Tranz Metro

Defunct New Zealand railway operator


title: "Tranz Metro" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["railway-companies-of-new-zealand"] description: "Defunct New Zealand railway operator" topic_path: "geography/new-zealand" source: "https://en.wikipedia.org/wiki/Tranz_Metro" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

::summary Defunct New Zealand railway operator ::

::data[format=table title="Infobox Public transit"]

FieldValue
nameTranz Metro
imageTranzMetroLogo.png
altThe Tranz Metro logo.
localeWellington Region, New Zealand
transit_typeSuburban rail
lines5
stations49
annual_ridership11.6 million (2013-14)
headquartersWellington railway station, Wellington
began_operation4 July 1938 (electric trains introduced in Wellington)
1984 (Cityrail created)
18 October 1995 (Renamed Tranz Metro)
ended_operation2 July 2016 (replaced by Transdev Wellington)
ownerKiwiRail
vehicles166
system_length154 km
track_gauge
eloverhead catenary (95 km)
::

| box_width = | name = Tranz Metro | image = TranzMetroLogo.png | imagesize = | alt = The Tranz Metro logo. | locale = Wellington Region, New Zealand | transit_type = Suburban rail | lines = 5 | stations = 49 | annual_ridership = 11.6 million (2013-14) | headquarters = Wellington railway station, Wellington | began_operation = 4 July 1938 (electric trains introduced in Wellington) 1984 (Cityrail created) 18 October 1995 (Renamed Tranz Metro) | ended_operation = 2 July 2016 (replaced by Transdev Wellington) | owner = KiwiRail | vehicles = 166 | system_length = 154 km | track_gauge = | el = overhead catenary (95 km) | caption = | area served = | line_number = | start = | end = | chief_executive = | website = | operator = | character = | map = | map_state =

Tranz Metro (formerly Cityrail and before that Cityline) was a New Zealand public transport operator. Beginning as the New Zealand Railways Corporation's Cityline division as a result of restructuring in the 1980s, in its final form Tranz Metro was the operator of Metlink's suburban trains owned by the Greater Wellington Regional Council in the Wellington Region of New Zealand.

Since 3 July 2016, Wellington's commuter rail services have been operated by Transdev Wellington.

History

Suburban passenger rail services in Auckland and Wellington were a part of the New Zealand Railways Department, while bus services were owned either by city corporations or Railways Road Services. With the restructuring of the department into the New Zealand Railways Corporation in 1982, the Auckland suburban rail operation was branded "Cityrail Auckland" from 1984 and later in the mid 1980s, suburban bus and rail services were branded Cityline as part of the Corporation's Rail Passenger Group. Further restructuring of the rail network came in 1991, and the suburban rail operations were renamed "Cityrail" after they were transferred to New Zealand Rail Limited in 1991. That year the Auckland Regional Council bought the Auckland Cityrail fleet and contracted New Zealand Rail to run it, extending the contract until 1993 and again for 10 years until 2003.

In 1993, New Zealand Rail Limited was privatised, renamed Tranz Rail in 1995, with Cityrail rebranded Tranz Metro. On 15 December 2000, as part of management changes at Tranz Rail, the company split Tranz Metro into wholly owned subsidiaries Tranz Metro Auckland Ltd and Tranz Metro Wellington Ltd, with the intention of selling them. Stagecoach New Zealand and Greater Wellington Regional Council (GWRC) announced their intention to bid for the Wellington company, but both were barred by the Commerce Commission from doing so. Tranz Rail did not bid for the Auckland contract when it expired in 2003. Connex (later Veolia and now Transdev) won the contract, and took over from 23 August 2004. Tranz Metro Wellington reverted to a business unit of Tranz Rail, with new contracts being signed with GWRC in 2006 for network access, rolling stock maintenance and service delivery. The contracts expired in 2016.

In 2004, Toll Holdings bought a majority shareholding in Tranz Rail and renamed the company Toll NZ, and on 1 July 2008, it was bought (less the Tranz Link trucking and distribution arm) by the government and renamed KiwiRail. In October 2009, Cabinet agreed on a Metropolitan Rail Operating Model, which requires the operating contracts for metropolitan rail operations to be "contestable". This is in line with Auckland's rail contract.

