Bowdoin station

Subway station in Boston, Massachusetts, US


title: "Bowdoin station" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["beacon-hill,-boston", "blue-line-(mbta)-stations", "government-center,-boston", "railway-stations-in-the-united-states-opened-in-1916", "railway-stations-located-underground-in-boston", "west-end,-boston"] description: "Subway station in Boston, Massachusetts, US" topic_path: "geography/united-states" source: "https://en.wikipedia.org/wiki/Bowdoin_station" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0

::summary Subway station in Boston, Massachusetts, US ::

::data[format=table title="Infobox station"]

FieldValue
nameBowdoin
styleMBTA
imageOutbound train at Bowdoin station Oct 2024.jpg
image_captionA Wonderland-bound train at Bowdoin station in 2024
altA subway train at an underground platform with white tiled columns
addressCambridge Street at New Chardon Street
boroughBoston, Massachusetts
coordinates
lineEast Boston Tunnel
platform1 wedge-shaped island platform
tracks1 balloon loop
passengers2,127 boardings (weekday average)
pass_yearFY2019
openedMarch 18, 1916
closedJanuary 3, 1981–January 11, 1982
March 3, 1982–April 20, 1982
rebuilt1924, 1968
structureUnderground
accessibleNo
services
mapframeyes
mapframe-marker-color#
mapframe-markerrail-underground
mapframe-zoom13
map_statecollapsed
route_map{{Routemap
legendtrack
inliney
topCambridge Street is omitted
RP2q\RP2q\RP2q\utSTRc2!~RP2q\utvSTR3-!~utv-STR!~RP2q\RP2q ~~ ~~ ~~ Sudbury St.Somerset St.
RP4q\utkvSTR2~r!~RP4q\RP4q\RP4q\uextv-STR!~utkvSTR3~l!~RP4q\RP4q ~~ ~~ ~~ New Chardon St.Bowdoin St.
::

| name=Bowdoin | style=MBTA |style2=Blue | image=Outbound train at Bowdoin station Oct 2024.jpg | image_caption=A Wonderland-bound train at Bowdoin station in 2024 | alt=A subway train at an underground platform with white tiled columns | address=Cambridge Street at New Chardon Street | borough=Boston, Massachusetts | coordinates= | line=East Boston Tunnel | other= | platform=1 wedge-shaped island platform | tracks=1 balloon loop | bicycle= | passengers=2,127 boardings (weekday average) | pass_year=FY2019 | opened=March 18, 1916 | closed=January 3, 1981–January 11, 1982 March 3, 1982–April 20, 1982 | rebuilt=1924, 1968 | structure=Underground | accessible=No | services= | mapframe = yes | mapframe-marker-color = # | mapframe-marker = rail-underground | mapframe-zoom = 13 | map_state = collapsed | route_map = {{Routemap |legend=track |inline=y |top=Cambridge Street is omitted |map= \\utvSTR!~MFADEg \\utvSTRfg ~~ ~~ ~~ *to * RP2q\RP2q\RP2q\utSTRc2!~RP2q\utvSTR3-!~utv-STR!~RP2q\RP2q ~~ ~~ ~~ \utSTRc2\PLT◢!~MSTR3+1!~utSTR3+1\utvPLT-STR!~MSTRc4
\PLT◢!~MSTR3+1!~utSTR3+1\PLT!~MSTRc4!~utSTRc4\utvPLT-STR PLT◢!~MSTR3+1!~MASKl!~utvSTR+1-\PLT◤!~MSTRc4!~utSTRc4\utvPLT-STR ~~ ~~ ~~ ends utvSTR-\\utvPLT-STR RP4q\utkvSTR2~r!~RP4q\RP4q\RP4q\uextv-STR!~utkvSTR3~l!~RP4q\RP4q ~~ ~~ ~~ utkvSTRc1\utkvSTRl+4~r\uextkvSTR2+r~r!~utkvSTRr+1~l\utkvSTRc4!~uextv-STR ~~ Balloon loop \uextkvSTR-c1\uextkvSTR+4~r!~uextv-STR \\uextvÜSTxr \\uextvSTR \\uextvENDEe

Bowdoin station ( ) is a Massachusetts Bay Transportation Authority (MBTA) rapid transit station in Bowdoin Square in Boston, Massachusetts. The station is the downtown terminus of the Blue Line, part of the MBTA subway system. It has a single wedge-shaped island platform located inside a balloon loop. Bowdoin is the only Blue Line station that is not accessible.

