Skip to content
Surf Wiki
Save to docs
general/mass-rapid-transit-singapore-rolling-stock

From Surf Wiki (app.surf) — the open knowledge base

Kawasaki Heavy Industries & CSR Qingdao Sifang C151A

Class of electric multiple units in Singapore

Kawasaki Heavy Industries & CSR Qingdao Sifang C151A

Class of electric multiple units in Singapore

FieldValue
name{{SMRT Rolling Stock Infobox Colour
ennameKawasaki Heavy Industries & CRRC Qingdao Sifang C151A
lineNorth South
line2East West
image(SGP-Singapore) East-West MRT Line Kawasaki Heavy Industries & CSR Qingdao Sifang C151A 513-514 @ Boon Lay 2024-12-27.jpg
captionA C151A train approaching Boon Lay station, 2024
interiorimageFile:(SGP-Singapore) North South MRT Line Kawasaki Heavy Industries & CSR Qingdao Sifang C151A 3554 Interior 2024-09-12.jpg
interiorcaptionInterior of a C151A train.
stocktypeElectric multiple unit
service– present
manufacturer{{plainlist
factoryQingdao, Shandong, China
yearconstruction{{plainlist
yearservice
refurbishmentCRRC Qingdao Sifang
2026 – mid-2030s
numberbuilt210 Vehicles (35 Sets)
numberservice210 Vehicles (35 Sets)
formation6 per trainset
DT–M1–M2+M2–M1–DT
fleetnumbers{{plainlist
capacity296 seated; 1,624 standing; 2 PIW spaces
operatorSMRT Trains (SMRT Corporation)
depots{{plainlist
lines{{plainlist
carbodyAluminium-alloy double-skinned construction
trainlength138.86 m
carlength{{plainlist
* {{convert23.83mftinabbron}} (DT)
* {{convert22.8mftinabbron}} (M)
width3.2 m
height3.7 m
doors1450 mm, 8 per car, 4 per side
maxspeed{{plainlist
* {{convert90km/hmphabbron}} (design)
* {{convert80km/hmphabbron}} (service)
weight{{plainlist
* {{convert226.8tabbron}} (unladen)
* {{convert335.9tabbron}} (laden)
tractionFuji Electric IGBT–VVVF (output 415 kVA)
traction motors16 × Fuji Electric MLR111 150 kW self-ventilated 3-phase AC induction motor
550V 204A 1765 r/min
poweroutput2.24 MW
transmissionWestinghouse-Natal (WN) Drive
acceleration1 m/s2
deceleration{{plainlist
* {{convert1.2m/s2mph/sabbron}} (service)
* {{convert1.3m/s2mph/sabbron}} (emergency)
auxFuji Electric auxiliary inverter with battery charger
80 kVA + 16 kW
electricsystem
collectionmethodCollector shoe
uicclass2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
bogiesbolsterless air-spring monolink axlebox type
brakesRegenerative, rheostatic and electro-pneumatic
safetyOriginal: Westinghouse Brake and Signal Company FS2000 ATP fixed block ATC under ATO GoA 2 (STO), with subsystems of ATP and ATS
Current: Thales SelTrac® moving block CBTC ATC under ATO GoA 3 (DTO), with subsystems of ATP, NetTrac ATS and CBI
couplingScharfenberg
gauge
  • Kawasaki
  • CRRC Qingdao Sifang
  • 2011 (Batch 1)
  • 2013 – 2014 (Batch 2) 2026 – mid-2030s DT–M1–M2+M2–M1–DT
  • 501/502 – 543/544 (Batch 1)
  • 545/546 – 569/570 (Batch 2)
  • Bishan
  • Ulu Pandan
  • Tuas
  • Changi
  • East Coast--
  • North–South Line
  • East–West Line
  • 23.83 m (DT)
  • 22.8 m (M) | art-sections =
  • 90 km/h (design)
  • 80 km/h (service)
  • 226.8 t (unladen)
  • 335.9 t (laden) 550V 204A 1765 r/min
  • 1.2 m/s2 (service)
  • 1.3 m/s2 (emergency) 80 kVA + 16 kW Current: Thales SelTrac® moving block CBTC ATC under ATO GoA 3 (DTO), with subsystems of ATP, NetTrac ATS and CBI
Builder's plate of a C151A train

The Kawasaki Heavy Industries & CSR Qingdao Sifang C151A is a class of trains that are the fourth generation electric multiple unit rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract 151A. Their introduction to the network has increased the capacity of both lines by 15%.

