Persian LNG


title: "Persian LNG" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["oil-and-gas-companies-of-iran", "proposed-liquefied-natural-gas-plants"] topic_path: "geography/iran" source: "https://en.wikipedia.org/wiki/Persian_LNG" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

Persian LNG is the LNG project in Iran. It has been defined based on the reserves of the South Pars gas field. The project is developed by the National Iranian Gas Export Company.

Technical description

Persian LNG project consists of development of phases 13 and 14 of South Pars Gas field and construction of two LNG trains each with capacity of 8.1 million tonnes per year. Liquefaction process was to be based on the Shell-Double Mixed Refrigrant Process.

The plant will be located in Tombak port (50 km North West of Asaluyeh and 15 km South East of Kangan) and will be connected with South Pars by 135 km long subsea pipeline with diameter of 32 in. | work = Reuters | url= http://uk.reuters.com/article/UK_COMPRESULTS/idUKL2581050020071025 | archive-url= https://archive.today/20130201210610/http://uk.reuters.com/article/UK_COMPRESULTS/idUKL2581050020071025 | url-status= dead | archive-date= February 1, 2013 | title = Shell says to take politics into account on Iran deal | date=2007-10-25 | accessdate=2008-03-08}} | newspaper = Upstream Online | publisher = NHST Media Group | url= http://www.upstreamonline.com/hardcopy/news/article147288.ece | title = Shell presses on with LNG tender round | date= 2008-01-18 | accessdate=2008-03-08 | url-access = subscription

The project is expected to cost US$10 billion and the LNG plant is expected to be commissioned by 2012. | work = Reuters | url= http://uk.reuters.com/article/oilRpt/idUKL2886631920070924 | archive-url= https://web.archive.org/web/20080323042428/http://uk.reuters.com/article/oilRpt/idUKL2886631920070924 | url-status= dead | archive-date= March 23, 2008 | title = Gas liquefaction terminal projects | date=2007-09-24 | accessdate=2008-03-08}} The project is in FEED stage.

The LNG plant was to be fed by gas from the South Pars phase 13; however, it was decided to be replaced by other phases.{{cite news | work = SHANA | title = Replacing phase 13 with other phases in Persian LNG | url = http://www.shana.ir/129403-en.html | date = 2008-04-22 | accessdate = 2012-02-07 | archive-url = https://web.archive.org/web/20110726205903/http://www.shana.ir/129403-en.html | archive-date = 2011-07-26 | url-status = dead

Project company

Project was originally seen as a partnership of NIOC (50%), Royal Dutch Shell (25%) and Repsol YPF (25%). In 2010, Shell and Repsol were excluded from the project. | work = IHS | url= http://www.ihs.com/products/global-insight/industry-economic-report.aspx?id=106594174 | title = Shell, Repsol Finally Evicted from Iran's Persian LNG Project | date=2010-07-06 | accessdate=2012-02-07}}

References

::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::

oil-and-gas-companies-of-iranproposed-liquefied-natural-gas-plants