MPM-10

Metro train model used in Montreal


title: "MPM-10" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["montreal-metro", "train-related-introductions-in-2016", "alstom-multiple-units", "bombardier-transportation-multiple-units", "750-v-dc-multiple-units", "electric-multiple-units-of-canada"] description: "Metro train model used in Montreal" topic_path: "sports" source: "https://en.wikipedia.org/wiki/MPM-10" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

::summary Metro train model used in Montreal ::

::data[format=table title="Infobox train"]

FieldValue
nameMPM-10 (Azur)
imageAzur at Peel metro.tif
captionA MPM-10 train at Peel
interiorimageMETRO-AZUR-INTERIEUR.jpg
interiorcaptionInterior view of Azur train
service2016–present
manufacturerBombardier Transportation, Alstom
designerLabbé Designers et associés
factoryLa Pocatière (Bombardier) and Sorel-Tracy (Alstom)
replacedAll MR-63s, Some MR-73s
yearconstruction2011–2021
yearserviceFebruary 7, 2016
numberbuilt639 cars (71 sets)
numberservice639 cars (71 sets) (as of December 2021)
formation9 articulated cars per train
fleetnumbers(10-011 to 10-019) – (10-711 to 10-719)
capacity262 seats; 1,555 maximum capacity
operatorSociété de transport de Montréal
depotsPlateau d'Youville, Saint-Charles, Montmorency, Angrignon, Beaugrand, Côte-Vertu
lines{{plainlist
carbodyStainless steel and aluminium
trainlength152.43 m
width2.51 m
doors3 pairs per car
wheelbase2 m
maxspeed{{plainlist
* {{convert100
* {{convert72
weight26.5 t (238 t 9-car train)
tractionAlstom OPTONIX IGBTVVVF
traction motors14 × Alstom 4ELA 2848C 300 kW asynchronous 3-phase AC
poweroutput4200 kW
hvacFaiveley forced-air ventilation, in-train heater
electricsystem750 V DC (nominal) from "third rail" on guide bars at either track side
collectionmethodPCS side-running contact shoe
uicclass2′2′+B′B′+B′B′+B′B′+B′B′+B′B′+B′B′+B′B′+2′2′
aarwheels2-2+B-B+B-B+B-B+B-B+B-B+B-B+B-B+2-2
bogiesAlstom CL 449
brakesRegenerative braking with STM wooden brake shoes
safetyATC/ATO
multipleworkingBombardier TCMS
gaugebetween 2 roll ways
notes
::

| name = MPM-10 (Azur) | image = Azur at Peel metro.tif | imagealt = | caption = A MPM-10 train at Peel | interiorimage = METRO-AZUR-INTERIEUR.jpg | interiorimagealt = | interiorcaption = Interior view of Azur train | stocktype = | service = 2016–present | manufacturer = Bombardier Transportation, Alstom | designer = Labbé Designers et associés | factory = La Pocatière (Bombardier) and Sorel-Tracy (Alstom) | replaced = All MR-63s, Some MR-73s | yearconstruction = 2011–2021 | yearservice = February 7, 2016 | numberbuilt = 639 cars (71 sets) | numberservice = 639 cars (71 sets) (as of December 2021) | formation = 9 articulated cars per train | fleetnumbers = (10-011 to 10-019) – (10-711 to 10-719) | capacity = 262 seats; 1,555 maximum capacity | operator = Société de transport de Montréal | depots = Plateau d'Youville, Saint-Charles, Montmorency, Angrignon, Beaugrand, Côte-Vertu | lines = {{plainlist|

  • Green Line
  • Orange Line | carbody = Stainless steel and aluminium | trainlength = 152.43 m | carlength = | width = 2.51 m | height = | floorheight = | platformheight = | entrylevelorstep = | doors = 3 pairs per car | wheelbase = 2 m | maxspeed = {{plainlist|
  • 100 km/h (design)
  • 72 km/h (service) | weight = 26.5 t (238 t 9-car train) | acceleration = | deceleration = | traction = Alstom OPTONIX IGBTVVVF | traction motors = 14 × Alstom 4ELA 2848C 300 kW asynchronous 3-phase AC | poweroutput = 4200 kW | transmission = | aux = | powersupply = | hvac = Faiveley forced-air ventilation, in-train heater | electricsystem = 750 V DC (nominal) from "third rail" on guide bars at either track side | collectionmethod = PCS side-running contact shoe | uicclass = 2′2′+B′B′+B′B′+B′B′+B′B′+B′B′+B′B′+B′B′+2′2′ | aarwheels = 2-2+B-B+B-B+B-B+B-B+B-B+B-B+B-B+2-2 | bogies = Alstom CL 449 | brakes = Regenerative braking with STM wooden brake shoes | safety = ATC/ATO | coupling = | multipleworking = Bombardier TCMS | gauge = between 2 roll ways | notes =