Bowdoin opened in 1916 as part of an extension of the East Boston Tunnel, serving as the terminal for streetcar lines from East Boston. The line was converted to use high-floor trains in 1924, with raised platforms constructed at the stations. The station was modernized in 1968, with a new brutalist headhouse designed by Josep Lluís Sert. Bowdoin was closed for two periods in the early 1980s due to budget cuts; it was open for limited hours on weekdays only until 2014, when it returned to full-time service during the reconstruction of nearby Government Center station. The proposed Red Blue Connector would extend the Blue Line west to a Red Line transfer at Charles/MGH station, with Bowdoin station likely eliminated.

Station design

::figure[src="https://upload.wikimedia.org/wikipedia/commons/7/77/Bowdoin_station_plan,_1986.png" caption="A 1986 plan of the station" alt="See caption"] ::

The station is located under Cardinal Cushing Memorial Park, a triangular public plaza at the northeast corner of Bowdoin Square – the intersection of Cambridge Street with Bowdoin Street and New Chardon Street, located at the junction of Beacon Hill neighborhood and the Government Center area. The single entrance to the station is near the east end of the park, with a small sunken plaza 4 feet below the rest of the park and a concrete triangular prism headhouse.

Bowdoin station has a single wedge-shaped island platform (two side platforms that intersect at their east ends) about 20 feet below the surface. Six-car trains are able to fit on the westbound platform, but the eastbound section of the platform is only long enough for four cars. Since the Blue Line uses six-car trains, doors cannot be automatically opened; passengers must use pushbuttons on the outside of the train to open doors.

The fare lobby, slightly higher in elevation than the platform, is located in the center of the station. A ramp leads from the fare lobby to the east end of the platform, with stairs connecting the west end of the westbound side of the platform to the lobby. Stairs and an up escalator lead from the lobby to the surface. The station floor is terrazzo, and the walls brown enameled brick. The walls of the track area plus the ceilings are the painted concrete of the tunnel structure. Trim and fittings are primarily stainless steel; columns on the platform are covered with white enamel tile and trimmed with stainless steel.

History

Streetcar station

::figure[src="https://upload.wikimedia.org/wikipedia/commons/5/52/Bowdoin_station,_January_1916.jpg" caption="Bowdoin station in January 1916, shortly before opening" alt="A black-and-white photo of an underground streetcar station"] ::

The East Boston Tunnel was opened to Boston Elevated Railway (BERy) streetcar service as far as Court Street on December 30, 1904. Court Street proved to be a problematic terminus; its stub-end single-track design limited frequent service and resulted in several fatal crashes. The extension ran from Scollay Square (where a new platform was constructed to replace Court Street station) to a new station and loop at Bowdoin Square. Tracks continued west under Cambridge Street to an incline at Joy Street, where streetcars could continue on surface tracks to Charles Street and the Longfellow Bridge to Cambridge.

Bowdoin was built with a wedge-shaped island platform inside a balloon loop, which eliminated the awkward end-changing required at Court Street and allowed use of unpowered trailer cars in the tunnel to increase capacity. The station had two staircase entrances at the west end of Bowdoin Square, adjacent to the Parkman building. The finish of Bowdoin and Scollay Under stations was similar to Washington station (opened 1915) and the Boylston Street subway stations (1914): granolithic platforms, wainscotting of white polished terrazzo, and white plaster upper walls and ceiling. Bands of ceramic tile trimmed the wainscotting; at Bowdoin, the tile was dark blue.

Construction of the station began on March 2, 1914; 247 men were employed for the work. Several buildings had to be underpinned to allow the loop to be built underneath them. Construction of the station was completed on December 4, 1914, with finish work following. Bowdoin station opened on March 18.