They are the last batch of rolling stock on the two lines to be painted in the "Blackbird" livery. Developed from the Kawasaki Heavy Industries & Nippon Sharyo C751B trainsets, further developments of the type include the C151B and C151C trains featuring design updates and changes. The C151A was the first rolling stock on the MRT network to be manufactured in China. The initial contract of 22 trainsets of 6 cars each was awarded to KHI and Sifang by the Land Transport Authority.

In 2013, a further order of 13 trainsets was placed, with all 35 trainsets in revenue service as of 2014. In 2016, an investigative news report from Hong Kong's FactWire alleged that C151A trainsets were discreetly being shipped back to Qingdao for rectification due to multiple defects, including an exploding battery and cracks on trains. The Singapore government subsequently acknowledged the trains were returned for rectification works, and have since published official statements to address FactWire's specific allegations.

History

C151A for the supply of 22 trainsets for the North South and East West lines were initiated for future expansion, which is to expand the fleet as 106 trains were insufficient for the Boon Lay extension and Jurong East Modification Project in December 2007. On 6 May 2009, the Land Transport Authority announced that KHI and Sifang had won over Hyundai Rotem, Bombardier Transportation and Mitsubishi Heavy Industries to secure the contract at a cost of S$369 million, despite Hyundai Rotem offering the lowest bid at S$323 million for the order of 22 trainsets under Batch 1. Sifang handled the manufacturing and testing of the rolling stock, while KHI oversaw the project and design. The C151A contract was the first successful joint venture between these two companies in the international market. Also, in December 2011, 13 additional trains were purchased by LTA under Variation Order bringing the total number of trains to 35.

With the delivery of C151A trainsets, trains were actually operated on the East–West Line until October 2013. C151As were temporarily suspended from the North–South Line during the MRT disruption in 2011, starting from 7 May 2012 all the way until 23 October 2013. SMRT engineers detected arcing problems on one of the C151As, but no evidence was shown that it was the root cause of the service suspension in 2015.

During the suspension of the C151A running on the North–South Line, SMRT had investigated and found impurities in aluminium bodywork caused the cracks found in structural components, including the sub-floor, which is a compartment located under passenger floor. Its role is to hold equipment box and electrical wires and bolster function parts connecting the car body to the bogie. Affected trainsets were sent back to China progressively between July 2014 and January 2020, before the COVID-19 pandemic.

Refurbishment

All 92 trains from the KSF fleet, consisting of C151As, C151Bs and C151Cs will undergo refurbishment works from 2026 onwards, and is expected to be completed by the mid-2030s.

Tender

The tender for trains under the contract turnkey 151A was closed in January 2009. The tender results were published in May 2009.

S/NName of tendererAmount ($S)
1Bombardier (Singapore) Pte Ltd and Bombardier Transportation GmbH Consortium373,327,788.00
2Kawasaki Heavy Industries,/ Kawasaki Heavy Industries (Singapore) /CSR Qingdao Sifang Locomotive and Rolling Stock368,997,888.00
3Mitsubishi Corporation393,301,698.52
4Hyundai Rotem322,729,548.00

Equipment

Main propulsion controller

The C151A trains are the third commuter type Electric Multiple Unit (EMU) to feature electric systems fully manufactured by Fuji Electric. Propulsion is controlled by VVVF Inverter with 2-level IGBT semiconductor controller, rated at 415 kV. Each inverter unit controls two motors on one bogie (1C2M), and one motor car features two of such units. Motors are three-phrase AC induction type, model MLR111, with a maximum output of 150 kW. However, the main difference is that the traction for the trains is higher pitched than the ones from C751B trains which are lower pitched.