An agreement signed in July 2011 transferred ownership of KiwiRail's station buildings, excluding Wellington railway station, to the GWRC, along with the D/DM class and EM/ET units (the FP/FT units were already owned by GWRC). KiwiRail retained ownership of the tracks, platforms, electric traction and signalling systems. The assets were valued at $107.5 million. Ownership of the fleet transferred on 1 July 2011 to Greater Wellington Rail Ltd, formed by Greater Wellington Regional Council in 2006.

In 2014, Transdev announced its intention to bid for the operations contract when it came up for renewal in 2016.

Operations

::figure[src="https://upload.wikimedia.org/wikipedia/commons/c/cd/Tranz_Metro_network_map.svg" caption="Schematic map of the Metlink rail network, operated by Tranz Metro"] ::

Metlink trains are operated under contract from the GWRC, which subsidises the operation and owns station buildings and rolling stock. Typically, 60% of that subsidy comes from central government through the NZ Transport Agency (formerly Land Transport New Zealand), which approves such funding after analysis of the economics and net benefits, the remainder coming from the GWRC. Public consultation in 2005–2006 resulted in some changes of emphasis in the new contract, which runs for ten years from June 2006. The September 2006 fare rises and section changes were stated to part-pay for a major upgrade of trains and facilities over the next few years in conjunction with regional bus service improvements.

Rolling stock

Rolling stock as at 2 July 2016: ::data[format=table]

ImageClassTypeNumberSeatsRoutes operatedIntroduction
[[File:NZR FP class 01.JPG100px]]FP class
Matangielectric multiple unit83× 2-car sets149Kapiti Line
Melling Line
Hutt Valley Line
Johnsonville Line2011–16
[[File:Metlink SW 3394 at Masterton Station.JPG100px]]SW classpassenger carriage12× SW
3× SWG
3× SWS64 (SW)
37 (SWG/SWS)Wairarapa Connection2007
[[File:DCP4818 and SW set at Carterton station with Waiararapa Connection.jpg100px]]SE classpassenger carriage4× SE
1× SEG
1× SES64 (SE)
37 (SEG/SES)Wairarapa Line
Kapiti Line (former)
Hutt Valley Line (former)2008 (HVL and KPL, withdrawn 2011)
2013 (WRL)
AG classluggage van1-Wairarapa Connection2007
[[File:TranzAlpine departing Springfield.jpg100px]]DFB classdiesel-electric locomotive5-Wairarapa Connection
::

Former rolling stock

::data[format=table]

ImageClassTypeNumberSeatsRoutes operatedIntroductionWithdrawal
[[File:EM 1367 leading a southbound 4 car set as the morning sun breaks through the clouds, near Epuni - 17 May 2003.jpg100px]]EM/ET class
Ganz Mavagelectric multiple unit44× 2-car sets148Kapiti Line
Melling Line
Hutt Valley Line1981–822011–16
[[File:NZR DM class EMU 06.JPG100px]]DM/D class
English Electricelectric multiple unit49132Hutt Valley Line
Johnsonville Line1938–19541983–2012
[[File:NZR-EA-Wellington.jpg100px]]EO classelectric locomotive3-Kapiti Line
Hutt Valley Line2008title=Railfanjournal=New Zealand Railfanpublisher=Triple M Publicationsvolume=18number=1issn=1173-2229
[[File:Electric Locomotives Near Paekakariki.jpg100px]]EW classelectric locomotive7-Kapiti Line
Melling Line
Hutt Valley Line
Johnsonville Line19521988
[[File:TGR 56er.JPG100px]]NZR 56-foot carriagepassenger carriageup to 56Kapiti Line
Melling Line
Hutt Valley Line
Johnsonville Line
Wairarapa Connection1937–19451988 (except Wairarapa and Capital Connection)
1998 (Capital Connection)
2007 (Wairarapa Connection)
[[File:DCP4818 Wairarapa.jpg100px]]DC classdiesel-electric locomotive4-Wairarapa Connection1978–80
::