Modifications

::figure[src="https://upload.wikimedia.org/wikipedia/commons/1/10/Bowdoin_station_headhouse_from_the_east,_April_2017.JPG" caption="The 1968-built headhouse in April 2017" alt="A glass and concrete subway entrance in an urban plaza"] ::

Though originally planned to use high-floor rapid transit trains, the East Boston Tunnel opened with streetcars serving low-platform stations. Large bi-loading streetcars (with high floors but capable of loading from low platforms), which incorporated many attributes from metro cars used on the Main Line El, began use in 1905. However, neither these nor the large center-entrance cars introduced in 1917 (which were designed for multiple unit operation) could fully handle the crowds.

In 1921, the Boston Transit Department (BTD) – the successor to the BTC – began work at Maverick Square to convert the East Boston Tunnel to high-floor metro trains. The next year, the BTD board approved the construction of high-level platforms at Atlantic Avenue, Devonshire, Scollay Under, and Bowdoin. Construction of concrete high-level platforms 40 in above the rails at Bowdoin began in December 1923 or January 1924. A section of low-level platform was left to serve streetcars during construction. Temporary wooden platform sections were put in place to allow service to begin on April 21, with the permanent concrete sections completed by July 12. The Bowdoin platform was also extended 28 feet east from August 27 to December 12.

Rather than modify the tunnel, the BERy elected to build smaller-than-usual rapid transit cars which could operate in a tunnel designed for streetcars—particularly around the tight loop at Bowdoin. Blue Line cars are thus 48.5 feet long, substantially shorter than the 65 feet Orange Line cars and the 69.5 feet Red Line cars. Because the line did not have a dedicated heavy maintenance facility, major repair work was performed at Eliot Shops – the main maintenance facility for the Cambridge–Dorchester line. Trains used the former streetcar portal west of Bowdoin and ran on surface streetcar tracks on the Longfellow Bridge, which connected to the Cambridge–Dorchester line tracks near Kendall Square. When the first phase of the Revere Extension opened to with a new maintenance facility in 1952, the connection was no longer necessary and the portal was filled.

The newly formed Massachusetts Bay Transportation Authority (MBTA) assigned colors to the four MBTA subway lines in 1965, with the East Boston Tunnel and Revere Extension becoming the Blue Line. The original entrances at the west end of the station were replaced with a glassy entrance under a tilted concrete slab, set into a shallow depression to reduce the costs of installing the escalator. Illustrations showing the history of Bowdoin Square were added to the station signs. Bowdoin was closed during part of the renovations and reopened on March 7, 1968. The station was surveyed in 1984 and 1987 for potential inclusion on the National Register of Historic Places; it was concluded that the 1924 and 1968 reconstructions had left little of the original station, and that it was of minor significance within the system.

Closures and reopening

::figure[src="https://upload.wikimedia.org/wikipedia/commons/c/ca/Bowdoin_station_island_platform,_November_2015.JPG" caption="The east end of the platform in 2015" alt="A wide subway platform with white columns"] ::

In the early 1980s, the MBTA suffered from a serious budget crisis, which resulted in service cuts. MBTA Commuter Rail service to and Concord and on the Woburn Branch was cut entirely, five underused commuter rail stations were closed, and Essex were closed for short periods, and the outer ends of the Orange and Blue lines were bustituted on Sundays.

The station was closed from July 29 to September 8, 1992, during track work on the loop. In 2008, the MBTA began running six-car trains on the Blue Line. Because the eastbound side of the Bowdoin platform can only fit four cars, the MBTA had originally planned to close the station when six-car trains entered service; a planned renovation of Government Center station was to add a second headhouse close to Bowdoin Square. However, the station was kept open, with only four cars on each eastbound train berthed at the platform.

Until at least 2011, the MBTA still planned to close the station after Government Center was renovated. However, by 2013, the MBTA decided not to construct the planned west entrance at Government Center, and to instead build only a less-expensive emergency exit. On December 28, 2013, the MBTA resumed night and weekend service to Bowdoin station. The change was intended to provide alternative transportation during the three-month closure of the Callahan Tunnel and subsequent two-year closure of Government Center station. This was the first time since 1981 that the station was open during all operating hours. Daily ridership at the station increased from 1,526 in 2013 to 2,127 in FY 2019.