Bogies

The C151A trains use the monolink axlebox type bolsterless air spring bogie. There are no major technical differences between a trailer and motor car bogie other than additional electrical components for the latter; similar to the Kawasaki and Nippon Sharyo C751B trains. However, the Beijing Subway Rolling Stock trains were also equipped with bolsterless air-spring bogies manufactured in China.

Auxiliary systems

A break from tradition, the C151A trains features auxiliary inverters for its electrical systems on all six cars of the train. Previously, auxiliary inverters were mounted only on motor cars. The VVVF Inverter is controlled by IGBT semiconductors and rated at 80 kV. A battery charger is built with the inverter and provides 16 kW output.

Linear Variable Differential Transformer (LVDT)

3 trains (Sets 501/502, 531/532 and 533/534) are equipped with LVDT. This is to inspect the third rail.

Interior

The interior of the C151A trains depending on each car, features the shades pink, blue and turquoise seats. Priority seats are in darker shades. The floor of the train is also grey and interior walls are white similar to that of Kawasaki Heavy Industries & Nippon Sharyo C751B trains (except floor colour).

Train formation

The coupling configuration of a C151A in revenue service is DT–M1–M2+M2–M1–DT.

Car TypeDriver CabMotorCollector ShoeCar LengthWheelchair Baymft in
DT23.83 m
M122.8 m
M222.8 m

The car numbers of the trains range from x501 to x570, where x depends on the carriage type. Individual cars are assigned a 4 digit serial number. A complete six-car trainset consists of an identical twin set of one driving trailer (DT) and two motor (M) cars permanently coupled together. For example, set 535/536 consists of carriages 3535, 1535, 2535, 2536, 1536 and 3536.

  • The first digit identifies the car number, where the first car has a 3, the second has a 1 & the third has a 2.
  • The second digit is always a 5, part of the identification numbers
  • The third digit and fourth digit are the train identification numbers. A full-length train of 6 cars have 2 different identification numbers. For example, 535/536 (normal coupling) or 535/548 (cross-coupling).
    • Kawasaki and CSR Qingdao Sifang built sets 501 – 570.

Operational problems

On 5 July 2016, a Hong Kong-based non-profit news organization FactWire had broken the news of the C151A trains suffering from multiple defects relating to Chinese-made materials and posted the entire investigative works on YouTube.

Factwire allegations

These are the list of allegations mentioned in their YouTube video since C151A entered into revenue service in 2011 (27 May 2011).

This list compiles the initial response from the authorities are compiled from the first SMRT press release on 5 July 2016, 4:30pm (GMT+8) by SMRT Trains managing director Lee Ling Wee as well as the first Land Transport Authority press release at an hour after first SMRT's press release. and also the subsequent official position on Singapore government's online FAQ portal 'Factually' which quotes sources from the Facebook page of Land Transport Authority hours after the initial press release.

No.Date of issue First appearedAlleged issues & consequencesAlleged actions taken by the authoritiesInitial response from SMRT or Land Transport AuthoritySubsequent response by Singapore Government portal 'Factually'Additional Notes (Including any subsequent press release from the authorities)
12011A C151A battery used for uninterruptible power supply exploded during a repair work but caused no injuries or deaths.All Chinese made batteries were replaced into German made instead.No commentsIssue was caused by gases building up in the battery housing cover, causing the cover to fly open. The design for battery housing was since improved to rectify this issue immediately on all affected trains.The authorities eventually admitted some flaws in the battery housing design, but did not confirm whether the suppliers for the batteries were changed as well as if the batteries installed on other C151A trains were replaced or not.
215 & 17 December 2011SMRT suspects that C151A trains are responsible for the twin MRT breakdowns on North–South Line during the evening peak hours.Worst disruptions in entire Singapore MRT history.
Furthermore, according to a CRRC Sifang anonymous subcontractor, he claimed to FactWire that SMRT had reduced the deployment of C151A trains and requested payment delay for the extra C151A trains after the breakdowns. As a result, the cash-flow of the subcontractor is heavily impacted.No commentsNot mentioned
32013Impurities in aluminium bodywork caused the cracks found in structural components, including:FactWire alleged the shipment of defective trains is part of a cover-up by both Singapore (SMRT, Land Transport Authority) and the train manufacturers (Kawasaki & CRRC Qingdao Sifang) as the defective trains are wrapped in a green cover and transported during late night.