The MPM-10 (Montréal Pneumatic Material 2010), commonly known as the Azur, is the third and newest generation of rubber-tired rolling stock used on the Montreal Metro in Canada, built by a consortium of Bombardier Transportation and Alstom. The first MPM-10 train entered into service on the Orange Line in February 2016, replacing the entire first-generation MR-63 fleet. 71 nine-car trains have been built, and are currently in service on the Orange and Green Lines.

History

By the mid-2000s, the original MR-63 Montreal Metro trains were around 40 years old, and maintenance costs were increasing. Société de transport de Montréal (STM) indicated that these trains would be replaced by modern rolling stock in the coming decade.

In May 2006, the Government of Quebec announced the negotiation of a $1.2 billion contract with Bombardier Transportation to replace the MR-63 fleet of 336 cars, then designated as MR-08. Trains were planned to enter service in the early 2010s. Alstom voiced its dismay over directly awarding the contract (to Bombardier) without a bidding process, noting that (like Bombardier) they would build new trains in Quebec. Negotiations between the STM and Bombardier were ongoing until 2007. The negotiations focused on the project's cost controls, terms of contract, train specifications and warranty. If negotiations had failed, the Quebec government and the STM would have reverted to a bidding process.

On 10 January 2008, Quebec Superior Court Judge Joel Silcoff rendered his decision regarding Alstom's filing of legal action against the Quebec government's Ministry of Transportation. The latter sought to bypass the bidding process, citing that Bombardier was the only domestic candidate capable of fulfilling the eventual contract. Silcoff ruled in favour of Alstom, enabling the company to bid on the contract.

As a consequence, the Government of Quebec decided to open the bidding process in February 2008, however this would delay delivery of the first trains by 9 to 12 months. In November 2008, Bombardier Transportation and Alstom announced that they would be submitting a joint bid to build the trains as a consortium.

In December 2009, CSR Zhuzhou Electric Locomotive expressed interest in bidding for the MR-08 contract citing a cheaper price than its competitors, and proposed an entirely steel-wheeled fleet of vehicles as opposed to the specified rubber-tired vehicles, citing advances in technology that gave steel wheels an advantage. CSR also proposed the construction of a factory in Quebec, creating up to 1,000 jobs and meeting the 60% Canadian content requirement. Spanish company CAF also expressed interest in the project, citing their experience in building rubber-tyred trains – as well as concern about protectionism. However, the STM subsequently rejected both proposals.

Contract award

In October 2010, the Quebec government awarded the contract to the Bombardier–Alstom consortium, valued at . Bombardier expected the first of the 468 cars to begin entering revenue service by February 2014, with deliveries continuing through 2018. Quebec would contribute 75% of the cost of the new trains, with Montréal providing the remainder.

In May 2012, STM announced that the name of the train would be Azur, following a public vote of shortlisted names. They stated that the name was "evocative of the intense shade of clear blue" throughout the system. In June 2012, the final design of the train was shown. In May 2013, the STM finished preparing the tunnels for the reception of the first test train. This work included grinding concrete on some 200. m of tunnel, where laser measurements indicated that scraping might occur due to the new trains' softer suspension.

Construction

The train has a Canadian content of 60%, with production of the bogies taking place at Alstom's Sorel-Tracy plant based on a design used on the MP 89 and MP 05 trains of the Paris Métro (but modified to accommodate wooden brake shoes used by the STM) and final car assembly at Bombardier's La Pocatière plant. The first prototype train was unveiled in November 2013, and was delivered to Montreal in April 2014.

Tests of the prototype revealed several incompatibilities with Montréal's infrastructure, including insufficient electrical power. In January 2015, Bombardier suspended production for six months because of delays with the completion of the automated train control software. In January 2015, production of new Azurs was temporarily halted due to software installation and financing issues. In April 2015, only 4 fully functional MPM-10 trains had been delivered to the STM, while 28 more cars had been assembled before production was halted. Bombardier blamed one of the subcontractors responsible for the automatic driving controls on the new trains for the delay. At the end of 2015, the issues were resolved and the trains remained on track to be completed by the 2018 deadline date.