Upgrades

In 2008-2011, KiwiRail and GWRC undertook a major upgrade of the Metlink network, dubbed the Wellington Regional Rail Programme (WRPP). The $390 million programme included:

  • The purchase of 48 two-car electric multiple units, the "Matangi" FP/FT class, to replace the aging DM/D class units and to increase capacity.
  • Upgrading the electrification system, including refurbishing the overhead lines and masts and 12 new substations to increase electrical supply for the Matangi units.
  • Upgrading the signalling system, including replacing control systems and signal wiring and hardening the track circuits from interference with the electrification.
  • Upgrading platforms at several stations to accommodate Matangi units and longer train lengths.
  • Upgrading the Johnsonville Line to accommodate both Ganz Mavag and Matangi units, by improving the loading gauge in the tunnels and under some bridges.
  • Lengthening the three crossing loops on the Johnsonville Line to take longer trains.
  • Double-tracking the Kapiti Line from Mackays Crossing through Paraparaumu to just south of Waikanae, to increase capacity. (The double track stops short of Waikanae Station to avoid the cost of building second bridges over State Highway 1 and the Waikanae River.)
  • Electrifying the Kapiti Line from Paraparaumu to Waikanae.
  • Adding additional stabling storage at Paekakariki and Waikanae for the Matangi and Ganz Mavag units.
  • Installing a third, bi-directional, line into between Wellington Station and the Kapiti/Hutt Valley line junction to ease congestion at peak times.

Work started on the programme in 2008, and was largely completed in February 2011.

Funding

In 2011/2012, Tranz Metro had annual operational expenses of $80.437m, and revenues of $80.442m. Most revenue (47% or $37.8m) comes from fares, 22% or $17.69m comes from Wellington Regional Council rates, and 30% or $24.13m from NZ Transport Agency public transport funding.

References

References

  1. (30 June 2014). "Wellington Metropolitan Rail 2013/14 Annual Report". Greater Wellington Regional Council.
  2. (20 December 2012). "Electric trains come to Wellington". New Zealand History online.
  3. (17 December 2015). "Wellingtons trains to be run by French company Transdev after KiwiRail loses contract". The Dominion Post.
  4. (4 November 2003). "Auckland Region Passenger Rail Service Report". [[Controller and Auditor-General of New Zealand]].
  5. (15 December 2000). "Companies Office - Tranz Metro Auckland Limited". Companies Office.
  6. (15 December 2000). "Companies Office - Tranz Metro Wellington Limited". Companies Office.
  7. Matthew Dearney. (23 August 2004). "New hand on lever of Auckland's trains". [[New Zealand Herald]].
  8. (20 June 2014). "Transdev Auckland eyes Kiwirail's Wellington contract". TVNZ.
  9. (October 2009). "Metropolitan Rail Operating Model". [[Ministry of Transport (New Zealand).
  10. (5 July 2011). "$168m Wellington Rail Package Signed". [[The Dominion Post (Wellington).
  11. (29 August 2011). "KiwiRail on track with 29% increase in operating surplus". KiwiRail.
  12. (10 March 2011). "Capital gets $88 million rail upgrade". [[The Dominion Post (Wellington).
  13. link. (26 January 2016 , ''Transdev Australasia'', Retrieved 5 January 2016)
  14. (29 June 2006). "Rail contract approved by Greater Wellington". Greater Wellington Regional Council.
  15. (December 2011). "Railfan". Triple M Publications.
  16. http://www.gw.govt.nz/story31646.cfm? {{Dead link. (February 2022)
  17. [http://www.ontrack.govt.nz/ourprojects/WRRP_Home/Pages/default.aspx Wellington Region Rail Programme (WRRP)] {{Webarchive. link. (30 April 2009 , Ontrack.)
  18. "Wellington Regional Rail Annual Report 2011/2012".

::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::

railway-companies-of-new-zealand