Reactions

This incident was a source of public concern among Hong Kongers because subway operator MTR had ordered fleets of a new train from the same manufacturer CRRC Sifang. The news was quickly reported in other Hong Kong media. The incident also created a public uproar in Singapore, generating a public reaction. Some of these discussions included criticism of the Land Transport Authority (LTA) and SMRT for the cover-up about the defective trains, while others questioned the quality of the Chinese-made trains. The LTA released more technical details on 6 July 2016 claiming that 5 of the 26 defective trains had been rectified, including photos illustrating the 'hair-line crack'. The authority also named an independent third-party assessor, TUV Rheinland who shared the same opinion that the defects are "not safety-critical".

During the same period, a rumour posted on 4 February 2015 alleging misconduct of CRRC Sifang faking technical data involving almost 70 people from multiple departments since November 2010 for failing to meet the standards set by Kawasaki gained traction amongst the public. The consortium refuted the rumor on 7 July 2016 and threatened to take legal actions. The LTA also publicly dismissed the allegations in a press statement. The link to the original rumor was deleted soon after the response from the authorities. in order to refute a subsequent FactWire report claim. LTA also stated that it "considered that the contractor was able to quickly identify the cause of the defects, take responsibility and carry out the necessary action promptly to rectify the fault" and gave the consortium the "highest quality score" as the basis for awarded them subsequent train contracts (C151C and T251) in 2015 despite the defects were discovered since. The contract for C151B trains had been awarded to the same consortium in 2012, prior to the knowledge about the faults being known.

On 9 July 2016, a Singapore-based alternative media republished a CaiXin Online article originally published in March 2016 by the China Railway Construction Corporation blaming the China Railway Corporation for the decline of quality standards. According to the former, 60% of all railway incidents in China and 90% of all railway disruptions during 2015 can be attributed to CRRC manufactured trains not meeting quality or maintenance standards, with 210 instances resulting in death or injuries.

Political furor in Singapore

The incident became a political issue as opposition politician Gerald Giam from the Workers' Party questioned the transport authority for awarding the consortium a "top quality score", among other statements in his Facebook page. The party later issued a second statement that their MPs would file 17 questions in Parliament about the issue.

Official statement from Transport Minister

On 12 July 2016, Transport Minister Khaw Boon Wan released an extensive statement about this issue. These are the key points that Khaw have made:

  • The reason that this incident was not reported earlier in 2013 is because going public for something that was "not a major event" might have caused unnecessary panic to the layman since any engineers would have known that not all cracks are the same. However, he admitted that sometimes routine matters can be spun out of control, just like in this incident.
  • Land Transport Authority would have consulted with Ministry of Transport and go public if this incident happens to be a safety issue OR affected train capacity even if the incident does not affect safety because they need to explain the slowing down on the goal of increasing mass rail transit capacity. In this case given that only one train is sent for rectification at a time, the train availability is not affected at all since the East–West Line and North–South Line has a total fleet of 140 trains (As of 2016) while only 124 trains are needed to meet the operational demand.
  • He said that the entire train would be removed from service even if just one out of the 6 train cars formed cracks.
  • Explained that the reason for Kawasaki-Qingdao Sifang to win subsequent tenders like T251 trains for the upcoming (As of 2016) Thomson–East Coast Line is because the consortium showed a high level of responsiveness and strong sense of responsibility in addressing the issue and the authorities are satisfied that the issue was resolved conclusively.
  • Explained that a total of 4 tenders including Kawasaki-Qingdao Sifang out of the 6 planned to assemble their trains in China with Hyundai Rotem and Construcciones y Auxiliar de Ferrocarriles the exceptions who will assemble their trains in South Korea and Spain respectively should they have won the T251 tender.