Introduction into service

After six months of vigorous testing, the first of the new cars entered revenue service at 10 am on February 7, 2016, departing from Henri-Bourassa station towards Côte-Vertu. The new trains were initially well received by the public.

On 14 January 2017, the STM removed all trainsets from circulation after finding unusual damage to the negative collector shoe due to unusual lateral forces being applied to the shoe and shoe mount. The trains were being brought back into service, starting January 28, 2017. On 14 August 2017, the first Azur deployed on the Green Line, for testing. This test phase aimed to "analyze the behavior of the train on this line, with the load that the customers on board the train". In October 2017, two Azur trains ran in service on the Green Line.

In February 2018, the Montreal Gazette confirmed that the Bombardier–Alstom consortium would deliver two free trainsets, as the first six trains were delivered late. By May 2018, 43 sets of Azur had been delivered. This effectively replaced the entire MR-63 fleet, which were retired in June 2018.

Additional order

In May 2018, the STM announced that the Quebec government had allocated funds for an increase of the MPM-10 base order, to include an additional 17 nine-car trains (153 cars). This additional order would replace a portion of the MR-73 fleet, starting with the older and less reliable cars of that series. This would allow 90% of Green Line service to be provided by Azur trains. The contract option was agreed in November 2018, at a cost of $448 million. In December 2021, the final Azur train entered service, making a total of 71 nine-car sets delivered.

In service

In September 2019, STM announced that straps for standing passengers would be installed in Azur trains, following feedback from passengers that the grab bars were too high. In 2020, STM announced that they would start displaying the occupancy and crowding levels of Azur cars on Metrovision platform screens. This would allow passengers to find quieter/less crowded parts of the train, allowing social distancing during the COVID-19 pandemic.

Specifications

::figure[src="https://upload.wikimedia.org/wikipedia/commons/9/93/Metro_de_Montreal_97.jpg" caption="Open gangway of Azur"] ::

The MPM-10 Azur features full-width open-gangways between the cars which can be occupied by passengers, resulting in 8% more train capacity than previous trains.

The trains are equipped with an air suspension system, larger windows and wider doors. Wheelchair spaces are also provided, although the majority of Metro stations are not yet wheelchair-accessible. In the cabin, the trains also feature more natural lighting, high definition televisions, a new PA system and surveillance cameras. Improved ventilation is also featured; however, as with Montreal's previous generation rolling stock, cars are not air conditioned. Instead they are equipped with adjustable passenger force ventilation systems which deploy outside air into the train fast to create a cooler environment.

The MPM-10 uses Alstom OPTONIX IGBTVVVF traction control assembled in the United States. The MPM-10 Azur can run faster than the maximum speed of the former MR-63, and the current MR-73 trains, they can run as fast as 100 km/h due to its enhanced motors. Given the higher capacity of the MPM-10, the trains are heavier than the outgoing MR-63s at 238 t (26.4 t per car).

Lines serviced

Green Line (since 2017)

Orange Line (since 2016)

Formation

Currently (****) ::data[format=table]

Lines #ColourNumber of trainsCompositionComments
1Montreal MetroGreen}}"26 sets (234 cars)
2Montreal MetroOrange}}"45 sets (405 cars)
::

