Arborway station

Boston MBTA former subway station
title: "Arborway station" type: doc version: 1 created: 2026-02-28 author: "Wikipedia contributors" status: active scope: public tags: ["green-line-(mbta)-stations", "former-railway-stations-in-boston", "former-mbta-stations-in-massachusetts", "1985-disestablishments-in-massachusetts", "railway-stations-in-the-united-states-closed-in-1985", "jamaica-plain,-boston"] description: "Boston MBTA former subway station" topic_path: "geography/united-states" source: "https://en.wikipedia.org/wiki/Arborway_station" license: "CC BY-SA 4.0" wikipedia_page_id: 0 wikipedia_revision_id: 0
::summary Boston MBTA former subway station ::
::data[format=table title="Infobox station"]
| Field | Value |
|---|---|
| name | Arborway |
| style | MBTA |
| image | MBTA 3202 at Arborway in 1967.jpg |
| image_caption | A train arrives at Arborway in 1967 |
| coordinates | |
| platform | 2 |
| tracks | 1 |
| closed | December 28, 1985 |
| other_services_header | Former services |
| other_services | |
| mapframe | yes |
| mapframe-zoom | 15 |
| mapframe-marker-color | #888 |
| mapframe-marker | rail-light |
| :: |
| name=Arborway | style=MBTA |style2=Green | image=MBTA 3202 at Arborway in 1967.jpg | image_caption=A train arrives at Arborway in 1967 | address= | coordinates = | line= | other= | platform= 2 | tracks=1 | parking= | bicycle= | passengers= | pass_year= | opened= | closed=December 28, 1985 | rebuilt= | accessible= | code= | zone= | other_services_header=Former services | other_services= | mapframe = yes | mapframe-zoom = 15 | mapframe-marker-color = #888 | mapframe-marker = rail-light
Arborway station was an MBTA light rail stop and bus transfer location in Boston, Massachusetts. It served the MBTA Green Line E branch. It was located in Arborway Yard near the Forest Hills station complex. It closed in 1985 when the outer section of the branch was temporarily—and ultimately permanently—closed.
History
::figure[src="https://upload.wikimedia.org/wikipedia/commons/e/e1/Forest_Hills_streetcar_loops_in_2006.jpg" caption="1987-built trolley loop at Forest Hills, never used by trolleys, was instead used for the route 39 bus service"] ::
On December 12, 1895, the West End Street Railway opened its Forest Hills Yard with a 12-track carhouse on the east side of Washington Street, serving newly electrified streetcar lines. The Boston Elevated Railway (BERy), successor to the West End, opened a second carhouse on the site two years later. In 1913, the BERy opened a ramp from the Washington Street Elevated into a small yard inside the complex. The ramp was disused after six months, and was removed in 1922.
On March 1, 1924, the BERy opened a streetcar transfer station inside the yard to relieve crowding at Forest Hills station. The Jamaica Plain via South Huntington line was soon extended to Arborway, improving connections with the other lines. The BERy replaced the older carhouses with a new six-track carhouse and a bus garage in 1924–25. Buses gradually replaced streetcars; all of the Arborway-terminating lines except the South Huntington line (Arborway Line, later Green Line E branch) were converted to bus by 1956. In 1962, the MTA opened its headquarters building at 500 Arborway.
Arborway closed on December 28, 1985 when the line was "temporarily" suspended and ultimately closed. When the new Forest Hills station was opened in 1987, a loop for the E branch was included as part of the station complex, so that Arborway would only be used for layovers and maintenance. No streetcar ever used the station, which was instead later used for route 39 buses from 2000 to 2017. The Arborway carhouse remained until 2001 when it was demolished and replaced by a smaller facility for CNG-powered buses.
The MBTA plans to construct a two-level garage on the eastern portion of the site where the largely-disused 500 Arborway building is located. It will expand the Arborway-based fleet from 118 CNG buses to 200 battery-electric buses. This will include 60 ft buses to move routes and from Southampton Garage and convert route to 60-foot buses. The western portion of the site will be reserved for mixed-use development. The project was paused in mid-2025 due to a lack of funding, and would take 5-6 years to design and build once funded. State funding for the garage was announced in October 2025 as part of an $850 million transfer from the Commonwealth Transportation Fund to the MBTA.
References
References
- (1925). "Annual Report of the Public Trustees of the Boston Elevated Railway for the Year Ending December 31, 1924". Boston Elevated Railway.
- (March 26, 1924). "West Roxbury District". Boston Globe.
- (December 16, 1924). "West Roxbury District". Boston Globe.
- (1926). "Annual Report of the Public Trustees of the Boston Elevated Railway for the Year Ending December 31, 1925". Boston Elevated Railway.
- Heath, Richard. (May 16, 2013). "A History of Forest Hills". Jamaica Plain Historical Society.
- {{NETransit
- HNTB. (March 12, 2012). "Casey Overpass Planning and Concept Design Study". Massachusetts Department of Transportation.
- (June 22, 2023). "New Arborway Bus Maintenance Facility and MBTA Bus Electrification Project: 15% Design Public Meeting". Massachusetts Bay Transportation Authority.
- (February 28, 2025). "Montano, Miranda tell JPNC that Arborway Garage Project is Dead". Jamaica Plain Gazette.
- (June 25, 2025). "Bus Facility Modernization Update".
- (October 23, 2025). "MBTA Board of Directors Approves $850 Million in Funding from Healey-Driscoll Administration to Enhance Safety, Reliability". Massachusetts Bay Transportation Authority.
::callout[type=info title="Wikipedia Source"] This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page. ::