "Gauge Change Train" is a project started in Japan in the 1990s to investigate the feasibility of producing an electric multiple unit (EMU) train capable of operating both the Shinkansen high-speed network at 270-300 km/h and the original network at 130-140 km/h. See .

The first-generation train was tested from 1998 to 2006, including on the US High-speed Test Track in 2002. The second-generation train, intended to run at a maximum speed of 270 km/h, was test-run in various locations in Japan between 2006 and 2013. A third-generation train has been undergoing reliability trials since 2014 in preparation for potential introduction to service on the planned Kyushu Shinkansen extension to Nagasaki.

Gallery

File:Free Gauge Train GCT-01 at kamogawa.jpg|The first-generation "Gauge Change Train" EMU in May 2003 File:Gauge Changing Train 20120912.jpg|The second-generation "Gauge Change Train" EMU in September 2012

Lithuania/Poland

A gauge changing facility of the Polish SUW 2000 system is installed at Mockava north of the Lithuanian-Polish border. VGA passenger trains between Lithuania and Poland were running between October 1999 and May 2005, and VGA goods trains between early 2000s and 2009.

Poland/Ukraine

There are two gauge changing facilities of the Polish SUW 2000 system installed on the Polish-Ukrainian border, one of them in Dorohusk (Poland) on the Warsaw-Kiyv line, another in Mostyska (Ukraine) on the Kraków-Lviv line. On 14 December 2003 VGA passenger trains were introduced between Kraków (Poland) and Lviv (Ukraine) instead of bogie exchange. VGA saves about 3 hours compared to bogie exchange. The trains last ran in 2016.

Spain

Spain is the largest user of variable gauge systems. This is because of the need to connect older mainlines built to Iberian gauge and extensive new high-speed railway lines and connections to France, using the standard gauge. Two gauge changes are installed on lines to France and at all entrances/exits leading between the high-speed network and older lines. There are also significant lengths of secondary lines but these are not connected to the main network.

In February 2004, RENFE placed orders for:

  • Forty-five CAF/Alstom 25 kV AC/3 kV DC, variable gauge EMUs for 250 km/h regional services, between October 2006 and May 2009 (€580 million)
  • Twenty-six 25 kV AC variable gauge trains for 250 km/h long-distance services using two Bombardier power cars and Talgo Series VII trailer cars (€370 million) Gauges involved are and .
  • Olmedo to Medina del Campo in Valladolid, Spanish test track.{{cite news |url=http://findarticles.com/p/articles/mi_m0BQQ/is_/ai_84183158 |title=GIF develops dual-gauge track |date=March 2002 |access-date=2008-12-07 |work=International Railway Journal |archive-url=https://web.archive.org/web/20081011164742/http://findarticles.com/p/articles/mi_m0BQQ/is_/ai_84183158 |archive-date=2008-10-11 |quote= A new test track, which opened in December 2001, is being used to help develop and test the dual-gauge concept. The 14.4 km track between Olmedo and Medina del Campo in Valladolid province, includes 10 km of tangent track (part of the old Segovia-Medina line, which has been out of service since 1993), a gauge-changing facility, workshops, and a technical building for the interlocking. ... The test track is not yet electrified, so initial tests, which started in January, were conducted using a Talgo XXI diesel train. Tests include running through turnouts and crossings at a maximum of 242 km/h on plain track and 110 km/h on deviations. |df=dmy-all }}
  • November 2008 – High Speed trainset for Cadiz to Warsaw.
  • July 2009 – Talgo 250 supplied with Voith Turbo SZH-692 gauge change final drives.

There is also a 14.4 km circular test track in Spain.

Switzerland

::figure[src="https://upload.wikimedia.org/wikipedia/commons/d/d6/ZweisUm5.jpg" caption="MOB gauge changing system at Zweisimmen"] ::

Variable gauge bogies are implemented on the Montreux–Gstaad–Zweisimmen–Spiez–Interlaken line. Trains automatically switch from to at Zweisimmen. The bogie has no axles, which allow the bogie half frames holding the wheels on both sides to slide sideways relative to each other. The EV09-Prose gauge changer at Zweisimmen was satisfactorily tested on 19 June 2019. The system, designed to allow operation on both Montreux Oberland Bernois Railway's (MOB) 1000mm gauge line and BLS AG 1435mm gauge infrastructure, was first implemented on 11 December 2022. Moreover, while the gauge is being automatically changed at Zweisimmen, the air spring mounted on the bogie cross member is automatically adjusted by 200 mm to match the body height with the platform height on the MOB or BLS AG portion of the GoldenPass Express.

United Kingdom

John Fowler mentions in 1886 at attempt by the GWR to develop a "telescopical" axle.

