Porter station

Transit station in Cambridge, Massachusetts, US
title: "Porter station" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["red-line-(mbta)-stations", "railway-stations-in-the-united-states-opened-in-1984", "former-boston-and-maine-railroad-stations", "mbta-commuter-rail-stations-in-middlesex-county,-massachusetts", "arts-on-the-line", "railway-stations-in-cambridge,-massachusetts", "railway-stations-located-underground-in-massachusetts"] description: "Transit station in Cambridge, Massachusetts, US" topic_path: "geography/united-states" source: "https://en.wikipedia.org/wiki/Porter_station" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0
::summary Transit station in Cambridge, Massachusetts, US ::
::data[format=table title="Infobox station"]
| Field | Value |
|---|---|
| style | MBTA |
| name | Porter |
| image | Porter Southbound MBTA Red Line Platform, June 2024.jpg |
| image_caption | A southbound Red Line train entering Porter station in 2024 |
| address | Massachusetts Avenue at Somerville Avenue |
| borough | Cambridge, Massachusetts |
| coordinates | |
| line | Fitchburg Route |
| Red Line Northwest Extension | |
| other | : |
| platform | 1 island platform (Fitchburg Line) |
| 2 split side platforms (Red Line) | |
| tracks | 2 (Fitchburg Line) |
| 2 (Red Line) | |
| bicycle | 34 spaces |
| mpassengers | |
| {{rail pass box | passengers |
| opened | 1845 (Fitchburg Railroad) |
| December 8, 1984 (Red Line) | |
| rebuilt | 1897, 1937 |
| accessible | yes |
| zone | 1A (commuter rail) |
| former | Porter's Station, North Cambridge, Cambridge |
| services | {{Adjacent stations |
| line1 | Fitchburg |
| line2 | Red |
| other_services_header | Former services |
| other_services_collapsible | yes |
| other_services | {{Adjacent stations |
| line1 | Lexington |
| line2 | Central Mass |
| system3 | Boston and Maine Railroad |
| mapframe | yes |
| mapframe-marker-color | #000 |
| mapframe-marker | rail |
| mapframe-zoom | 12 |
| map_state | collapsed |
| route_map | {{Routemap |
| legend | track |
| inline | y |
| SHI1lq-!~-STRq\RP4!~lhvSTR\utvSTR-! | Boston |
| :: |
| style=MBTA | style2=Red and Purple
| name=Porter
| image=Porter Southbound MBTA Red Line Platform, June 2024.jpg
| image_caption=A southbound Red Line train entering Porter station in 2024
| address=Massachusetts Avenue at Somerville Avenue
| borough=Cambridge, Massachusetts
| coordinates =
| line=Fitchburg Route
Red Line Northwest Extension
| other=:
| platform= 1 island platform (Fitchburg Line)
2 split side platforms (Red Line)
| tracks=2 (Fitchburg Line)
2 (Red Line)
| bicycle=34 spaces
| mpassengers=
| opened=1845 (Fitchburg Railroad)
December 8, 1984 (Red Line)
| rebuilt=1897, 1937
| structure=
| accessible=yes
| zone=1A (commuter rail)
| former=Porter's Station, North Cambridge, Cambridge
| services= {{Adjacent stations|system1=MBTA
|line1=Fitchburg|left1=Belmont Center|right1=North Station
|line2=Red|left2=Davis|right2=Harvard
| other_services_header=Former services
| other_services_collapsible=yes
| other_services= {{Adjacent stations|system1=MBTA
|line1=Lexington|left1=Lake Street|right1=North Station|note-mid1=Closed 1977
|line2=Central Mass|left2=Waltham North|right2=North Station|note-mid2=Closed 1971
|system3=Boston and Maine Railroad|line3=Boston-Northampton|left3=Hill Crossing|right3=Boston
| mapframe = yes
| mapframe-marker-color = #000
| mapframe-marker = rail
| mapframe-zoom = 12
| map_state = collapsed
| route_map = {{Routemap
|legend=track
|inline=y
|map=
utSTR!~MFADEg\utSTR!~MFADEg
utSTRf\utSTRg!~POINTERg@fq\ ~~ ~~ ~~ *to *
utSHI1r\utSHI1l
RP42+4\RP4c3\utvPSTR-\utv-PSTR\\ ~~ Mass Ave.