References

References

  1. "New AZUR métro cars".
  2. (27 November 2012). "Modular metro traction equipment with emergency rescue capability". Railway Gazette.
  3. "Alstom Motors Catalogue 2015 – English". [[Alstom]].
  4. (October 11, 2016). "Bombardier Transportation Seminar".
  5. "Alstom Bogies Catalogue 2015 – English". [[Alstom]].
  6. "Equipment for urban vehicles".
  7. "What is TCMS".
  8. [http://www.stm.info/sites/default/files/pdf/fr/budget2019.pdf STM Budget 2019 - page 67]
  9. [https://www.stm.info/sites/default/files/affairespubliques/Dossiers/ap_fact_sheet_mpm10_june12.pdf new MPM-10 Métro cars - page 2]
  10. (10 September 2005). "A system in need of major surgery: Our metro stations and trains urgently require an injection of $2.6 billion". [[Montreal Gazette]].
  11. (12 December 2005). "2006-2008 Capital Spending Plan Essential investments for the future of public transportation".
  12. (12 May 2006). "Bombardier granted huge Montreal metro deal".
  13. (11 May 2006). "The STM will soon initiate the process to replace the métro's MR-63 rolling stock;".
  14. LaSalle, LuAnn. (11 May 2006). "Montreal to get new trains in 2010". [[Montreal Gazette]].
  15. (2009-07-01). "Métro de Montréal: le prix divise la STM et Bombardier-Alstom".
  16. (10 January 2008). "Alstom allowed to bid on $1.2B Montreal subway car deal".
  17. Marowits, Ross. (11 December 2008). "Bombardier, Alstom to submit joint bid". [[The Globe and Mail]].
  18. (December 15, 2009). "Les Chinois veulent le contrat du métro". [[Le Devoir]].
  19. "Replacement of the Montreal Subway Cars - Spanish firm CAF confirms its interest".
  20. (1 October 2010). "Que. accused of protectionism in Metro contract".
  21. (March 1, 2010). "STM rejects Chinese firm's bid for Metro cars". [[CBC News]].
  22. (October 22, 2010). "Contract signing for the procurement of Montréal's métro cars". [[Société de transport de Montréal]].
  23. (October 22, 2010). "The Bombardier-Alstom Consortium Signs a Contract to Build 468 New Metro Cars for Montréal". [[Bombardier Transportation]].
  24. Montreal orders 468 metro cars ''[[International Railway Journal]]'' December 2010 page 12
  25. (16 May 2012). "The STM unveils the chosen name for its new métro cars".
  26. "The STM unveils the new métro car for Montréal: with Azur, the future is in sight!".
  27. (April 25, 2014). "Limage des tunnels: le DG de la STM rectifie le tir". [[Métro (Montreal newspaper).
  28. (2018-11-12). "More metro cars for Montreal".
  29. (June 2012). "Design and development of the MPM-10 Métro".
  30. Vantuono, William. (2022-01-18). "Alstom's Montreal Milestone".
  31. (25 November 2013). "Bombardier, Alstom and STM unveil Montreal's AZUR metro cars".
  32. (April 28, 2014). "AZUR makes Montreal debut: STM takes delivery of first prototype train". [[Société de transport de Montréal]].
  33. Tison, Marie. (25 October 2014). "Nouveau retard pour les voitures du métro". La Presse.
  34. (January 23, 2015). "Bombardier halts production on Montreal transit cars". [[Trains (magazine).
  35. (June 21, 2015). "Squeaky Wheels: Bombardier plant still producing new métro cars". [[Montreal Gazette]].
  36. (February 7, 2016). "New Montreal métro cars start rolling". [[Montreal Gazette]].
  37. Magder, Jason. (7 February 2016). "New métro train gets good reviews on first day".
  38. (January 16, 2017). "STM pulls all AZUR Metro trains following weekend shutdown".
  39. (August 14, 2017). "Azur accueille des passagers sur la ligne vertedate". [[Journal de Montréal]].
  40. (2017). "New AZUR métro cars". [[Société de transport de Montréal]].
  41. Magder, Jason. (6 February 2018). "Montreal's STM to receive two free Azur métro trains".
  42. (May 30, 2018). "Farewell tour for the MR-63, the Montreal métro's 52-year-old workhorse". [[Montreal Gazette]].
  43. (2017). "The STM will buy 17 more Azur trains to service the Green Line". [[The Montreal Gazette]].
  44. (2018-11-12). "More metro cars for Montreal".
  45. (17 December 2021). "Final AZUR train commissioned into STM's fleet".
  46. (13 December 2021). "STM commissions final AZUR train".
  47. (4 September 2019). "STM to install straps in new métro cars".
  48. (2019-09-04). "La STM installera des sangles dans les voitures Azur".
  49. (30 November 2020). "STM tracks rider capacity levels on Azur trains.".
  50. "STM".
  51. "STM - Metro New Cars".
  52. (June 2022). "New MPM-10 Metro Cars".
  53. "Video presentation". Stm.info.
  54. (2010-10-22). "Montréal metro car order placed at last". Railway Gazette.
  55. "Bombardier reports".

::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::

montreal-metrotrain-related-introductions-in-2016alstom-multiple-unitsbombardier-transportation-multiple-units750-v-dc-multiple-unitselectric-multiple-units-of-canada