Reaction from the Analysts and FactWire after Minister statement

  • Senior Transport Correspondent for Straits Times, Christopher Tan published an article on 14 July 2016 in a response to the entire saga. He started with both LTA and the train manufacturer are addressing the flaws head-on deserves credit but took an issue with how the authorities communicated with the public over the debacle did little to restore confidence. Specifically the points mentioned were:
    • The oldest rolling stock C151 does not have cracks despite nearly 30 years of service and the first batch of trains used in the Singapore's most problematic railway, Bukit Panjang LRT line showed cracks only after 16 years of service. Therefore, he said that the crack issue surfaced on the C151As are not routine as what minister have said earlier.
    • Transport Ministry risks giving the public an impression of taking the issue lightly by comparing the hairline cracks occurred on the trains to those that frequently appear on a newly plastered wall.
    • Took issue with the train manufacturer for not showing public remorse because no apology was made while threatening to take legal actions against people who spread the rumors critical of them.
    • Engineers knows that impurities in aluminium-alloy is a grave concern in any industry as its durability is certain to be compromised over time. The authorities had earlier admitted that the cause of hair-line cracks in train car body is due to impurities.
    • Questioned the authorities were quick to declare that no reviews are necessary despite CRRC Sifang was rejected by Massachusetts transport officials due to the technical, manufacturing and quality assurance components of its bid were "unacceptable" in 2014 among other issues surfaced by rival Chinese railway manufacture in the overseas projects as well as the authorities had appeared to downplay the episode.
  • On 14 July 2016, FactWire made a Facebook post which regretted the false statements that Singapore minister had made 2 days ago. Specifically, FactWire regrets the minister has suggested that FactWire could be part of politically motivated anti-China factions in Hong Kong and as a result Singapore become a convenient bullet and collateral damage during the press release on 12 July 2016. FactWire also reiterates that it is an entirely crowded funded news agency being independent of any commercial or political interests.

Incidents

On 15 November 2017 at approximately 8.18am, 2 C151A trains set 535/536 & 547/548 collided at Joo Koon MRT station. 29 passengers were conveyed to various hospitals following the incident and a further 7 walked in themselves. This is the second of such incidents after 5 August 1993, with the first being when 2 C151 trains collided at Clementi.