RP4c1\RP4s+4\utvPSTR-\utv-PSTR\
SHI1c2q\lhvSTRa!~MSTRq!~RP4eRP2\utvPSTR-!~MSTRq!~hRP2q!~STR~Rq\utv-PSTR!~MSTRq!~hRP2q!~STR~Rq\RP2q!~STR~Rq\RP2q!~STR~Rq\RP2q!SHI1c3q ~~ Somerville Ave.
SHI1lq-!-STRq\RP4!~lhvSTR\utvSTR-!MRP4q!-PSTRq!~STR~Lq\utv-STR!MRP4q!-PSTRq!~STR~Lq-PSTRq!~STR~Lq-PSTRq!STR~Lq\SHI1+lq-!-STRq ~~ ~~ ~~ *to *
RP42+n\utvSTR2-!~RP4c3\utSTRc3!~utv-STR\
RP4c1\RP42+4!~utSTRc1\utvSTR+4-!~utv-STR!~RP4c3!~utlvNULfg\
RP4c1!~utSHI1c2\utvSHI1r-!~utv-SHI1l!~RP4s+4\utSHI1c3
utSTR~L!~MFADEf!~POINTERf@fq\utSTR~LR!~MFADEf!~RP4\utSTR~R!~MFADEf ~~ ~~ ~~ **
RP4!~MFADEf ~~ Mass Ave.
Porter station is a Massachusetts Bay Transportation Authority (MBTA) transit station in Cambridge, Massachusetts. It serves the Red Line rapid transit line, the MBTA Commuter Rail Fitchburg Line, and several MBTA bus lines. Located at Porter Square at the intersection of Massachusetts and Somerville Avenues, the station provides rapid transit access to northern Cambridge and the western portions of Somerville. Porter is 14 minutes from Park Street on the Red Line, and about 10 minutes from North Station on commuter rail trains. Several local MBTA bus routes also stop at the station.
A series of commuter rail depots have been located at Porter Square under various names since the 1840s. The modern station with both subway and commuter rail levels was designed by Cambridge Seven Associates and opened on December 8, 1984. At 105 ft below ground, the subway section is the deepest station on the MBTA system. The station originally had six artworks installed as part of the Arts on the Line program. Five of these remain, including Gift of the Wind and Glove Cycle.
History
Early history
There has been a railroad station at Porter Square since the Fitchburg Railroad began operations in the early 1840s. The first station, built in 1843–1845, was called Porter's Station. A new station building was constructed in 1854. Later stations at the site were known as North Cambridge, then later simply as Cambridge. In 1869, the original station was moved to the North Avenue (now Massachusetts Avenue) bridge over the tracks.
B&M era
::figure[src="https://upload.wikimedia.org/wikipedia/commons/0/09/Cambridge_station_1911_postcard.JPG" caption="Second station, built in 1897, on a postcard sent in 1911"] ::
A new station was built in 1897, slightly to the southeast, behind the Lovell Block. In 1927, the Fitchburg Cutoff became freight-only between the area and Somerville Junction. Passenger trains from the Lexington Branch and the Central Massachusetts Railroad were diverted to the Fitchburg mainline and began to stop at Cambridge station. In 1937–38, the Boston and Maine Railroad built a two-story brick depot by the bridge, with the ticket office at street level and the waiting room and platforms below. The new station opened on May 2, 1938; the old station was demolished to make room for a parking lot for the adjacent Sears, Roebuck and Company store. As passenger traffic declined, the B&M sold and leased disused station buildings; the Cambridge station was converted to office use by 1968.
MBTA era
By the time the newly formed Massachusetts Bay Transportation Authority (MBTA) began subsidizing northside commuter rail operations in the late 1960s, both the Lexington Branch and the Central Mass Branch had been reduced to single rush hour round trips on poorly maintained track. The South Sudbury run on the Central Mass was terminated on November 26, 1971. The Bedford round trip on the Lexington Branch ended after a major snowstorm on January 10, 1977, leaving the Fitchburg Line (with multiple daily round trips) as the only rail service at Cambridge station.
Adding the Red Line
::figure[src="https://upload.wikimedia.org/wikipedia/commons/7/7c/Former_temporary_stairs_at_Porter_station,_April_2013.JPG" caption="Rusted-out stairs from Somerville Avenue, used to access the commuter platform during the building of the modern station"] ::
In the late 1970s, Cambridge station was renamed to Porter when it became certain that the Red Line Northwest Extension would include a stop there. ("Cambridge", while sufficient for a commuter rail station, would have been confusing for a rapid transit station, because the Red Line has multiple stations—five in total—in the City of Cambridge.) The Red Line platforms were built in a deep-bore tunnel, while the commuter platform was rebuilt with an accessible mini-high platform. During construction, commuter trains were accessed via a staircase from Somerville Avenue. On September 30, 1980, construction worker Paul Leone was killed when a retaining wall collapsed.