Trams ran between Leeds () and Bradford ( gauge) following a successful trial in 1906 using Bradford tram car number 124. The system was later patented by – GB190601695 (A) of 1906. This system was improved again in patent GB190919655 (A) of 1909 by introducing a locking system acting on the wheel and axle rather than just the wheel rim. This provided a more effective grip where the wheel was free to move along the splined axle.

Comparison with bogie exchange

Time taken

In VGA, the train is pulled through the "adjuster" at about 15 km/h without any need to uncouple the wagons or disconnect (and test) the brake equipment. Alternatively, as the train need not be uncoupled, the locomotive may pull the coupled carriages all together.

See Talgo Gauge Changer.

Locomotives

Steam locomotive are generally not gauge convertible on-the-fly. While diesel locomotives can be bogie exchanged, this is not normally done owing to the complexity in the reconnection of cables and hoses. In Australia, some locomotives are transferred between gauges. The transfer might happen every few months, but not for an individual trip.

By 2004, variable gauge electric passenger locomotives were available from Talgo. It is not clear if variable gauge freight locomotives are available.

Electric

  • L-9202 is an experimental high speed Bo-Bo dual voltage (3 kV DC/25 kV AC) VGA locomotive.
  • Talgo 250 locomotives were also planned to haul dual-voltage variable-gauge trainsets from Montpellier 200 km from the border to Barcelona and Madrid. Two Talgo 250 power cars haul 11 passenger trailer cars.
  • EMU

Weight

  • A gauge adjustable bogie complete with wheelsets weighs a total of about one ton/tonne more than a conventional bogie and normally must use disc brakes, which cool more slowly.