References

References

  1. Woodland, Daniel. (August 2004). "Optimisation of Automatic Train Protection Systemstion Systems".
  2. "Thales Urban Rail Signalling Singapore – North–South / East–West Lines".
  3. Fang, Joy. (2 February 2012). "Coming: $600m upgrade for MRT system/New train measures a 'catch-up'". [[My Paper]].
  4. (7 May 2009). "Extra metro trains for Singapore". [[Railway Gazette International]].
  5. (16 May 2011). "Five new trains added to boost capacity of North–South and East–West Lines". [[SMRT Corporation]].
  6. "Train capacity to rise by up to 50% in 4 years".
  7. (29 August 2012). "Both orders for Singapore Subway Train 132 LTA".
  8. (13 May 2009). "CSR Sifang and Kawasaki Heavy Industries Won the Bid in the Subway Vehicle Project of Singapore".
  9. (4 July 2012). "Report of the Committee of Inquiry Into the Disruption of MRT Train Services on 15 and 17 December 2011". Ministry Of Transport.
  10. "SMRT to upgrade 92 trains with improved air-conditioning, more sensors to preempt disruptions in real-time".
  11. (2 September 2009). "Tender Information".
  12. "Kawasaki Heavy Industries-CSR Qingdao Sifang (KSF) C151A". SGTrains.
  13. (2016). "China manufacturer for MTR secretly recalls 35 SMRT subway trains after cracks found".
  14. (2016). "China manufacturer secretly recalls Singapore MRT subway trains after cracks found".
  15. (5 July 2016). "26 China-made MRT trains sent back to fix defects". The Straits Times.
  16. "Defects on SMRT trains 'not safety-critical', to be repaired by manufacturer: LTA".
  17. "Why are MRT trains being shipped back to the manufacturer?".
  18. "Thales awarded signalling contracts for Singapore North–South, East–West lines and Tuas West Extension".
  19. "Archived copy".
  20. (5 July 2016). "Mainland manufacturer for MTR secretly recalls 35 trains from Singapore due to crack". HKPF.
  21. (5 July 2016). "LTA: Defects of trains not safety-critical, SMRT: Defects will be repaired by 2023 - The Online Citizen".
  22. "LTA {{!}} Trains on the North–South and East–West Lines Safe for Service".
  23. [http://www.channelnewsasia.com/news/singapore/car-body-replacement-for/2935514.html Defective SMRT trains were still fit and safe for service: LTA] {{Webarchive. link. (6 July 2016 - Channel NewsAsia, 6 July 2016)
  24. (4 February 2015). "关于举报中国南车青岛四方机车车辆股份有限公司在四方川崎联合体新加坡地铁C151A项目首列车试制中CR试验表格中数据造假事实".
  25. [http://theindependent.sg/whistle-blower-alleges-csr-sifang-submitted-fake-test-data-to-lta/ Whistle-blower alleges CSR Sifang submitted fake test data to LTA] {{Webarchive. link. (7 July 2016 - The Independent, 6 July 2016)
  26. [http://www.todayonline.com/singapore/consortium-train-controversy-breaks-silence Consortium in train controversy breaks silence] {{Webarchive. link. (11 July 2016 - Today, 11:41 PM, 7 July 2016 (GMT +8))
  27. [http://www.straitstimes.com/singapore/transport/consortium-that-built-mrt-trains-had-top-score-for-quality Consortium that built MRT trains 'had top score for quality'] {{Webarchive. link. (12 July 2016 - The Straits Times, 8 July 2016)
  28. link. (9 July 2016 - Channel NewsAsia, 7 July 2016)
  29. (5 July 2016). "HK Government Tipped Off About Singapore Subway Trains Crackings A Year Ago, Emails Reveal".
  30. [http://theindependent.sg/even-chinas-own-railway-operator-condemns-csr-sifang/ Even China’s own railway operator condemns CSR Sifang] {{Webarchive. link. (10 July 2016 - The Independent SG, 9 July 2016)
  31. [http://companies.caixin.com/2016-03-22/100922969.html 独家. 车辆事故数上升 铁总质疑车辆质量 (Exclusive. Rise of Train Car Incident CRCC doubts the quality of train cars)] {{Webarchive. link. (1 July 2016 - CaiXin Online, 22 March 2016 08:46 am (GMT+8))
  32. link. (3 July 2016 - CaiXin Online, 22 March 2016 19:31 (GMT+8))
  33. link. (8 February 2023 - Gerald Giam Facebook page, 8 July 2016 9:35 am (GMT+8))
  34. [https://www.facebook.com/workersparty/posts/1371907486159164 Parliamentary questions filed from WP about C151A issue] {{Webarchive. link. (8 February 2023 - The Workers' Party of Singapore, 8 July 2016 18:17 (GMT+8))
  35. [http://www.channelnewsasia.com/news/singapore/going-public-on-train/2950576.html Going public on train cracks could have caused undue panic: Khaw] {{Webarchive. link. (13 July 2016 - Channel NewsAsia, 12 July 2016 16:49 (GMT+8))
  36. link. (20 August 2016 - Land Transport Authority, 28 May 2014)
  37. [http://www.straitstimes.com/opinion/nothing-routine-about-mrt-cracks Nothing routine about MRT cracks] {{Webarchive. link. (15 July 2016 - Straits Times, 14 July 2016)
  38. [https://www.facebook.com/notes/factwire-news-agency-english/an-open-letter-to-singapores-transport-minister-khaw-boon-wan/881421245302978 An Open Letter to Singapore’s Transport Minister Khaw Boon Wan] {{Webarchive. link. (8 November 2020 - FactWire, 14 July 2016)
  39. [http://www.todayonline.com/singapore/cracks-train-routine-matter-can-be-misspun-controversy-says-khaw Train cracks: Routine matter spun into controversy, says Khaw] {{Webarchive. link. (15 July 2016 - Today, 12 July 2016 6:15PM (GMT+8))
  40. "MRT train collides with stationary train at Joo Koon station: Reports". Channel NewsAsia.
  41. (15 November 2017). "Joo Koon train collision: 28 hurt after stalled train is hit by another one". The Straits Times.
  42. "Second train delay hits EWL commuters on Wednesday morning".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Kawasaki Heavy Industries & CSR Qingdao Sifang C151A — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report