A new glass and concrete headhouse was built around 1982, and the complete new transfer station opened on December 8, 1984, along with . A second entrance on the west side of Massachusetts Avenue was added in the late 1980s.
Because of its Red Line connection, Porter Square can serve as a temporary inbound terminus for the Fitchburg Line service when commuter rail service is disrupted between Porter and Boston's North Station. It served this role during the 2004 Democratic National Convention, when North Station was closed for a week for security purposes, and during Green Line Extension construction in 2015 and 2019–20. Additional weekday short turn service was operated between Porter and North Station from July 15–26, 2024, providing half-hour headways between those points while the Red Line was closed for maintenance work.
The staircase from Somerville Avenue was removed in 2020 during retaining wall reconstruction; a new staircase may be added later. An extension of the Union Square Branch of the Green Line Extension from to Porter has been proposed by local officials.
Station layout
::figure[src="https://upload.wikimedia.org/wikipedia/commons/8/8d/Commuter_train_at_Porter_1.jpg" caption="An outbound commuter rail train arrives at Porter in 2012"] ::
::figure[src="https://upload.wikimedia.org/wikipedia/commons/d/d2/Porter_escalator_looking_down.JPG" caption="Looking down the MBTA's longest escalator, at Porter station. This escalator runs from the fare mezzanine to the inbound subway platform level. The overhead graphics theme commemorates early railroad history."] ::
Porter station has a glass-covered headhouse located on the east side of Massachusetts Avenue just south of Somerville Avenue. The station has four below-ground levels.. The Fitchburg Line runs approximately east-west in an open cut, with a single island platform between the two tracks. Most of the platform is low, with a raised mini-high platform at the west end under Massachusetts Avenue. Direct stair entrances to the platform are located on both sides of Massachusetts Avenue.
A mezzanine, partially under Somerville Avenue east of White Street, is one level deeper. It contains fare machines, faregates for the Red Line, a convenience store, and – unusually for the MBTA system – public restrooms. Stairs, escalators, and elevators connect the mezzanine to the platforms and the surface. MBTA bus routes serve the station.
South of Porter Square, the Red Line runs north-south under Massachusetts Avenue. North of the square, the avenue turns to the northwest, while the Red Line runs north in a deep-bored tunnel to Davis Square. The Red Line platforms are mostly north of the headhouse, partially under the Porter Square Shopping Center. The subway tracks and platforms are enclosed in a single cylindrical concrete shell. The two platforms are at different levels, with the inbound (southbound) platform above and laterally offset from the outbound platform. The platforms are near the center of the shell, with the outbound track on the east side and the inbound track on the west side.
At 105 ft below ground level, the outbound platform is the deepest in the MBTA system. Passengers reach Red Line platforms via a series of escalators, stairs totalling 199 steps, or a set of elevators. The longest single span of the escalators is 143 feet, the longest in the MBTA system.
Accessibility
::figure[src="https://upload.wikimedia.org/wikipedia/commons/6/65/Elevators_at_Porter_station,_July_2019.JPG" caption="Commuter rail platform elevator (left) and Massachusetts Avenue elevator"] ::
Porter is fully accessible; elevators lead from street level to the mezzanine with its accessible bathrooms, to the commuter rail platform, and to both Red Line platform levels. Although most of the commuter platform is low, there is a "mini-high platform" – a one-car-length high section – that allows level boarding.
The station was originally built with three elevators: from Elm Street to the fare lobby, from the lobby to both Red Line platforms, and from the lobby to the commuter rail platform. The three existing elevators were overhauled, and two redundant elevators were added, in a $12 million project.
The elevator to the Red Line platforms was out of service for construction from March 21, 2011, to June 22, 2012; an accessible shuttle bus ran between Porter and . An elevator from Massachusetts Avenue to the lobby opened later that year, followed by an overhaul of the existing street elevator; the redundant Red Line platform elevator was completed in 2013.
Arts on the Line
As a part of the Red Line Northwest Extension, Porter was included as one of the stations involved in the Arts on the Line program, devised to bring art into the MBTA's subway stations in the late 1970s and early 1980s. It was the first program of its kind in the United States and became the model for similar drives for art across the country.