The reconstructions of Government Center in 2014–16 left Bowdoin as the only non-accessible metro station on the Blue Line; aside from street-level light rail stops, Bowdoin is one of only four non-accessible MBTA subway stations. In 2019, the MBTA indicated that Bowdoin was a "Tier II" accessibility priority pending the results of conceptual design.

Red Blue Connector

The Red Blue Connector is a proposed extension of the Blue Line under Cambridge Street to Charles/MGH station, about 0.4 miles west of Bowdoin, where a transfer to the Red Line would be available. The project was first proposed in 1924, and returned to consideration in the 1978 update to the Program for Mass Transportation, although extensions from Bowdoin or Government Center to were proposed in 1926 and 1978. In 1991, the state agreed to build a set of transit projects as part of an agreement with the Conservation Law Foundation (CLF), which had threatened a lawsuit over auto emissions from the Central Artery/Tunnel Project (Big Dig). Among the projects was the Red Blue Connector, to be completed by 2011. This commitment was changed to design only in 2007–08 and lifted entirely in 2015.

Original plans for the connector in 1986 called for a cut-and-cover extension west from Bowdoin Yard, with Bowdoin station retained without significant modifications. The 2010 Draft Environmental Impact Report instead called for a pair of deeper tunnels bored by a tunnel boring machine (TBM), starting east of Bowdoin station and passing underneath the existing platform. Alternatives with a replacement Bowdoin station west of Bowdoin Street, and without a replacement station, were considered; the latter was recommended due to lower cost and reduced travel time. A 2018 update which analyzed multiple tunneling methods only considered an extension without a replacement Bowdoin station, as did a 2020 conceptual design. A 2021 conceptual design raised the possibility of retaining the loop as a storage track.

