Strawberry Valley Project

The Strawberry Valley Project was an early project planned and constructed by the Reclamation Service in the Uinta Basin of Utah. Reclamation approved the project in 1905, and in 1908 the project became the first for the Service to generate hydropower. The project is also notable for its interbasin transfer of water, from the Uinta Basin in the Colorado River major watershed to the Bonneville Basin in the Great Basin major watershed, accomplished through the four-mile long Strawberry Tunnel.