From Surf Wiki (app.surf) — the open knowledge base
Valley Line (Edmonton)
The Valley Line is a low-floor urban light rail line in Edmonton, Alberta, Canada. The 13.1-kilometre (8.1 mi) line runs southeast from downtown at 102 Street stop to Mill Woods Town Centre at Mill Woods stop and connects to the Capital and Metro lines at Churchill station, downtown. The line is being constructed in phases, with phase 1 being the current open 12-station portion between 102 Street and Mill Woods that commenced operations on November 4, 2023. The second phase, consisting of the 14-kilometre (8.7 mi), 16-station portion between 102 Street and Lewis Farms, began construction in 2021 and is expected to be completed in 2028. Upon completion, the entire Valley Line is expected to serve more than 100,000 commuters daily, nearly matching the current Capital Line and Metro Line in terms of capacity and ridership.
Rendering article…
This content may have been generated or modified by AI, and may be sourced from third parties. CloudSurf Software LLC makes no warranties as to its accuracy, completeness, or reliability, and accepts no liability for it. Always verify important information against primary sources.
Report