References

References

  1. (June 22, 2020). "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation.
  2. Public Archaeology Laboratory. (March 2010). "Red Line/Blue Line Connector Project: Draft Alternatives Analysis Technical Report". Massachusetts Department of Transportation.
  3. (March 2010). "Red Line/Blue Line Connector Project: Draft Alternatives Analysis Technical Report". Massachusetts Department of Transportation.
  4. {{NETransit
  5. (October 7, 1906). "Three Car Victims". Boston Globe.
  6. (1913). "Annual report of the Boston Transit Commission for the year ending June 30, 1913". Boston Transit Commission.
  7. (1915). "Annual report of the Boston Transit Commission for the year ending June 30, 1915". Boston Transit Commission.
  8. (1917). "Atlas of the city of Boston : Boston proper and Back Bay : from actual surveys and official plans". G.W. Bromley & Co.
  9. (1916). "Annual report of the Boston Transit Commission for the year ending June 30, 1916". Boston Transit Commission.
  10. (March 18, 1916). "Few Used New Bowdoin Sq Tunnel Immediately After its Opening". Boston Globe.
  11. (August 12, 1916). "Boston Profits By Elevated Railway Station Improvements". McGraw-Hill.
  12. Cheney, Frank. (2003). "Boston's Blue Line". Arcadia Publishing.
  13. (1963). "Surface cars of Boston, 1903–1963". New England Electric Railway Historical Society.
  14. (1922). "Annual Report of the Transit Department for the Year Ending January 31, 1922". Boston Transit Department.
  15. (1923). "Annual Report of the Transit Department for the Year Ending January 31, 1923". Boston Transit Department.
  16. (1924). "Annual Report of the Transit Department for the Year Ending January 31, 1924". Boston Transit Department.
  17. (1925). "Annual Report of the Transit Department for the Year Ending January 31, 1925". Boston Transit Department.
  18. Belcher, Jonathan. (January–February 2020). "MBTA Vehicle Inventory as of February 29, 2020". Boston Street Railway Association.
  19. Cudahy, Brian J.. (1972). "Change at Park Street Under; the story of Boston's subways". S. Greene Press.
  20. (1968). "Fourth Annual Report (Covering the period October 1, 1967 – October 31, 1968) of the Board of Directors of the Massachusetts Bay Transportation Authority". Massachusetts Bay Transportation Authority.
  21. Yudis, Anthony. (December 4, 1966). "'Sunken' Subway Kiosk Proposed". Boston Globe.
  22. (April 9, 2001). "Ask the Globe". Boston Globe.
  23. Osborne, Catherine R.. (2018). "American Catholics and the Church of tomorrow: building churches for the future, 1925-1975". University of Chicago Press.
  24. Alonso, Jessica. (April 5, 1977). "Art from underground". Boston Globe.
  25. Plotkin, A.S.. (December 28, 1967). "New Bowdoin Snubs Old Howard". Boston Globe.
  26. (March 7, 1968). "New Bowdoin Station Is Officially Opened". Boston Globe.
  27. (September 15, 2008). "Six-Car Trains on the Blue Line". Massachusetts Bay Transportation Authority.
  28. (June 30, 2006). "DEP/EOT Amended Administrative Consent Order AC0-BO-00-7001-AMENDMENT #2: 2006 Annual Report and 9th Status Report". Massachusetts Department of Transportation.
  29. Massachusetts Bay Transportation Authority. (June 19, 2019). "Answer: Yes Thanks for your question. Have a good evening!".
  30. Moskowitz, Eric. (October 5, 2011). "MBTA board OK's millions for station improvements". Boston Globe.
  31. (March 13, 2013). "Government Center Station Reconstruction Project Green Line / Blue Line Project Briefing". Massachusetts Bay Transportation Authority.
  32. (December 23, 2013). "Callahan Tunnel closes Friday night at 11pm". Massachusetts Bay Transportation Authority.
  33. {{MBTA Bluebook 2014
  34. "MBTA Stations". Massachusetts Bay Transportation Authority.
  35. (April 1, 2019). "Preview of 2019 Recommendations: Presentation to the FMCB". Massachusetts Bay Transportation Authority.
  36. (December 9, 1924). "Plans For New Tunnel Station". Boston Globe.
  37. Central Transportation Planning Staff. (November 15, 1993). "The Transportation Plan for the Boston Region – Volume 2". National Transportation Library.
  38. (December 1926). "Report on Improved Transportation Facilities in Boston". Division of Metropolitan Planning.
  39. United States Environmental Protection Agency. (October 4, 1994). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts—Amendment to Massachusetts' SIP (for Ozone and for Carbon Monoxide) for Transit Systems Improvements and High Occupancy Vehicle Facilities in the Metropolitan Boston Air Pollution Control District)". Federal Register.
  40. Palmer, Thomas C. Jr.. (September 13, 1994). "Commitments to foes raise Artery price tag". The Boston Globe.
  41. Howe, Peter J.. (January 9, 1991). "Agency: Artery pact will cost $4b". The Boston Globe.
  42. United States Environmental Protection Agency. (July 31, 2008). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Amendment to Massachusetts' State Implementation Plan for Transit System Improvements". Federal Register.
  43. (July 2, 2007). "State Implementation Plan – Transit Commitments: Status Report". Executive Office of Transportation.
  44. United States Environmental Protection Agency. (December 8, 2015). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Transit System Improvements". Federal Register.
  45. Seelye Stevenson Value & Knecht. (December 1986). "Bowdoin Station and Charles Street Station Connector Project Feasibility Study". Massachusetts Bay Transportation Authority.
  46. (March 2010). "Red Line/Blue Line Connector Project: Draft Environmental Impact Report". Massachusetts Department of Transportation.
  47. (October 2018). "Summary Memorandum: Tunnel Constructability Study: Update to the 2010 DEIR for the Red Line/Blue Line Connector". Massachusetts Department of Transportation.
  48. Stoothoff, Erik. (June 7, 2021). "Red Blue Connector". Massachusetts Bay Transportation Authority.
  49. (November 15, 2021). "Red Blue Connector Concept Design Report". Massachusetts Bay Transportation Authority.

::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::

beacon-hill,-bostonblue-line-(mbta)-stationsgovernment-center,-bostonrailway-stations-in-the-united-states-opened-in-1916railway-stations-located-underground-in-bostonwest-end,-boston