Six works, five of which remain, were placed at Porter:
- Gift of the Wind by Susumu Shingu, a 46 foot tall kinetic sculpture with three large red "wings" that rotate the structure in response to the wind
- Ondas by Carlos Dorrien, a 24 foot tall piece of undulating granite affixed to the station wall both inside the station and outside
- Glove Cycle by Mags Harries, a large number of bronze gloves of varying types and sizes scattered inside the station, including alongside one of the escalators
- Untitled by William Reimann, six granite bollards with various ethnic designs carved into them
- Porter Square Megaliths by David Phillips, four boulders with large "slices" removed and replaced with bronze casts of the missing pieces
- The Lights at the End of the Tunnel by William Wainwright, a large reflective mobile in the station's mezzanine. It was removed and put into storage in 1993 after a lead weight fell off.
References
References
- {{MBTA Commuter Rail 2024 ridership
- (June 22, 2020). "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation.
- {{NETransit
- "Red Line". Massachusetts Bay Transportation Authority.
- "MBTA Porter Square Station". Cambridge Seven Associates.
- (July 14, 1842). "Railroad to Fresh Pond". Boston Post.
- (1977). "Survey of Architectural History in Cambridge: Northwest Cambridge". Cambridge Historical Commission.
- (April 5, 1854). "New Depots". Boston Evening Transcript.
- The station is listed as "North Cambridge" on [[:File:Boston 1871 H. F. Walling & Orm Gray.jpg. 1871]] and [[:File:1898 Boston and Maine Railroad.jpg. 1898 maps]] and "Cambridge" on [[:File:Boston 1888 Sampson, Murdock & Co.jpg. 1888]], [[:File:1916 B&M.jpg. 1916]], and [[:File:1975 MBTA commuter rail map.jpg. 1975 maps]] from Wikimedia Commons.
- Karr, Ronald Dale. (1995). "The Rail Lines of Southern New England". Branch Line Press.
- Roy, John H. Jr.. (2007). "A Field Guide to Southern New England Railroad Depots and Freight Houses". Branch Line Press.
- (May 3, 1938). "Cambridge". Boston Globe.
- O'Connell, Richard W.. (August 18, 1968). "Old railroad depots take on new careers". Boston Globe.
- Prescott, Michael R.. (October 11, 2009). "Boston Transit Equipment 1979–2009". Boston Street Railway Association.
- Hirshson, Paul. (December 29, 1982). "Wakefield man critical after fall at T project". The Boston Globe.
- Operations Directorate Planning Division. (November 1990). "Ridership and Service Statistics". Massachusetts Bay Transportation Authority.
- Tran Systems and Planners Collaborative. (August 24, 2007). "Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report". Massachusetts Bay Transportation Authority.
- Howe, Peter J.. (February 18, 1988). "MBTA OK's funds for Saugus study". Boston Globe.
- (July 10, 2024). "MBTA Reminds Riders of Upcoming Red Line Service Suspension, Announces Update to This Weekend July 13 – 14 and Weekend of July 27 – 28's Red Line Service Changes". Massachusetts Bay Transportation Authority.
- (July 15, 2024). "Fitchburg Line Spring/Summer Schedule". Massachusetts Bay Transportation Authority.
- (October 5, 2020). "Porter Square Retaining Wall Repairs". Massachusetts Bay Transportation Authority.
- Levy, Marc. (March 1, 2022). "Lechmere, Union Square T stops open March 21 as council reminds of Porter Square connection". Cambridge Day.
- Daniel, Mac. (June 11, 2006). "Odd road sign is part of Boston trivia". Boston Globe.
- Fox, Lauren. (July 10, 2019). "For these people, every day is leg day at Porter Square Station". Boston Globe.
- Daniel, Mac. (March 2, 2005). "Man is strangled after clothing snags in MBTA escalator". Boston Globe.
- (April 10, 2006). "Settlement Agreement". Joanne Daniels-Finegold et al. v. MBTA.
- Parker, Brock. (March 6, 2011). "Work to shut down elevators at Porter Sq. T stop for a year". Boston Globe.
- (December 2011). "MBTA DEPARTMENT OF SYSTEM-WIDE ACCESSIBILITY FIXED ROUTE REPORT". Boston Region Metropolitan Planning Organization.
- Rocheleau, Matt. (June 22, 2012). "Elevator access returns to Porter Square T station after 15-month absence". Boston Globe.
- Massachusetts Bay Transportation Authority. (3 May 1985). "Red Line Northwest Extension".
- Temin, Christine. (August 31, 1997). "Answering the SOS for public art". The Boston Globe.
- Temin, Christine. (May 28, 1995). "Keeping art fit to a T". The Boston Globe.
::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::