Zagreb bypass

Road in Croatia


title: "Zagreb bypass" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["roads-in-zagreb", "ring-roads", "motorways-in-croatia", "bypasses", "yugoslav-croatian-architecture"] description: "Road in Croatia" topic_path: "arts" source: "https://en.wikipedia.org/wiki/Zagreb_bypass" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

::summary Road in Croatia ::

::data[format=table title="Infobox road"]

FieldValue
countryHRV
nameZagreb bypass
beltway_cityZagreb
mapCroatia Autocesta Zagreb Bypass.svg
map_notes[[File:Chs2 Greend40.png
e-road[[Image:E59-HR.svg
length_km48.9
length_round0
terminus_ain Zaprešić interchange
junctionin Jankomir interchange
in Lučko interchange
in Ivanja Reka interchange
terminus_band
in Sveta Helena interchange
countiesCity of Zagreb, Zagreb County
citiesZagreb, Velika Gorica, Samobor, Zaprešić
::

| country = HRV | name = Zagreb bypass | beltway_city = Zagreb | map = Croatia Autocesta Zagreb Bypass.svg | map_notes = [[File:Chs2 Greend40.png|10px|alt=Map key – green]] in use [[File:Color icon Cornflower blue.svg|10px|alt=Map key – blue]] other motorways | e-road = [[Image:E59-HR.svg|x20px|alt=European route E59 shield|link=European route E59]] [[Image:E65-HR.svg|x20px|alt=European route E65 shield|link=European route E65]] [[Image:E70-HR.svg|x20px|alt=European route E70 shield|link=European route E70]] [[Image:E71-HR.svg|x20px|alt=European route E71 shield|link=European route E71]] | length_km = 48.9 | length_round = 0 | terminus_a = in Zaprešić interchange | junction = in Jankomir interchange in Lučko interchange in Ivanja Reka interchange | terminus_b = and in Sveta Helena interchange | counties = City of Zagreb, Zagreb County | cities = Zagreb, Velika Gorica, Samobor, Zaprešić ::figure[src="https://upload.wikimedia.org/wikipedia/commons/2/2d/Čvor_Lučko_iz_zraka.jpg" caption="[[Lučko interchange]] (viewed from the west), Zagreb's gateway to the Adriatic coast"] ::

Zagreb bypass () is a U-shaped motorway partially encircling Zagreb, Croatia. The largest part by far, between Jankomir and Ivanja Reka interchanges, was built between 1977 and 1979, while the Ivanja Reka – Sveta Helena section was built between 1996 and 1999.{{cite web | url = http://www.hidroelektra-niskogradnja.hr/on03.php | title = 3. Niskogradnja: Autoceste | date = 2008-07-30 | publisher = Hidroelektra Niskogradnja

Zagreb bypass is not designated as a separate motorway with a distinct motorway number, rather it consists of sections of three motorways:

::data[format=table]

MotorwaySections
ZaprešićZagreb zapad (Jankomir)
Zagreb zapad (Jankomir) - Lučko - Buzin - Kosnica - Zagreb istok (Ivanja Reka)
Zagreb istok (Ivanja Reka) - Sesvete - Popovec - Sveta Helena
::

Those motorway sections are concurrent with sections of the D1 and D3 state roads as well as European routes E59, E65, E70 and E71.

The bypass currently comprises four traffic lanes along its entire length, with an emergency lane in each direction. In its current form, the Zagreb bypass has a small number of interchanges spaced widely apart. For example, the current Zaprešić interchange extends a trip from Zaprešić to Zagreb via the bypass by 4.5 km. The last new interchange was built in 2007–2008 at Kosnica in the southeast, to connect the Homeland Bridge and Zagreb via Radnička cesta (Ž1029).

There are two rest areas along the bypass: Lučko rest area is located between Jankomir and Lučko interchanges comprising famous Plitvice Motel, well known for its pedestrian bridge across the bypass, while Sesvete rest area is located between Popovec and Sveta Helena interchanges. A new rest area is planned between Jakuševec and Kosnica interchanges.

Future expansion

::figure[src="https://upload.wikimedia.org/wikipedia/commons/b/be/Zaobilaznica_Zagreba.svg" caption="A new outer bypass motorway is planned"] ::

A proposal has been made in 2007 for a new interchange near Zaprešić, one that would reduce traveling time between the cities.

