From Surf Wiki (app.surf) — the open knowledge base

Ontario Line

The Ontario Line is a rapid transit line under construction in Toronto, Ontario, Canada. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Don Valley station, where it will connect with Line 5 Eglinton. Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line. The Ontario Line was announced by the Government of Ontario on April 10, 2019. As of August 2024, the estimated cost for the 15.6-kilometre (9.7 mi) line is CA$27 billion with an estimated completion in 2031. Originally, the cost was estimated at $10.9 billion with completion by 2027. A groundbreaking ceremony for the project took place on March 27, 2022. On April 20, 2026, tunnelling began using two tunnel boring machines.

Rendering article…

Content sourced from manual.

This content may have been generated or modified by AI, and may be sourced from third parties. CloudSurf Software LLC makes no warranties as to its accuracy, completeness, or reliability, and accepts no liability for it. Always verify important information against primary sources.

Report