Katse Dam


title: "Katse Dam" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["dams-in-lesotho", "hydroelectric-power-stations-in-lesotho", "dams-completed-in-1996", "energy-infrastructure-completed-in-1996"] topic_path: "general/dams-in-lesotho" source: "https://en.wikipedia.org/wiki/Katse_Dam" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

::data[format=table title="Infobox dam"]

FieldValue
nameKatse Dam
imageKatse Dam.jpg
image_captionKatse Dam
name_officialKatse Dam
dam_crossesMalibamatšo River
res_capacity_total1.950 km3
res_surface3580 ha
locationLesotho
ownerKingdom of Lesotho
dam_typeA
purposeIrrigation and domestic
dam_length710 m (2329 ft)
dam_height185 m (607 ft)
opening1996
coordinates
::

|name = Katse Dam |image = Katse Dam.jpg |image_caption = Katse Dam |name_official = Katse Dam |dam_crosses = Malibamatšo River |res_name = |res_capacity_total =1.950 km3 |res_surface =3580 ha |location =Lesotho |owner = Kingdom of Lesotho |dam_type = A |purpose =Irrigation and domestic |dam_length = 710 m (2329 ft) |dam_height = 185 m (607 ft) |dam_width_base = |construction_began = |opening = 1996 | coordinates = | extra =

The Katse Dam, a concrete arch dam on the Malibamatšo River in Lesotho, is Africa's second largest double-curvature arch dam after the Tekezé Dam in Ethiopia. Located just below the confluence of the Bokong River, which forms the western arm of the Katse reservoir, the dam is part of a larger project which will eventually include five large dams in remote rural areas.

The potential of the project was identified by the South African civil engineer Ninham Shand in 1953 as a possible means to supplement the water supply of South Africa's industrial heartland in the Witwatersrand. The World Bank arranged a treaty between the governments of South Africa and Lesotho, allowing the project to proceed.

Construction

The dam was built by a consortium of Bouygues, Concor, Group 5, Hochtief, Impregilo, Kier Group and Sterling International. The dam was completed in 1996 and the reservoir filled with water by 1997. The total cost of the project was US$8 billion. Katse Airport was constructed 3 km southeast of the dam to facilitate access to the project.

Environmental impact

The mass of water gave rise to induced seismicity. Farmers who lost land to the project have had trouble re-establishing new livelihoods. There is little arable land in the mountains to replace all that was lost, and efforts to help them with new livelihoods have by no means been as successful as the engineering works. A local group has documented the project's human legacy in the rural communities directly affected by the project, and the environmental and human-rights NPO, International Rivers, produced a detailed account of the effects.

::figure[src="https://upload.wikimedia.org/wikipedia/commons/a/a1/Katse_Dam_satellite.jpg" caption="Satellite view of the reservoir"] ::

As mitigation of the loss of habitat, plant rescue missions were conducted in the area to be flooded, and Katse Botanical Gardens was established to house and propagate the plants rescued.

Water delivery

::figure[src="https://upload.wikimedia.org/wikipedia/commons/f/f1/Katze_Dam_Malibamatso_River.webm" caption="Aerial video footage of the Katse Dam."] ::

Water from the dam first travels through a 45 km, 4 m diameter tunnel, exiting at a hydroelectric station near Muela. The dam's high elevation allows a gravity flow water delivery system to South Africa, in addition to hydroelectric power for Lesotho, and was a prime reason behind the choice of site.

Water delivery officially began on 22 January 1998. The dam currently supplies about 30 m3/s of water to South Africa, which pays Lesotho $35 million per year, plus a variable royalty based on calculated water usage benefits.

In recent years, water from the scheme has also been discharged into the Mohokare (Caledon) River to provide water to Lesotho's capital Maseru in times of shortages. The new dams have filled as anticipated and discharge of water from the dams into the downstream rivers continues in a scheme devised to preserve ecological balances. This discharged water flows to the Senqu (Orange) River, and while preserving the ecological status quo, it benefits only those communities along the rivers. Schemes to provide water supplies to displaced Highlands farmers have not been very successful.

The dam project has also been a source of widespread corruption, which is not uncommon with large dam projects. The Lesotho courts have taken the unusual step of prosecuting the large companies involved in the scandal in addition to the Lesotho bureaucrat who took the bribes. Thus far, there have been a number of convictions and at least one company debarred by the World Bank for its role in the scandal.

Intake tower water transfer

The intake tower is located approximately 18 km north of Katse Dam and has been designed to accommodate 70 m3/s which was the maximum transfer originally envisaged for full implementation of the LHWP. The intake tower is 23 m in diameter and 98 m high to accommodate the large range in reservoir storage elevation as well as to facilitate the draw-off at four distinct lake levels. This will enable the quality of the transferred water to be controlled at all times. Due to the position and design of the intake tower, there is a certain volume of water in the reservoir that cannot be accessed via the transfer tunnels. This dead storage is approximately 430,000,000 m3, with the result that the effective live storage behind Katse Dam is reduced from the total storage capacity of 1,950 million m³ to 1,520 million m³.

Dam features

::figure[src="https://upload.wikimedia.org/wikipedia/commons/c/c5/Katse_Dam-001.jpg" caption="Alternative view of Katse Dam"] ::

  • Height - 185 m (second tallest in Africa)
  • Crest length - 710 m
  • Design - double arch, concrete
  • Concrete - 2,320,000 m3
  • Elevation - 1993 m above sea level (highest elevation dam in Africa)

References

References

  1. Unknown. (1970). "Orbituary: Ninham Shand, BSc". ICE Virtual Library.
  2. [http://www.thecornerhouse.org.uk/item.shtml?x=52182#appendix-01-01-00-00 Corner House - LHWP review]
  3. "Lesotho Highlands Water Project: What Went Wrong?".
  4. "Earthquakes force families to abandon village".
  5. [http://www.trc.org.ls/ Transformation Resource Centre]
  6. [http://www.irn.org/programs/lesotho/pdf/pipedreams.pdf Pipe Dreams, 2001, Ryan Hoover, International Rivers] {{webarchive. link. (2007-08-19)
  7. "Katse Botanic Garden". [[Botanic Gardens Conservation International]].
  8. "Muela Dam".
  9. "Corruption corner".

::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::