As a part of the A11 motorway construction works, a new Jakuševec interchange was built east of the Buzin interchange. The Buzin interchange in turn is planned to be abolished, in favour of another new interchange, Sveta Klara, further to the west.

A long-term plan exists to build a new outer bypass road around Zagreb. The outer bypass would be a part of the tolled motorway network thus permitting vehicles not to stop at two toll plazas near Zagreb as they enter and leave the present bypass, decreasing congestion on the inner bypass motorway. 2009–2012 motorway and road construction plan entails funds for development of design documents for the outer bypass motorway and specifies its route: It is to be a 106 km long motorway originating from the A2 motorway Luka interchange, connecting the A3 motorway Gradina interchange near Samobor, the A1 motorway Horvati interchange, the A11 motorway Mraclin interchange, once again the A3 motorway Ivanić Grad interchange and finally the A4 motorway Zelina interchange. A total of 14 interchanges are planned on the new bypass, including the ones connecting it to the other motorways already specified, connecting the outer bypass to all major roads intersected.

Because of the Medvednica Mountain north of Zagreb, the present bypass is U-shaped, leaving the city without a northern bypass that would connect the A2 and A4 highways. A northern branch (around 27 km long) of the bypass was planned and designed to bridge the gap. It was planned to connect the Zaprešić interchange with the Popovec interchange. The route would have required a number of long tunnels and viaducts making it expensive.{{cite web| url = http://www.vjesnik.hr/html/2008/02/28/Clanak.asp?r=zag&c=7 | title = Izgradnja sjeverne tangente mogla bi početi već 2009. | work = Vjesnik | last = Kekić | first = Jasmina | date = 2008-02-28 | access-date = 2009-07-03}} According to the general design alternative in a study executed by the Faculty of Architecture and Institut IGH, the route would comprise 15 tunnels. The tunnels longer than 500 m would be: Ivanec Tunnel (2656 m), Borčec Tunnel (1797 m), Pantovčak Tunnel (1625 m), Dotrščina Tunnel (1050 m), Remete 1 Tunnel (1025 m), Čuguvec Tunnel (550 m) and Novaki Tunnel (502 m). The construction works were planned in stages with an additional 5–10 km long tunnel built subsequently through Medvednica Mountain to connect Zagreb and Hrvatsko zagorje directly. However, as of September 2011, all such plans were cancelled as unfeasible.

Croatian Motorways has started the realization of the project of building the third lane on the Zagreb bypass. Thus, HAC and the consortium led by the IGH Institute signed a contract for the development of a preliminary design, environmental impact assessment and obtaining a location permit for the reconstruction of the Zagreb bypass from Jankomir to Ivanja Reka by upgrading the third lane and for the main and detailed design and obtaining a building permit, for the busiest section, Jankomir - Lučko. The estimated value of the investment for the expansion of the entire bypass is around HRK 800 million, and the exact amount will be known after the development of the preliminary design. Construction could begin in 2023.

Exit list

References

  1. (May 8, 2007). "Kosnica Interchange". [[Hrvatske autoceste]].
  2. (July 3, 2006). "A3 Motorway: Bregana - Zagreb - Lipovac". [[Hrvatske autoceste]].
  3. (December 3, 2009). "2009-2012 Public Roads Construction and Maintenance Program". HUKA.
  4. (September 29, 2008). "New 600 million Euro bypass". [[Jutarnji list]].
  5. (October 9, 2008). "New 600 million Euro bypass (virtual copy of the Jutarnji List article, but with a map)". Novi Zagreb info.
  6. [http://www.zagreb.hr/default.aspx?ID=961 Official study concerning Northern branch]
  7. Bohutinski, Josip. (16 September 2021). "Gradit će se treći trak na zagrebačkoj obilaznici vrijedan 800 milijuna kuna".
  8. (April 24, 2003). "Regulation on motorway markings, chainage, interchange/exit/rest area numbers and names". [[Narodne novine]].
  9. (February 17, 2010). "Decision on categorization of public roads as state roads, county roads and local roads". [[Narodne novine]].
  10. (May 8, 2007). "Čvor Kosnica". [[Ministry of Sea, Transport and Infrastructure (Croatia).
  11. (September 29, 2021). "Kod sanacije mosta postoji veliki problem: 'Ovo će potrajati, ali nismo htjeli da se ponovi Genova'". [[Jutarnji list]].

::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::

roads-in-zagrebring-roadsmotorways-in-croatiabypassesyugoslav-croatian-architecture