History

    1. C. W. Prosser. – Argus
    1. C. R. Prosser. – Argus Friday 8 July 1921
    1. J. Grieve. – Argus 19 July 1922

References

References

  1. "New generation of gauge changeover Facilities: The UNICHANGER Project".
  2. "Avant Serie 121".
  3. (26 January 2017). "Frictions On The New Silk Road – Analysis". Eurasia Review.
  4. (2016). "Implementation of Automatic Gauge Changeover Systems: available technical solutions, cost effectiveness and standardisation. (AGCS)". UIC.
  5. (2007). "Shifting Wheelset". Machine Dynamics Problems.
  6. "The Variable Gauge Rolling Truck".
  7. (2001). "Development of the Trans-Asian Railway: Trans-Asian Railway in the North-south Corridor, Northern Europe to the Persian Gulf". United Nations.
  8. "Talgo Variable Gauge".
  9. "New Swift international train makes first journey with passengers from Moscow to Berlin". Russian Railways.
  10. [https://www.youtube.com/watch?v=Qekr4sKfpMo GC Freight]
  11. [https://www.youtube.com/watch?v=ZiH4kt14yGw Talgo RD video]
  12. [http://www.caf.net/ingles/productos/sistemas_brava.php BRAVA] {{webarchive. link. (February 4, 2012)
  13. "HIGH-SPEED TRAIN ATPRD s-120".
  14. "ÉCARTEMENTS VARIABLES: 'L' "ESSIEU MIRACLE" EST-IL NÉ DANS LE CANTON DE VAUD?". La Vie du Rail, No. 1415, 4 November 1973.
  15. "webvdr.com".
  16. [[Jane's World Railways]] 2002–2003 p165.
  17. [https://archive.today/20120604013708/http://findarticles.com/p/articles/mi_m0BQQ/is_7_39/ai_58678001 Variable-Gauge Wagon Wheelsets {{! International Railway Journal]
  18. Schwartze, Matthias. "Gauge change system could help ease movement between countries". Rail International/Live Engineer.
  19. (2007). "Automatische Spurwechseltechnik für Güterwagen: Derzeit wird der Warenaustausch auf der Schiene durch die in Europa vorhandenen unterschiedlichen Spurweiten stark beeinträchtigt". Eisenbahntechnische Rundschau.
  20. [http://sciencelinks.jp/j-east/article/199908/000019990899A0223348.php Science Links Japan {{! Development of Variable Gauge Bogie] {{webarchive. link. (February 6, 2012)
  21. (2009-03-18). "Science Links Japan | Development of Traction Motor for Adjustable Gauge Train". Sciencelinks.jp.
  22. "Archived copy".
  23. "INA ELGOGLIDE ® Plain Bushes in SUW 2000 Gauge Changeover Systems from ZNTK Poznán S.A.".
  24. "Archived copy".
  25. {{usurped
  26. [[Railway Gazette International]] December 2008 p 944
  27. "Maintenance and service - PROSE". prose.ch.
  28. Gyr, Christoph. (13 February 2023). "Split-frame bogies overcome the break of gauge". [[International Railway Journal]].
  29. Kanclerz, Miroslaw. (2007-10-09). "Study on European Automatic Track Gauge Changeover Systems (ATGCS)". UIC.
  30. [[Railway Gazette International]] July 2009, p 20
  31. [https://www.youtube.com/watch?v=ZiH4kt14yGw Talgo RD Gauge Change video]
  32. [See https://www.youtube.com/watch?v=ZiH4kt14yGw Gauge change in operation]
  33. [https://www.youtube.com/watch?v=ZiH4kt14yGw Gauge Change ]
  34. [https://www.youtube.com/watch?v=ZiH4kt14yGw Talgo GC in action.]
  35. [https://www.youtube.com/watch?v=Qekr4sKfpMo Gauge Change freight]
  36. (14 August 1933). "BREAK OF GAUGE.". National Library of Australia.
  37. (4 September 1918). "04 Sep 1918 – BREAK OF GAUGE PROBLEM REPORT OF BOARD OF EXPERT". Trove.nla.gov.au.
  38. DVV Media Group GmbH. "Gauge-changing trains ordered for Moscow – Berlin".
  39. "Introduction". Niagara Rails.
  40. (June 2003). "Break of Gauge at Prescott Junction". Colin Churcher's railway pages.
  41. "Break of Gauge at Prescott Junction". Railways.incanada.net.
  42. "Niagara Rails – Introduction". Home.cogeco.ca.
  43. (1998). "VR Annual Report 1998". [[VR Group]].
  44. Thorsten Büker. (December 2004). "border lines Sweden – Finland".
  45. Lars-Åke Josefsson. (2007-03-15). "A bridge between differences in infrastructure". [[Banverket]] (Swedish National Rail Administration).
  46. (2000). "Gauge Change Train. Development of Monitor System of Gauge Change Train". RTRI Report.
  47. (2003). "Developing a Gauge-Changing EMU". Quarterly Report of RTRI.
  48. "Japan Railway & Transport Review (see picture page 6)". jrtr.net.
  49. (1997-03-26). "Tractor bogie with incorporated gauge-change system – Patentes Talgo S.A". Freepatentsonline.com.
  50. (May 2016). "Shinkai Corporation".
  51. Ishige, Makoto. (September 1, 2003). "Development of Gauge-Changeable EMUs". Railway Technology Avalanche.
  52. (August 2007). "新形フリーゲージトレイン". Koyusha Co., Ltd..
  53. "East - intercity.pl".
  54. Kasper Fiszer. (31 December 2018). "Polska – Ukraina: Kolejny rok bez SUW 2000". Rynek Kolejowy.
  55. [[Railway Gazette International]] November 2008, p. 881
  56. "Droits insuffisants". Goldenpass.ch.
  57. "Factsheets - PROSE". prose.ch.
  58. "''EV09'' gauge-changing bogie - "Prose AG" company".
  59. "Gauge change system for GoldenPass Express in Zweisimmen - "Prose AG" company".
  60. (11 December 2022). "From MOB to BLS: The GoldenPass Express variable gauge explained".
  61. (1886). "16 Feb 1886 – Sir John Fowler at Adelaide. (Herald's Telegram)". Trove.nla.gov.au.
  62. (1907-01-22). "Inventions in Transport from Bradford". Mylearning.org.
  63. [https://worldwide.espacenet.com/classification?locale=en_EP#!/CPC=B61F7/00 Patent]
  64. (1999-07-01). "Variable-Gauge Wagon Wheelsets – Brief Article". International Railway Journal.
  65. [https://www.youtube.com/watch?v=ZiH4kt14yGw Talgo Gauge Change]
  66. [https://www.youtube.com/watch?v=ZiH4kt14yGw Talgo RD Gauge Changer]
  67. [[Motive Power]]{{Volume needed. (April 2009)
  68. (2005-06-16). "THE EST CRASH BUFFER – Information and References on the EST Crash Buffers G1, R1 and X1". Crashbuffer.com.
  69. "SKF supplies new bearing solutions for Spanish Talgo locomotives".
  70. (21 February 2006). "Transportation and Logistics". innovations-report.com.
  71. Idea TV GmbH. (21 February 2006). "High-speed locomotive". Innovations-report.com.
  72. (2008). "Der automatisch umspurbare HGV-Triebzug Talgo 250". ZEV Rail Glasers Annalen.
  73. (2007). "First gauge-changeable electric loco under test: what is claimed to be the world's first gauge-changeable high-speed electric locomotive is about to start the certification process in Spain. Talgo explains the background to this exciting project to David Briginshaw". International Railway Journal.
  74. "Archived copy".
  75. (7 May 1915). "07 May 1915 – BREAK OF GAUGE PROBLEM. AUTOMATIC SLIDING WHEELS". Trove.nla.gov.au.
  76. (1921-07-08). "08 Jul 1921 – BREAK OF GAUGE DEVICE. Demonstration Before Memb". Trove.nla.gov.au.
  77. (19 July 1922). "19 Jul 1922 – BREAK OF GAUGE PROBLEM. Captain Grieve's Device". Trove.nla.gov.au.